Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Connecticut was posted on July 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Municipal Virtual Net Metering (VNM) Offtake Solar Developer

Closed
RFP 2026-01State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Fresno County

POSTED

5 days ago

DEADLINE

N/A
NAICS: 221114
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is seeking to establish a Qualified Vendors Pool of energy service providers to design, install, operate, and maintain clean-energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties. This initiative utilizes a third-party financing model where selected vendors provide turnkey solutions with no upfront capital requirements from the state. Projects will be governed by long-term Site Lease Agreements and Power Purchase Agreements spanning twenty to twenty-five years, with electricity priced at a fixed rate per kilowatt hour. Qualified vendors will be eligible to bid on subsequent Requests for Proposals for specific installations across a diverse geographic range in California. To qualify for the pool, respondents must pass a comprehensive evaluation on a pass/fail basis, which includes a review of completeness and verification of submitted information. Mandatory requirements include providing evidence of adequate bonding capacity, creditworthiness from recognized rating agencies, and a commitment letter from financing partners. Vendors must hold active California registration and appropriate licensing, such as C-10 Electrical or C-46 Solar licenses, and must comply with the Darfur Contracting Act. Responses, including a Statement of Qualifications and required certifications, must be submitted by December 23, 2026.
California Department of General Services

POSTED

21 days ago

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Town of Stratford is inviting proposals from solar developers to implement virtual net metering (VNM) solutions through new solar photovoltaic systems. The primary objective of this contract is to offset up to 5,300,000 kWh annually from the town’s municipal electrical load, leveraging the Non-residential Renewable Energy Solutions (NRES) program managed by United Illuminating. The initiative specifically focuses on State, Agricultural, and Municipal properties within the UI service territory. The solicitation outlines participation in the August/September 2025 bid round (Year 4 of NRES), with an option to participate in the February/March 2026 bid round (Year 5) if necessary. The anticipated performance period runs from July 22, 2025, to August 21, 2025. All vendors are welcome to respond, with no particular certifications required highlighted in the solicitation. The estimated contract value ranges between $4,000,000 and $8,000,000, and proposals must be submitted in accordance with specific instructions provided, notably not through electronic means. The successful proposer will be expected to provide systems fully compliant with program requirements and capable of delivering the VNM offtake required to offset the town's energy demand.

General Info

Town of Stratford seeks solar developers for virtual net metering to offset 5.3 million kWh annually.

Place of Performance

CT, USA

Set-Aside

NONE

Documents

1

RFP 2026-01 Municipal Virtual Net Metering Offtake Solar Developer

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyConnecticut → Town of Stratford
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Town of Stratford (“Town”) seeks Proposals from qualified solar developers (the “Proposers”) to provide municipal Virtual Net Metering (“VNM”) offtake from a solar photovoltaic clean energy system or systems (“System/s”) in United Illuminating (“UI”) territory that will offset up to 5,300,000 kWh/year of the Town’s electrical load. The System(s) would participate in the August/September 2025 bid round of Year 4 of the Non-residential Renewable Energy Solutions program (the “NRES Program”), with VNM for State, Agricultural, and Municipal (“SAM”) properties, administered by UI, and if necessary, the February/March 2026 bid round of Year 5 of the NRES Program. ***DO NOT SUBMIT BIDS ELECTRONICALLY***

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS