Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on November 30, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Name Brand or Equal Plastic T&G Azek Porch Decking

Awarded
Q1574121001AFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The National Park Service is soliciting quotes for a firm fixed price contract to purchase plastic tongue and groove porch decking and stainless steel fasteners for the historic Administration Building at Yellowstone National Park. This requirement is a 100 percent small business set-aside under NAICS codes 321113 or 326199. The materials must be equal to or better than AZEK Porch decking, featuring a sustainable composition of recycled hardwoods, PVC, and agrifiber filler with a simulated wood grain finish in a natural wood or slate gray color. Specific dimensions include 12 foot lengths and a 1 inch thickness with a 3-1/8 inch finished face width to match the original historic decking. The contract includes the procurement of 1,000 decking boards and 12,000 stainless steel trim head screws. Delivery is required within 14 days after receipt of order, and vendors offering an equal product must provide a sample for evaluation. Awards will be based on a technically acceptable/low price evaluation, considering technical elements, price, and past performance. Amendment 0001 specifically modified the requirement to remove the word predrilled from the line item area.

General Info

Contract Value

$33,130

NAICS

326199 - All Other Plastics Product Manufacturing

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
AMENDMENT 0001 - This amendment is to remove the words "predrilled" from the line item area of the requirement. All other information remains the same. 1. GENERAL INFORMATIONThis is a COMBINED SYNOPSIS / SOLICITATION for commercial items prepared in accordance with the format in the Federal Acquisition Regulations (FAR) Subpart 12.6, as supplemented with additional information included in this notice. The National Park Service contemplates award of a firm fixed price contract as a result of this combined synopsis/solicitation to the vendor; providing the best value to the Government. This announcement constitutes the only solicitation issued as Request for Quotation (RFQ) Q1574121001A. A WRITTEN SOLICITATION WILL NOT BE ISSUED. FAR clauses and provisions enclosed within this RFQ are those in effect through Federal Acquisition Circular (FAC) 2005-53 and are available in full text through Internet access at http:// www.acquisition.gov/far/. This RFQ is 100% set-aside for small business concerns. All small business concerns may submit a quotation which shall be considered by the National Park Service (NPS). The North American Industry Classification System (NAICS) code is 321113 or 326199 and the small business size standard is 500 employees 2. REQUIREMENTYellowstone National Park is seeking to purchase Plastic Porch Decking to replace wooden decking on the "Historic" Administration Building in Mammoth Hot Springs. Plastic Porch Decking must meet the following design and construction specifications because this is a "Historic" Building the plastic wood decking must meet the following specifications: This is a name brand or equal requirement - Plastic Tongue & Groove Porch Decking and Stainless Steel Fasteners, shall be equal to, or better than the Plastic T&G decking (Brand name, AZEK "Porch" decking), as manufactured by AZEK Building Products 801 East Corey St Scranton, Pennsylvania 18505. General Make up of the Plastic Manufactured composition:A "green" sustainable Product, manufactured using recycled hardwoods and Poly vinyl Chloride (PVC) and Agrifiber filler. The walking surface shall be embossed with a simulated wood grain finish. Framing and Span requirements:Plastic porch decking shall be manufactured and designed so that when attached to the center of the supporting porch decking joists, (which are spaces every 16" (on Center) there shall be no sage in the plastic deck board. Finished dimensions and dimension of the Finished face width:All boards shall be rectangular in profile, 1" thick, with a exposure "finished face" dimension of 3-1/8th wide (+- 1/16th of an inch) because this must match the "Original Historic decking". The edges on each board shall be machined with a " tongue and groove pattern on opposite edges running the full length of each board. Length of each board: Each Board shall be 12 ft. long. Tongue and Grove construction:Each plastic decking board shall be molded with a tongue on one edge of the board and a groove on the opposite edge of the board. These plastic porch deck boards shall be designed so that the tongue on one board locks into the groove the adjacent deck board. Finished "Face" texture and appearance: The "face" of each board shall have a "wood grain" texture and the natural appearance. Color: The plastic decking shall be manufactured so that the color of each board is consistent throughout the entire board (same color on the face all the way through the board to the underside). The color of each board shall be a natural wood color or gray in color. (AZEK Porch color "Slate Gray" or equal) (Bright colored plastic shall not be acceptable such as, blues, reds, orange, yellows, etc.) The plastic decking shall be capable of being painted and bonding with a premium alkyd porch primer and be able to be painted with a high quality porch and floor paint.Bottoms of each porch deck board: The bottom of each board shall not have any grooves or ridges, the bottoms should appear flat. Nailing Pattern:This Plastic tongue and groove decking shall be manufactured and designed so that it is attached to the supporting porch joists, using stainless steel screw that is driven at an angle through the tongue of each board into the joists, just like conventional wood T&G Decking. Fasteners and tools:The manufacturer shall provide fasteners that are specifically designed (for this decking), to attach each Plastic T&G porch deck board to the supporting porch joists. Fasteners shall be manufactured to fasten the decking boards through the tongue of each board, (just like "original" wood decking is historically attached), so that when finished no (Screws are visible on the face of the porch decking boards. Fasteners are visible, only, in the face of the starter planks and the finished planks and at the mitered joints. Fasteners shall stainless steel so that they will not rot, rust, deteriorate or stain the decking. All screws shall be colored (Gray # 37), Square drive with "Trim Heads". Warranty:Manufacturer shall warranty the plastic decking for the life time of the product, when installed and maintained according to the Manufacturers installation and care instructions. DELIVERY IS REQUIRED NO LATER THAN 14 DAYS AFTER RECEIPT OF ORDER. If quoting an equal product vendor shall supply a sample. Samples shall be mailed to: Yellowstone National ParkMammoth Supply CenterBuilding 34Yellowstone National Park, WY 82190 Samples must be received by the closing date of the combined synopsis/solicitation. EVALUATION FACTORSBasis for Award: The basis for award will be technically acceptable/low price, which will be based on consideration of the following factors: 1) Technical Elements2) Past Performance 3) Price Price: The NPS shall analyze prices to verify they are fair and reasonable per the requirements of Federal Acquisition Regulations, Subpart 13.106-3. 3. CLAUSES AND PROVISIONSOfferors/Bidders/Quoters must review and comply with the FAR Provisions or Clauses which apply to this solicitation. This information is available on the Internet at http:// www.acquisition.gov/far/. The following clauses or provisions are specifically referenced and are required in the response to this solicitation: 52.212-1, INSTRUCTIONS TO OFFERORS-COMMERCIAL ITEMS; Commercial, applies to this acquisition 52.212-2, EVALUATION-COMMERCIAL ITEMS - 52.212-2, Evaluation factors include [a] technical elements Standard of Acceptability: the offeror must meet the specifications with an equal or better product; [b] past performance supported by documentation and references. Past performance shall be equal to price in importance; Past Performance: Past performance is a measure of the degree to which the contractor has satisfied its customers in the past. The NPS will evaluate offeror's past performance based on contacting references, for projects completed within the past 5 years, provided by the contractor; contractor must provide 3 references; the Government's knowledge of Offeror's past performance; and / or references obtained from any other source. The Government reserves the right to limit the number of references it ultimately contacts and to contact references or use sources other than those provided by the offeror to obtain information related to past performance. Other sources include, but are not limited to, the Past Performance Information Retrieval System; Federal, State or local governmental agencies; and private sector businesses. Standard of Acceptability: The offeror must receive at least a satisfactory past performance. [c] price. 52.212-2, EVALUATION-COMMERCIAL ITEMS - 52.212-3, OFFEROR REPRESENTATIONS AND CERTIFICATIONS-COMMERCIAL ITEMS, We request that you put the Reps and Certs information online at the ORCA website. The website is located: https://orca.bpn.gov/ or a completed copy of the provision at 52.212-3 must be submitted with the bid / offer; 52.212-4, CONTRACT TERMS AND CONDITIONS-COMMERCIAL ITEMS applies to this acquisition; 52.212-5, CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXEC ORDERS-COMERCIAL ITEMS, applies to this acquisition including 52.222-3 Convict Labor, 52.225-13 Restrictions on Certain Foreign Purchases, and 52.233-3 Protests after award; and, the following paragraph (b) clauses added: 52.222-19 Child Labor-Cooperation with Authorities and Remedies52.222-21 Prohibition of Segregated Facilities (Feb 1999), 52.222-26 Equal Opportunity (E.O. 11246), 52.222-35 Affirmative Action for Disabled Veterans and Veterans of the Vietnam Era; 52.222-36 Affirmative Action for Workers with Disabilities52.222-37 Employment Reports on Disabled Veterans and Veterans of the Vietnam Era; 52.225-1 Buy American Act-Supplies52.219-6 Notice of Total Small Business Set Aside52.219-8 Utilization of Small Business Concerns52.219-14 Limitations on Sub Contracting52.232-33 Payment by Electronic funds Transfer - Central Contractor Registration52.223-18 Contractor Policy Ban Text Messaging while Driving52.246-17 Responsibilities of Supplies52.252-2 Clauses Incorporated by Reference52.211-6 Brand Name or Equal 52.223-10 Waste Reduction Program - "Recycling" means the series of activities, including collection, separation, and processing, by which products or other materials are recovered from the solid waste stream for use in the form of raw materials in the manufacture of products other than fuel for producing heat or power by combustion. "Waste prevention" means any change in the design, manufacturing, purchase, or use of materials or products (including packaging) to reduce their amount or toxicity before they are discarded. Waste prevention also refers to the reuse of products or materials. "Waste reduction" means preventing or decreasing the amount of waste being generated through waste prevention, recycling, or purchasing recycled and environmentally preferable products. (b) Consistent with the requirements of Section 701 of Executive Order 13101, the Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by this contract. The Contractor's programs shall comply with applicable Federal, State, and local requirements, specifically including Section 6002 of the Resource Conservation and Recovery Act (42 U.S.C. 6962, et seq.) and implementing regulations (40 CFR part 247). 4. PROPOSALQUOTES ARE DUE for this combined synopsis/solicitation on November 28, 2011 at 4:30 PM Mountain Daylight. Emailed quotes are preferred with all required documentation; no oral quotations will be accepted. Quoters must furnish the company name, DUNS number, address, phone and fax number, email address if available, and official point of contact. All Quotes must be signed by authorized company official and emailed to contact@example.gov. All questions regarding this solicitation must be submitted in writing via email to contact@example.gov. PROPOSAL COVER SHEET MUST INCLUDE THE FOLLOWING: Line Item 0001: 1,000 Each 12 foot Plastic Tongue and Grooved Plastic Porch Decking and Fasteners $___________ Line Item 0002:12,000 Each Stainless Steel Fasteners Screws $___________TOTAL $___________ Business Name: ____________________________ DUNS:___________________ Business Address: ____________________________________________________ Business Phone: ____________________________FAX: _____________________ Email Address:______________________________ Offeror Name: _____________________________ Date:_____________________ PAST PERFOMANCE CONTACTS:Name:______________Company___________Phone______________Email:______________ Name:______________Company___________Phone______________Email:______________ Name:______________Company___________Phone______________Email:______________ END OF COMBINED SYNOPSIS/SOLICITATION.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 9 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS