Native and Engineered Fill Material Supply
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This subcontract, issued by the California Regional Water Quality Control Board Region 5 in Redding, involves the supply and delivery of native soil and engineered backfill materials. The materials are required for pipeline reburial and slope stabilization efforts at remote creek-side locations within Red Bluff. The project is categorized under NAICS code 484220 and was posted on August 19, 2025. The primary objective is to ensure the structural integrity of pipelines and the stability of surrounding slopes through the strategic application of specific fill materials in challenging terrain.
General Info
Agency
Place of Performance
Red Bluff, CASet-Aside
Documents
This scope was carved out of 5A52CR00250.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
A-518 L-177A MP 59.98 Geohazard Mitigation Project
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
