Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on September 14, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

STATE OF MAINE NAVAL ARCHITECTS

Awarded
DTMA2Q20110035Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
CYLINDER, HYDRAULIC ACC
Solicitation # SPE7M0-27-T-0456
Solicitation SPE7M0-27-T-0456 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain ESOC Buys for one hydraulic accumulator cylinder, NSN 2090-01-450-1199. The item is to be delivered to the Puget Sound Naval Shipyard IMF in Bremerton, Washington, with a required delivery lead time of five days after order. Inspection and acceptance will occur at the destination per FAR 52.246-2. Quotations must be submitted via the DIBBS system by October 30, 2026. The contract mandates strict adherence to technical and quality standards, including Item Unique Identification (IUID) per MIL-STD-130 and DFARS 252.211-7003, and packaging requirements per RP001 and MIL-STD-2073-1E. Technical data for this item is subject to ITAR or EAR export controls, requiring contractors to have approved JCP certification and specific DLA authorizations. Additionally, the hardware must not contain intentionally added mercury, and the government will not evaluate offers utilizing additive manufacturing unless specifically authorized. Compliance with the Buy American Act and the Berry Amendment is required for quotes above the micro-purchase threshold. Evaluation includes a price preference for certified HUBZone Small Business Concerns. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and payment, and adherence to DFARS 252.204-7012 for safeguarding covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

1 day ago

DEADLINE

in 4 days
NAICS: 336611
New
Federal
NONSKID FOR NAVAL SHIPS/VESSELS
Solicitation # N4002727R0004
Solicitation N4002727R0004 is a total small business set-aside for a single Indefinite Delivery, Indefinite Quantity (IDIQ) firm fixed price contract to provide nonskid deck covering removal and replacement for U.S. Navy ships and other government vessels. The work will be performed at Naval Station Mayport, Florida, and within 50 miles of the facility. The contract spans five ordering periods from March 15, 2027, through March 14, 2032. The scope includes surface preparation meeting SSPC-SP10/NACE 2, SSPC-SP 11, and SSPC-SP12 WJ-3/NACE 5 standards, with the application of MIL-PRF-24667 Type I, IV, V, or XI nonskid materials. Award will be based on a competitive trade-off source selection process evaluating best value, with a heavy emphasis on past performance involving U.S. Navy surface combatants and price fairness. The contractor must adhere to ASQ/ANSI/ISO 9001:2015 quality standards and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing. Key requirements include the submission of an Access Control Plan for non-U.S. citizen employees and compliance with CMMC cybersecurity levels and Buy American regulations. Liquidated damages are tailored at two percent per calendar day, capped at ten percent. Proposals are due by November 30, 2026, and must be submitted in three volumes covering price, past performance, and pre-award information.
Southeast Regional Maintenance Center

POSTED

1 day ago

DEADLINE

in 30 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 336611
New
Federal
NAVY NP FENDER RENEWAL
Solicitation # 70Z04027Q60514Y00
The U.S. Coast Guard Surface Forces Logistics Center is soliciting quotes for a Firm Fixed Price Purchase Order to perform a rubber fender system renewal on a 108-foot Yard Patrol Craft. The scope of work includes the removal of existing upper and lower fendering, securing bars, and hardware from the exterior hull and transom, followed by the installation of new rubber fenders and associated hardware. Specific requirements include replacing up to 60 linear feet of CRES securing flat bars and 75 linear feet of mounting plates and oak shims, as well as installing new studs, nuts, and washers. The government will provide 24 Type-D black EPDM fenders as government furnished material located at the Coast Guard Yard in Curtis Bay, Maryland, which also serves as the place of performance. This is a total small business set-aside conducted under FAR Part 13 Simplified Acquisition Procedures, with awards based on best value considering technical requirements, deadlines, and price. All work must be completed by December 11, 2026. Quotes must be submitted via email to Erica Gibbs by November 16, 2026, at 9:00 am Eastern. Payment will be processed via Net 30 terms through the IPP system, and no down or advanced payments will be provided. Vendors must be able to secure funding until delivery and may need to be registered in the Joint Certification Program to access export-controlled drawings.
CG-SEA-C23

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by NAVSUP FLC Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from November 12, 2026, to November 18, 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, cleaning and inspection of air conditioning and refrigeration plant condensers, rust and corrosion removal, replacement of lagging and insulation, furniture upholstery replacement, and the provision of rigging services and scaffolding. All work must adhere to NAVSEA Standard Items and SCF Part 1915 Occupational Safety and Health Standards for Shipyard Employment. Award will be granted to the lowest priced technically acceptable offeror, with technical capabilities rated as either acceptable or unacceptable. Prospective contractors must submit a completed J-1 Price Breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Required submission documentation includes Standard Form 18, completed Standard Form 30 amendments, and technical qualifications verified via the Attachment J-3 checklist. The deadline for proposal submission is November 2, 2026, at 13:00 CET. Post-award invoicing must be processed electronically through Wide Area WorkFlow.
Navsup Flc Sigonella Naples Office

POSTED

1 day ago

DEADLINE

in 1 day
NAICS: 336611
New
Federal
Full & Open Brand Name OEM "Curtiss-Wright Electro-Mechanical Corp" - Low Pressure Air Compressor (LPAC) Maintenance Services
Solicitation # N0040627Q0004
Fleet Logistics Center Puget Sound is soliciting a firm-fixed-price, full and open brand name requirement for Low Pressure Air Compressor (LPAC) maintenance services in support of SRF-JRMC Sasebo, Japan. The scope of work involves providing all labor and genuine OEM parts from Curtiss-Wright Electro-Mechanical Corp to replace the Air End Assembly (Part Number ML12535266G1) for a Dresser-Rand Company Model GSS-200 rotary compressor on the USS SAN DIEGO (LPD-22). Key tasks include disassembly, cleaning, inspection, drive coupling alignment, and an operational test, with all work adhering to Job Specification 38DXA55115-A01 and MIL-STD-162B cleaning standards. Performance is expected to be completed by November 23, 2026. The government will select the most advantageous offer based on technical capability, including the delivery date, past performance, and price, with a 10 percent price evaluation preference for HUBZone small business concerns. Because this is a brand name requirement, offerors must provide OEM documentation establishing the authenticity of parts and services, including traceability and warranties, to be deemed compliant. Invoicing must be processed through Wide Area WorkFlow (WAWF), and all packaging and marking must comply with ASTM-D-3951 and MIL-STD-130. The procurement is categorized under NAICS code 336611 and includes standard FAR and DFARS clauses regarding safety, security, and commercial services.
Navsup Flt Logistics Ctr Puget Sound

POSTED

1 day ago

DEADLINE

in 3 days

AI Contract Overview

Show more

The U.S. Department of Transportation Maritime Administration Atlantic Division Acquisition Office issued solicitation DTMA2Q20110035 to procure professional naval architect services for projects aboard the T.S. State of Maine. The scope of work includes providing detailed arrangement and installation drawings for sewage holding tanks and shore power modifications, as well as conducting a replacement study and creating drawings for the ship's service diesel generators. Technical requirements for the generator systems specify compliance with EPA Tier 3 and IMO Tier III emissions standards and the use of marine distillate diesel fuel. The procurement process included a site visit at the Maine Maritime Academy in Castine, Maine, and was modified through two amendments. Amendment 0001 extended the quote deadline to August 8, 2011, and clarified drawing deliverables and ITAR compliance. Amendment 0002 further extended the response deadline to August 9, 2011, and removed item 0004 from the statement of work. The contract established a delivery date of February 1, 2012, for the required deliverables and drawings.

General Info

Contract Value

$140,733.1

NAICS

336611 - Ship Building and Repairing

Place of Performance

VA, USA

Set-Aside

NONE

Award Issued Date

Documents

4
DOCX, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6933A2 DOT Maritime Administration
Contacts1 person available
OfficeNORFOLK, VA, 23505, USA
Office AddressNORFOLK, VA, 23505, USA
Contacts
Laurel BishopCONTRACTING OFFICER

Full Description

Show more
The following is the SOW: INTENT: It is the intent of this Statement of Work (SOW) to provide stamped approved ABS and USCG detailed drawings and specifications for the following projects aboard the Training Ship, State of Maine as follows: 1. Sewage Holding Tanks: Convert one or more salt water ballast tanks into sewage and grey water holding tanks. 2. Shore Power Modification: Modify the two existing shore power feeders (which currently run along the port side of the aft house) such that they penetrate the aft house adjacent to the fire control room (instead of their current penetration at the aft end of the aft house). 3. Ship's Service Diesel Generator Replacement Concept Study: Provide engineering and concept drawings which provide two separate options for replacing the three existing 900 Kw, MAK 6 M 332 ship's service diesel generators with Tier III compliant generators. 4. Ship's Service Diesel Generator Replacement Detailed Drawings (Optional) : Based on the results of the preliminary engineering and concept drawings identified in #3 above, the government may elect to proceed with requiring the Naval Architect to provide all engineering, detailed drawings and specifications for one of the options. 5. Drawing Copies: Provide electronic copies of all drawings aboard the ship. PERFORMANCE PERIOD: This SOW can begin immediately after award. All deliverables for this statement of work are due by February 1, 2012. NOTES: Wherever the words "detailed drawings" appear in this SOW, it is to be understood to mean all pertinent engineering calculations, detailed structural drawings, arrangement drawings, rip out drawings, piping drawings, HVAC drawings, electrical system drawings and all other drawings and details required to accurately identify, to a ship yard, the full scope of work and materials required. For example, structural drawings shall include detailed foundations, fabrication details, locating dimensions, installation details (to weld to existing ship structure), welding symbols, and a complete material list with material descriptions, quantities and material specifications as well as sources for the material. Electrical drawings shall include installation details, one line diagrams, equipment wiring details, cable sizes, cable types, watertight penetration details, and a complete material list. Piping and HVAC drawings shall include all penetration details, material descriptions, quantities and material specifications as well as sources for the material. All drawings shall include additional views, sections, elevations and details, as necessary, as required for clarification. WORK DESCRIPTION: ITEM 0001- Sewage Holding Tanks: It is the purpose of this ITEM for a Naval Architect to provide USCG and ABS stamped approved, detailed drawings and specifications to be used by a ship yard to convert one or more existing salt water ballast tanks into sewage and grey water holding tanks. These tanks (or tank) shall hold not less than 500 tons of waste water (an estimated amount of wastewater for 380 persons over a 5 to 6 day period) . It is the Government's desire to convert salt water ballast tanks 3-174-1 and 3-174-2 into holding tanks which have a total capacity of 719 tons. Prior to developing the detailed drawings and specifications, the Naval Architect shall perform an engineering concept study to determine if tanks 3-174-1 and 3-174-2 can be used or if a different set of tanks (or tank) should be used. Based on the results of the concept study, a decision shall be made by the Contracting Officer's Technical Representative (COTR) as to which tanks (or tank) to use. The detailed drawings and specifications shall address, at a minimum, the following requirements: 1. Piping to transfer sewage, from the forward and aft MSD systems and forward grey water system, into the new holding tanks. 2. Pumps and piping necessary to permit pumping of the new holding tanks both ashore and overboard. 3. Salt water wash down and internal tank aeration of the new holding tanks. 4. Overboard discharge of the forward MSD effluent pump at both the port and starboard side. 5. Holding tank coating renewal using a coating compatible for sewage. In addition to the detailed drawings and specifications required, the Naval Architect shall update and submit for approval the ship's Trim and Stability Booklet, Cargo Max Software and any other drawing or document required to be developed, modified and/or approved by the regulatory agencies as a result of these re-designs such as Fire Plans, Structural Fire Plans, Egress Plans, etc. If requested, the contractor shall be required to resubmit revised drawings and specifications to satisfy all regulatory questions and comments. ABS engineering and drawing review costs shall be invoiced to the Government. All other costs shall be borne by the Naval Architect. ITEM 0002- Shore Power Modification: It is the purpose of this ITEM for a Naval Architect to provide USCG and ABS stamped approved, detailed drawings and specifications to be used by a ship yard to modify the two existing shore power feeders such that they run from a new connection box adjacent to the fire control room and down to two the shore power breakers located on the main switch board. In addition to the detailed drawings and specifications required, the Naval Architect shall update and submit for approval any other drawing or document required to be developed, modified and/or approved by the regulatory agencies as a result of these re-designs such as Fire Plans, Structural Fire Plans, Egress Plans, etc. If requested, the contractor shall be required to resubmit revised drawings and specifications to satisfy all regulatory questions and comments. ABS engineering and drawing review costs shall be invoiced to the Government. All other costs shall be borne by the Naval Architect. ITEM 0003 - Ship's Service Diesel Generators Replacement - Concept Study and Concept Drawings: It is the purpose of this ITEM for a Naval Architect to provide a concept study and concept drawings for two separate options to replace the three existing 900 Kw, MAK 6 M 332 ship's service diesel generators. The first option involves replacing all three of the 6 M 332 diesel generators with three MAK 6 M 20 C, (1020 Kw each), diesel generators (or equal). The second option involves replacing two of the MAK 6 M 332 diesel generators with two MAK 8 M 20 C, (1360 Kw each) diesel generators (or equal) in addition to replacing one MAK 6 M 332 with one MAK 6 M 20 C diesel enerator. The preliminary engineering and concept drawings shall define the requirements (in terms of both cost and modifications required) to accomplish both options with regard to the following: 1. Structural foundations. 2. Surrounding structures and the room necessary to perform engine overhauls. 3. Interference removal to accomplish removal of existing and installation of new diesel generators. 4. Fuel system sizing (and their supporting electrical systems). 5. Exhaust system sizing. 6. Jacket water cooling system sizing (and their supporting electrical systems). 7. Lube oil cooling system sizing (and their supporting electrical systems). 8. Generator wiring and control systems. 9. Switchboard sizing and generator circuit breaker sizing. 10. Switchboard meters and monitoring devices to include interfacing with the existing TMS engine automation system. 11. Stability and trim. ITEM 0004 - Ship's Service Diesel Generators Replacement - Detailed (Optional) : Based on the results of the concept study and concept drawings identified in ITEM 0003 above, the government may elect to exercise this Optional ITEM. If exercised, the Naval Architect shall provide USCG and ABS stamped approved, detailed drawings, and specifications (to include material lists), necessary for a ship yard to replace the three existing 900 Kw, MAK 6 M 332 ship's service diesel generators in the manner decided on. In addition to the detailed drawings and specifications required, the Naval Architect shall update and submit for approval any other drawing or document required to be developed, modified and/or approved by the regulatory agencies as a result of these re-designs such as Fire Plans, Structural Fire Plans, Egress Plans, etc. If requested, the contractor shall be required to resubmit revised drawings and specifications to satisfy all regulatory questions and comments. ABS engineering and drawing review costs shall be invoiced to the Government. All other costs shall be borne by the Naval Architect. ITEM 0005-Provide Example Electronic Copies of both Hard Copy and Microfiche Drawings: The ship contains both hardcopy paper and microfiche drawings. It is the purpose of this item for the Naval Architect to provide electronic, pdf copies, of 5 separate drawings (chosen by the COTR) from both the hard copy paper and microfiche in order to compare the quality between the two copying methods and to make determination as to whether or not to exercise ITEM 0006 or 0007 below. ITEM 0006-Drawing Copies Produced From Hard Copy Drawings (Optional): Provide electronic, scanned copies of all existing hard copy drawings aboard the ship to include all new drawings resulting from this statement of work. There are approximately 2,000 (two thousand) separate drawings; many with multiple pages. The existing hard copy drawings shall be inventoried by both the Naval Architect and a person appointed by the ship's Chief Engineer prior to their removal for copying. A copy of the inventory shall be signed by both parties. The drawings to be copied are listed in the attached pdf file. All drawings shall be scanned into pdf files which shall include a searchable pdf index listing each file by both drawing title and number. A total of 4 complete sets of CDs shall be produced and delivered to the COTR. ITEM 0007-Drawing Copies Produced From Microfiche Drawings (Optional): Provide electronic, copies of all existing microfiche drawings aboard the ship to include electronic copies of all new drawings resulting from this statement of work. There are approximately 2,000 (two thousand) separate drawings; many with multiple pages. The existing microfiche drawings shall be inventoried by both the Naval Architect and a person appointed by the ship's Chief Engineer prior to their removal for copying. A copy of the inventory shall be signed by both parti s. The drawings to be copied are listed in the attached pdf file. All microfiche drawings shall be scanned into pdf files which shall include a searchable pdf index listing each file by both drawing title and number. A total of 4 complete sets of CDs shall be produced and delivered to the COTR. REFERENCES: 1. Technical manuals and ship's drawings for as built and existing installations. 2. ABS Rules and Regulations, as applicable 3. US Coast Guard regulations, CFRs and NAVICs, as applicable 4. IEEE standards, as applicable 5. NFPA standards, as applicable 6. IMO rules and regulations, as applicable GOVERNMENT PROVIDED MATERIALS: All of the ship's drawings and manuals shall be made available for referencing aboard ship. Removal of drawings and/or manuals for copying purposes may only be performed after receiving written approval from the ship's Chief Engineer.

More opportunities from Department Of Transportation → 6933A2 DOT Maritime Administration

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS