This Solicitation opportunity from Department Of Transportation was posted on December 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ND FLAP SDN 7NE(1) Hoffer Lake Access
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves reconstructing and upgrading approximately 1.06 miles of 7th Street NE through Hoffer Lake Park in McClusky, North Dakota, to improve recreational access and visitor experience. The work includes widening, paving, grading adjustments to minimize wetland impacts, and traffic control measures, with key items such as roadway excavation, aggregate base, asphalt pavement, pavement markings, and temporary traffic control. The project emphasizes compliance with federal standards, notably the FP-24 specifications, and incorporates a comprehensive set of FAR clauses covering responsibility, safety, environmental protections, and quality assurance. The work is scheduled to commence within 10 days of the notice to proceed, with completion expected within a timeframe aligned with the assumed start date of late December 2025, and includes provisions for progress schedule updates and environmental permits. The procurement is a sealed bid, lowest-price technically acceptable (LPTA) process, set aside exclusively for small businesses under NAICS 237310, with an estimated project value between two and five million dollars. Bidders must submit a single, signed, original bid package by November 12, 2025, to the designated federal highway division office in Lakewood, Colorado, with no electronic bid submissions permitted. The bid package must include all required forms, bid bonds, certifications, and acknowledgment of amendments, with original signatures and seals. The contract incorporates numerous specific clauses on security, personnel qualifications, environmental compliance, and quality control, with the government reserving the right to inspect materials at source or on-site, and to verify contractor quality assurance through approved plans and testing procedures. Overall, the contract emphasizes strict adherence to federal standards, responsible small business participation, and comprehensive documentation and reporting throughout performance.
General Info
Contract Value
$2,000,043Place of Performance
McClusky, ND, 58463, USASet-Aside
Award Issued Date
Potential End Date
October 16, 2026Documents
11AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
PROJECT DESCRIPTION:
The purpose and need for the project are to improve the recreational opportunities and enhance the experience for those visiting Hoffer Lake Park. The County Park Board has made improvements to the park over the years which has increased the visitation and usage of the facilities. The project aims to improve access and enhance experience by paving and widening 1.06 miles of 7th Street NE from 5th Avenue NE (CMC 4211) to the main park entrance and through the park terminating at the west end of the park at the unmarked road intersection (assumed 4th Avenue).
SCOPE OF THE WORK:
The scope of this project is to widen, and pave 7th Street NE from 5th Avenue NE (CMC 4211) through Hoffer Lake Park. Project will be advertised as Schedule A: From 5th Avenue NE 1.06 mile west through Hoffer Lake Park ending at the north part of the curve where future camping area expansion is planned. Scope includes the following:
- Reduce the design speed limit from 5th Avenue NE to 25 MPH zone at the park to allow for 0-foot clear zone.
- Pavement section width to 24-feet (11-foot lanes and 1-foot shoulders). This is consistent with other roads in the area and driver expectations.
- With the narrower width adjust grading to fit primarily on the existing road bench to minimize material import and wetland impacts.
- Remove reconditioning due to the project being 4R with earthwork.
PRINCIPAL WORK ITEMS:
- 20401-0000 Roadway Excavation: 6,000 CUYD
- 20441-0000 Waste: 3,952 CUYD
- 30101-0000 Aggregate Base: 6,000 TON
- 40301-0100 Asphalt Concrete Pavement, Type 1: 3,500 TON
- 63402-0300 Pavement Markings, Type B, Solid: 8.00 MILE
- 63501-0000 Temporary Traffic Control: LPSM
More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS