Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from National Aeronautics And Space Administration was posted on May 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Near Earth Orbit Network Program's Sounder for Microwave-Based Applications

Closed
80GSFC26R0028Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The National Aeronautics and Space Administration’s Goddard Space Flight Center is soliciting proposals under solicitation number 80GSFC26R0028 for the Sounder for Microwave-Based Applications, a mission-critical payload for near-Earth orbit operations. The contract is structured as a hybrid vehicle combining cost-reimbursement for development (CLIN 0001), firm-fixed-price for production of two flight models (CLIN 0002), and a time-and-materials indefinite-delivery/indefinite-quantity (IDIQ) component (CLIN 0003) with a ceiling of $52,800,000 for post-launch support and special studies. Work spans the full life cycle from design and fabrication to integration, testing, and on-orbit commissioning, with delivery points at the spacecraft contractor facility and NASA Goddard Space Flight Center in Greenbelt, Maryland. The Statement of Work, detailed in Attachment A, mandates strict adherence to NASA technical standards including NASA-STD-6016, GSFC-STD-6001, and IPC J-STD-001 Class 3, with comprehensive quality, contamination control, and materials traceability requirements governed by MIUL and part-level identifiers. Packaging, preservation, and marking protocols align with spaceflight hardware standards, though specific MIL-STDs are not explicitly cited beyond EMI controls. Evaluation will be conducted using a trade-off process prioritizing mission suitability over cost, with the technical approach earning 500 points, management approach 400 points, and small business utilization 100 points within the mission suitability category; past performance will be assessed for relevance and risk, and cost realism will be evaluated qualitatively. Proposals must be submitted in four volumes via NASA’s EFSS Box platform by June 1, 2026, with strict formatting rules including page limits, PDF specifications, and Excel file transparency. Amendments to the RFP have added Supply Chain Visibility Reporting, revised milestone payment percentages, incorporated responses to questions 1–14, aligned clauses with the Federal Acquisition Regulation Overhaul, and introduced Clause 52.222-90 addressing DEI discrimination. Special contract requirements include PIV card management, strict ITAR/EAR export compliance, mandatory notification of funding thresholds at 75%, and performance of contractor-proposed enhancements in Attachment L. Payment is managed by the NASA Shared Services Center, requiring electronic submission

General Info

NASA solicits proposals by June 1, 2026, for microwave sounder technology under updated RFP with compliance requirements.

Agency

National Aeronautics And Space Administration → NASA Goddard Space Flight CenterView Agency

NAICS

334511 - Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument ManufacturingView NAICS

Place of Performance

MD, USA

Set-Aside

NONE

Documents

(41)

NASA PPBE 2025 IT Portfolio Data Collection Template

XLSXtemplate

Amendment 1 - DRD 6 - SCV Reporting for Solicitation 80GSFC26R0028

PDFamendment

Attachment I - Government Furnished Property List

PDFgovernment-furnished-property

RFP 80GSFC26R0028 Financial Management Reporting Requirements Attachment B

PDFsow

RFP 80GSFC26R0028 SMBA Questions and Answers

PDFq-and-a

DRD 3 - IT Capital Planning and Investment Control (CPIC) Reporting

PDFdrd

RFP 80GSFC26R0028 SMBA Question and Answer 12

PDFq-and-a

RFP 80GSFC26R0028 Attachment O Milestone Payment Schedule

PDFsow

RFP 80GSFC26R0028 SMBA Flight Models and Task Support

PDFrfp

CITAR Report Template

XLSXother

Enclosure 2 - Cost Exhibits 1-8

XLSXother

Amendment 1 Attachment C Non-Technical Contract Data Requirements List

PDFamendment

RFP 80GSFC26R0028 Safety and Health Plan Attachment F

PDFsafety-and-health-plan

Attachment H - Requirements Statements List NASA GSFC Feb 27 2026

PDFrequirements-statements

RFP 80GSFC26R0028 Cyber Supply Chain Risk Management Plan

PDFsow

DRD 5 - Commercial Artificial Intelligence Risk and Impact Assessment (CAIRIA)

PDFdrd

RFP 80GSFC26R0028 Small Business Subcontracting Plan

PDFsmall-business-subcontracting-plan

NASA Cyber Supply Chain Risk Management (C-SCRM) Plan Questionnaire

XLSXquestionnaire

RFP 80GSFC26R0028 Near Earth Orbit Network Sounder CWBS

PDFcwbs

Amnt 2 Enclosure 2 Cost Exhibits 1-8

XLSXother

DRD 2 - Security Requirements for Unclassified IT Resources

PDFdrd

Past Performance Questionnaire for NASA Contract Evaluation

PDFpast-performance

NS1-SMBA-REQ-0001E Near Earth Orbit Network Series-1 SMBA Performance Requirements Document

PDFperformance-requirements-document

Attachment O - Milestone Payment Schedule for RFP 80GSFC26R0028

PDFcontract-document

NS1-SMBA-SOW-0002D Near Earth Orbit Network Series-1 Project Statement of Work

PDFsow

Amendment 0002 to RFP 80GSFC26R0028 SMBA

PDFamendment

Amendment 0001 to RFP 80GSFC26R0028 SMBA

PDFamendment

RFP 80GSFC26R0028 SMBA Question and Answer 10

PDFq-and-a

RFP 80GSFC26R0028 SMBA Question and Answer 11

PDFq-and-a

RFP 80GSFC26R0028 Financial Capability Disclosure

PDFfinancial-capability-disclosure

NS1-SMBA-CDRL-0001C Near Earth Orbit Network Series-1 Project CDRL

PDFcdrl

RFP 80GSFC26R0028 Applicable Documents List

PDFapplicable-documents-list

Amendment 0003 to RFP 80GSFC26R0028 SMBA

PDFamendment

RFP 80GSFC26R0028 Sounder for Microwave-Based Applications

PDFrfp

DRD 4 - Commercial IT Authorization Report for Solicitation 80GSFC26R0028

PDFdrd

Attachment K - TM Rate Matrices for RFP 80GSFC26R0028

PDFrate-matrix

RFP 80GSFC26R0028 Organizational Conflicts of Interest Plan

PDFother

Solicitation 80GSFC26R0028 Organizational Conflicts of Interest (OCI) Plan

PDFoci-plan

RFP 80GSFC26R0028 SMBA Questions and Answers 13-14

PDFq-and-a

Attachment C - Non-Technical Contract Data Requirements List

PDFsow

Attachment L - Contractor Proposed Enhancements for RFP 80GSFC26R0028

PDFcontractor-proposed-enhancements

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNational Aeronautics And Space Administration → NASA Goddard Space Flight Center
Contacts2 people available
OfficeGREENBELT, MD, 20771, USA
Organization / Agency
National Aeronautics And Space Administration → NASA Goddard Space Flight Center
View Agency Profile
Office AddressGREENBELT, MD, 20771, USA

Full Description

Show more

The National Aeronautics and Space Administration's Goddard Space Flight Center is pleased to release the Request for Proposal (RFP) for the Sounder for Microwave-Based Applications acquisition. This RFP replaces Draft RFP 80GSFC25R7005 issued on April 18, 2025 (including all amendments), in its entirety.


All attachments to this posting together constitute the complete RFP, including all instructions, restrictions, provisions, and contract clauses. 


Amendment 1: The purpose of this amendment is to 1: Add Supply Chain Visibility Reporting; and 2. Correct the percentages in Attachment O - Milestone Payment Schedule. This amendment supersedes all affected areas in the RFP and previous amendments (if any). All other terms and conditions remain unchanged.


Amendment 2: The purpose of this amendment is to implement updates associated with Request for Proposal (RFP) Questions and Answers 1–9. Additionally, the Government has included RFP Questions and Answers 1–9.


Post: Post Question and Answer 10.


Post: Post Question and Answer 11.


Amendment 3: The purpose of this amendment is to 1. Add clause 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS; and 2. Update clauses to align with the Revolutionary Federal Acquisition Regulation Overhaul and other corrections. Additionally, the Government has included RFP Question and Answer 12.


Post: Post Questions and Answers 13 and 14.

More opportunities from National Aeronautics And Space Administration → NASA Goddard Space Flight Center

Same awarding agency

NAICS: 336414
Federal
Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) Flight
Solicitation # NASA-GSFC-LISA-FRS-FLIGHT
NASA Goddard Space Flight Center is seeking the design, fabrication, qualification, and delivery of flight Frequency Reference System (FRS) hardware for the Laser Interferometer Space Antenna (LISA) mission. The requirement consists of three flight models and one flight spare, each comprising an optical reference cavity (FRS-O) and frequency-locking electronics (FRS-E). These subsystems utilize the Pound-Drever-Hall technique to achieve the picometer-scale measurement stability required for the mission. Due to the aggressive delivery schedule and the need for specific flight heritage and supplier relationships, NASA intends to issue a sole source contract to BAE Systems Space and Mission Systems Inc. The project follows a strict delivery timeline with flight units scheduled for delivery between February 9, 2029, and March 11, 2030, with the flight spare due by May 31, 2030. The contractor is responsible for the full lifecycle of the hardware, including integration, testing, and minimal post-delivery support. Key technical requirements include adherence to ISO 7 cleanliness standards for the FRS-O, compliance with the LISA Contamination Control Plan, and the execution of Comprehensive Performance Tests and TVAC environmental testing. The contract structure includes cost-reimbursement for non-recurring engineering, firm-fixed-price for production, and time-and-materials for special study task orders.
Guided Missile and Space Vehicle Manufacturing

POSTED

8 days ago

DEADLINE

in 7 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS