Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from California was posted on June 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Network Switch Installation – Cisco Infrastructure

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to perform structural repairs and planned maintenance for the Blackpool Tower. The project is divided into three primary phases: the Winter Works 2026/27 package occurring during operational closure from November 2026 to March 2027, the Summer Works 2027 package during the operating season from April 2027 to November 2027, and subsequent ad-hoc maintenance based on annual inspections beyond November 2027. The estimated total value of the contract is 4,000,000 GBP including VAT, with a potential option to extend for one year into 2028. The contract is an open competition particularly suitable for small and medium-sized enterprises, with an award based on a 10% weighting for social value. Mandatory requirements for bidders include professional indemnity insurance of 5 million GBP and employer's and public liability insurance of 10 million GBP each. Technical qualifications are strictly enforced, requiring IRATA level 3 supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or the Institution of Structural Engineers. All work must comply with BS EN 1090 Execution Class 3, the Construction Design and Management Regulations 2015, and UK GDPR. Tenders must be submitted electronically by November 13, 2026.
Blackpool Borough Council

POSTED

about 1 hour ago

DEADLINE

in 23 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento is soliciting bids under solicitation 26-091-ITB for the Corpyard Phase II project, which involves the structural anchoring and welding of fourteen existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, anchor installation, drilling and cleaning of holes using Bolthold, welded angle connections, and rust protection, all performed according to PSE stamped drawings and structural calculations. The project requires a final inspection by the City's Building department and special inspections during installation. The anticipated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals through the City's e-Procurement Portal by November 10, 2026, including a bid security of at least 10 percent of the total bid price. Requirements for the contractor include registration with the California State Department of Industrial Relations, compliance with prevailing wage rates, and adherence to various federal and state labor laws, including the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Executive Order 11246. Additionally, contractors must provide a Workers' Compensation certification and comply with ISO standards for shipping container certification. The project is managed by Project Manager II Mubusi Muhapi and overseen by the Director of Capital Projects, Jaipal Chahal.
Capital Projects - Construction

POSTED

about 5 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The West Basin Municipal Water District in California is seeking a subcontractor for the Network Switch Installation – Cisco Infrastructure project. The scope of work involves the installation of Cisco network switches across five separate facilities, which includes DIN rail mounting, cabling, and full integration with existing access control systems. Interested parties must submit their responses by July 3, 2025. This procurement falls under NAICS code 238120 and was officially posted on June 16, 2025.

Documents

This scope was carved out of RFP-SM-0101.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Industrial Network Hardware Replacement and Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → West Basin Municipal Water District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install Cisco network switches at five facilities, including DIN rail mounting, cabling, and integration with existing access control systems.

More opportunities from California → West Basin Municipal Water District

Same awarding agency

NAICS: 541512
SLED
Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements
Solicitation # RFP-DS-0149
West Basin Municipal Water District is soliciting proposals under RFP-DS-0149 for a System Integrator to replace three obsolete process-level Programmable Logic Controllers (PLCs) and associated SCADA equipment at the Torrance Refinery Water Recycling Plant. The project aims to mitigate the risk of unplanned facility shutdowns by transitioning to M580 PLCs and includes software development, network and panel design, programming, and the recommissioning of the RO and Biofor systems. The scope requires strict adherence to District IC&E and PCS standards, including specific tag naming, PLC style guides, and cybersecurity policies. All hardware must meet precise labeling and marking requirements, such as UV stabilized Gravol for interior nameplates and Type 316 stainless steel for exterior components. The selection process is based on a 100-point scale evaluating proposal quality, respondent qualifications, technical approach, and price, with bonus points available for Small, Local, or Veteran Owned Business Enterprises. Key performance requirements include unwitnessed factory testing with reports submitted 30 days prior to commissioning and a final performance test requiring seven consecutive days of normal operation with a hardware and software availability rate of at least 99.7 percent. Proposals were due by November 5, 2026, following a mandatory pre-proposal conference and job walk held on October 7, 2026. The resulting contract will be governed by a Professional Services Agreement, requiring compliance with California prevailing wage laws and specific commercial general liability insurance minimums.
Computer Systems Design Services

POSTED

13 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS