Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on August 24, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NezPerce Clearwater NF, Lochsa RD, Smith Creek Culvert Replacement

Closed
1240LU21Q0017Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to perform road and parking lot repairs at the Joliet Job Corps Center in Illinois. This fixed-price, single lump sum contract has an estimated value between $100,000 and $250,000. The scope of work includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, and kitchen/BCT areas. Additionally, the contractor must repair five storm sewer drain structures and five potholes, ensuring all work meets industry standards and proper drainage grades. The project must be completed within 90 consecutive business days following a written Notice to Proceed. Bids will be evaluated based on overall best value, and submission requires a signed MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and proof of a mandatory physical site visit. For bids equal to or exceeding $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Compliance with Construction Wage Rate Requirements (CWRR) is mandatory, requiring weekly certified payroll and adherence to prevailing wage determinations. Final payment is contingent upon a successful final inspection and the submission of operation and maintenance manuals.
Joliet Job Corps

POSTED

about 10 hours ago

DEADLINE

in about 18 hours
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
FY 2027 Asphalt Resurfacing Program
Solicitation # BCFY27-17
The Boone County Fiscal Court is soliciting bids for the FY 2027 Asphalt Resurfacing Program, solicitation number BCFY27-17, to perform milling and paving services on identified county roads and streets. The scope of work includes improving profiles and cross sections using Class 2 Asphalt Surface 0.38D PG64-22, which involves milling existing pavement at a minimum width of six feet from the gutter line, road preparation, and the installation of trackless tack coat. The contractor is also responsible for adjusting manholes, drainage structures, and valve boxes, as well as providing pavement markings and temporary traffic control in accordance with KYTC and MUTCD standards. The project is scheduled for a purchase order issuance on December 1, 2026, with a final completion deadline of June 1, 2027. Eligibility is limited to contractors prequalified by the Kentucky Transportation Cabinet. Bidders must submit an electronic bid bond equal to 5% of the bid, and the successful awardee must provide a surety bond for 100% of the contract amount from a Kentucky-licensed surety. The contract will be awarded to the lowest responsive and responsible bidder, with considerations for Kentucky resident and qualified bidder preferences. Required submittals include a W-9 form, a certificate of insurance, and a Critical Path Method schedule. Performance is subject to strict quality inspections regarding mix design, compaction, and ride quality, with a penalty of 2,500 dollars per day for failure to complete the work by the final deadline.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Main Street Concrete Curbing, Sidewalk, and Driveways.
Solicitation # 27-02
The City of Bartow, Florida, has issued solicitation 27-02 for the Main Street Concrete Curbing, Sidewalk, and Driveways project. This initiative focuses on improving roadway conditions, pedestrian accessibility, and compliance with current standards along Main Street, extending from Highway 60 west to the railroad crossing east of Highway 17. The scope of work includes full roadway repaving and the installation or replacement of concrete curbing, sidewalks, and driveways. All work must adhere to the 2026 FDOT Standard Specifications for Road and Bridge Construction, specifically FDOT Curb and Gutter 300 and Sidewalk 310, as well as MUTCD requirements for traffic management. The successful bidder must provide all labor, materials, equipment, and supervision, including the development of a City-approved Maintenance of Traffic plan and the restoration of all disturbed areas. The contract will be awarded to the lowest responsive and responsible bidder, with preferences afforded to Veteran Business Enterprises and Women/Minority Business Enterprises. Bidders must have been in business under the same name and tax identification number for at least three years. Required submittals include a variety of affidavits and certifications, such as non-collusion, drug-free workplace, and trench safety compliance. Financial security requirements include a bid bond for the submission and performance and payment bonds for contracts exceeding 250,000 dollars. Insurance carriers must maintain an AM Best Rating of A-VII or better. Compensation is based on unit prices applied to actual field measurements, and combined overhead and profit for change orders are capped at 10 percent. Responses are due by November 25, 2026, via the OpenGov portal or in-person delivery to the City of Bartow.
Public Works

POSTED

about 11 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Lolo, MT, 59847, USA

Set-Aside

SBA

Documents

5

SF18_1240LU21Q0017.pdf

PDF

SmithCr_Drawings.pdf

PDF

Smith+Creek+FSSS_rev1.docx

DOCX

SmithCreek_RFQ_21Q0017.docx

DOCX

Wage+Decision+ID20210080.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Nez Perce-Clearwater Nfs
Contacts2 people available
OfficeGRANGEVILLE, ID, 83530, USA
Office AddressGRANGEVILLE, ID, 83530, USA

Full Description

Show more
Nez Perce Clearwater NF, Lochsa Ranger District, Smith Creek Culvert Replacement, FS Road 101 at Milepost 2.00, Work consists of the removal of an existing 36 inch culvert and replacing with a new 48 inch by 90 ft long CMP. Project consist of, but not limited to clearing the roadway to the project site for contractor access, structure excavation, excavation and reshaping of the channel in the vicinity of the culvert, installation of 48 inch CMP placement of riprap, installation of embankment material, structure backfill, embankment and excavation of the roadway approaches, channel reconstruction. The project is located approx 14 miles east of Kooskia, Idaho in Idaho County. From Kooskia, ID travel east on U.S. Hwy 12 approx 14 miles and turn North onto FSR 101. Travel approximately 2.00 miles to Project Site. Period of Performance estimated July October 2, 2021. Estimated price range between $100,000 - $250,000Nez Perce Clearwater NF, Lochsa Ranger District, Smith Creek Culvert Replacement, FS Road 101 at Milepost 2.00, Work consists of the removal of an existing 36 inch culvert and replacing with a new 48 inch by 90 ft long CMP. Project consist of, but not limited to clearing the roadway to the project site for contractor access, structure excavation, excavation and reshaping of the channel in the vicinity of the culvert, installation of 48 inch CMP placement of riprap, installation of embankment material, structure backfill, embankment and excavation of the roadway approaches, channel reconstruction. The project is located approx 14 miles east of Kooskia, Idaho in Idaho County. From Kooskia, ID travel east on U.S. Hwy 12 approx 14 miles and turn North onto FSR 101. Travel approximately 2.00 miles to Project Site. Period of Performance estimated July October 2, 2021. Estimated price range between $100,000 - $250,000.

More opportunities from Department Of Agriculture → Nez Perce-Clearwater Nfs

Same awarding agency

NAICS: 238160
New
Federal
Fenn Ranger Station roofing replacement
Solicitation # 1240LU26Q0130
Solicitation 1240LU26Q0130 is a firm fixed price contract for the Nez Perce-Clearwater National Forest to replace the cedar shake roofs on the Bunkhouse and Cookhouse at the Fenn Ranger Station in Kooskia, Idaho. This total small business set-aside under NAICS 238160 requires the contractor to provide all labor and materials, including 16-inch No. 1 Red Cedar premium grade shingles, underlayment, and weatherproofing. The project emphasizes maintaining the historical integrity of the structures and requires all roofing materials to be sourced from a single manufacturer for consistency. Old materials must be disposed of off-forest in accordance with state and federal laws. The award will be based on the best value, weighing technical criteria and price approximately equally. Technical evaluation factors include past performance, a proposed schedule, experience in cedar shingle roofing, and the technical approach. The period of performance is ten days after the notice to proceed, with a final delivery date not later than November 15, 2027. Key requirements include a payment bond for 100 percent of the award price, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Quotes must be submitted to the primary point of contact by November 5, 2026, and must include a completed SF 1442, price schedule, past performance questionnaire, and a written technical approach.
Roofing Contractors

POSTED

6 days ago

DEADLINE

in 16 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS