Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Transportation was posted on September 21, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NM FLAP US60(1)

Awarded
6982AF18B000023Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Bridge Cleaning and Sealing 2026
Solicitation # RFQ033777
The City of Columbus Department of Public Service is soliciting bids for the Bridge Cleaning and Sealing 2026 project, RFQ033777. This project focuses on schedule-based preventative maintenance for several bridges within the city limits, specifically the removal of debris and deicing chemicals and the application of non-epoxy, epoxy-urethane, or Soluble Reactive Silicate sealers to reinforced concrete components to prevent salt intrusion. The contract is a unit price bid type with an estimated value not to exceed 500,000 dollars, though the City reserves the right to adjust the base bid amount up to a maximum of 310,000 dollars. Bids will be evaluated based on the Total Evaluated Cost, which includes the base bid, contingency, and any owner-selected alternates. All bids must be submitted electronically via Bid Express by October 27, 2026, at 1:00 PM local time. Mandatory requirements for bidders include registration on the City's Vendor Services portal, a valid contract compliance certification number, and the submission of a bid bond equal to 10 percent of the proposed bid. Upon contract execution, a performance and payment bond for 100 percent of the contract amount is required. Contractors must comply with State of Ohio or Federal Bacon-Davis prevailing wage laws, maintain commercial liability insurance of at least 500,000 dollars per person and 1,000,000 dollars total, and adhere to State of Ohio Workers Compensation laws. Additionally, the contractor must utilize the City's Project Management Information System for submittals and report lane closures through the CLOSE Program.
City of Columbus – Department of Public Service

POSTED

about 3 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
SLED
2027026
Solicitation # 2027026
Spartanburg County Government is soliciting proposals for the Tier 2 Penny Crack Seal, Depth Patch, and Cape Seal Project as part of the 2023 Asphalt Roadway Improvement Program. The scope of work focuses on preventive maintenance for hot mix asphalt pavements across various locations, including the Pine Valley, Shenandoah, Twin Lakes, Shaftsbury, Carolina Oaks, and Emory Park subdivisions. Key technical requirements include cleaning cracks using a compressed air heat lance and applying black hot pour crack sealant meeting ASTM D6690 Type II and III standards. Additionally, the project involves Cape Seal applications utilizing binders and aggregates that comply with SCDOT Section 406 and SC-M-410 specifications. Work is subject to strict weather constraints, prohibiting material placement when ambient temperatures are below 32 degrees Fahrenheit or above 75 degrees Fahrenheit. The contract is governed by the laws of the State of South Carolina, with venue in Spartanburg County. Awarded contractors must maintain a minimum of 1 million dollars in general liability insurance and comply with the Drug Free Workplace Act and other federal civil rights and labor laws. Payment is made from appropriated funds, with undisputed invoices due upon receipt and considered past due after 30 days. Contractors are required to provide daily reports to the Engineer and are responsible for remediating any deficiencies, such as adhesion failure or aggregate raveling, at no additional cost. Proposals must be submitted via bidexpress.com and remain binding for 60 calendar days following the opening date.
Spartanburg County Government

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 237310
New
Federal
Cisco Branch Ontonagon River Bridge Replacement
Solicitation # 12445527Q0001
Solicitation 12445527Q0001 is a Request for Quotation issued by the USDA Forest Service for the replacement of the Cisco Branch bridge over the Ontonagon River in the Ottawa National Forest, Watersmeet Ranger District, Michigan. This total small business set-aside project, under NAICS code 237310, requires the removal of an existing concrete bridge and the construction of a new 70-foot single span concrete I-girder bridge featuring a concrete deck, concrete abutments, and H-pile foundations. The project is a Firm Fixed Price contract governed by FHWA Standard Specifications FP-14, with on-site construction expected to be completed within 180 calendar days after the Notice to Proceed, and all work finalized by October 1, 2027. The contractor must provide all labor, materials, and incidentals, adhering to strict environmental restrictions from the Michigan Department of Environment, Great Lakes, and Energy, which prohibit in-stream work from October 1 to May 31 to protect spawning trout. Award will be granted to the lowest priced, responsive, and responsible quoter. Bids must be submitted electronically to Paul Boucher by 1300 local time on October 26, 2026, and must include a signed SF-1442 and a fully priced Schedule of Items. The contract is subject to the Davis-Bacon Act, requiring prevailing wage rates and specific paid sick leave provisions for covered workers.
Csa East 13 Usda-Fs

POSTED

about 6 hours ago

DEADLINE

in 4 days
NAICS: 237310
New
Federal
Administrative Parking Lot Repairs
Solicitation # 1240LT27Q0019
Solicitation 1240LT27Q0019 is a Request for Quotation issued by the USDA Forest Service CSA Intermountain 8 for the repair and resurfacing of three parking lots located at the Boulder Ranger District Office, Clear Creek Ranger District Office, and the Fort Collins Administrative Site within the Arapaho and Roosevelt National Forest and Pawnee National Grassland. The scope of work includes crack sealing, pavement patching, seal coating, and re-striping to address wear and alligator cracking. This project is a total small business set-aside under NAICS code 237310, with a size standard of 45 million dollars. The contractor must commence work within 10 calendar days of the notice to proceed, with a final completion deadline of August 15, 2027. Award will be based on the best value to the government, evaluating both price and a technical approach. Offerors must submit a 1 to 3 page narrative execution plan and a construction schedule, such as a Gantt chart, while adhering to strict formatting requirements of Times New Roman 12-point font. Pricing must be submitted via the provided Excel Schedule of Items, as Adobe formats are prohibited. All quotes and supporting documentation must be submitted to Contract Specialist Jordan Carlsen by November 23, 2026, at 14:00 EST. The contract incorporates various FAR clauses, including Buy American construction materials and the Warranty of Construction, and requires registration in the System for Award Management.
Csa Intermountain 8 Usda-Fs

POSTED

about 6 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The NM FLAP US60(1) project involves the construction of a new 570 foot bridge crossing the Rio Puerco River in Socorro County, New Mexico, located approximately one mile south of the Bernardo/Mountainair exit on I-25. The scope of work includes roadway reconstruction at both ends, partial demolition of the existing bridge, safety improvements, and revegetation of disturbed areas. Key material requirements include 21,000 cubic yards of embankment construction, over 764,000 pounds of structural steel, and 610 cubic yards of structural concrete. The estimated contracting range for this project is between 4 and 6 million dollars, with a timeline spanning from August 2018 to June 2019. The successful bidder is required to submit approved demolition and erection plans to the Central Federal Lands Highway Division and notify the New Mexico Environment Department five days prior to starting construction. Strict environmental protections are in place, prohibiting the storage of petrochemicals within project limits and requiring refueling to occur at least 100 feet from surface water. Additionally, the contractor must maintain public access to the existing road and bridge, adhering to specific weight and size restrictions for equipment. All clearing activities must be completed between September 1, 2018, and April 14, 2019, and the construction access stream diversion must be removed and stabilized by July 24, 2019.

General Info

Contract Value

$6,167,258.96

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Old US Highway 60 approximately one mile south of the Bernardo/Mountainair exit (Exit 175) on Interstate 25 (I-25), Socorro County, NM, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jul 8, 2018 to Aug 8, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts1 person available
OfficeLAKEWOOD, CO, 80228, USA
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Sheri MuehlContracting Officer

Full Description

Show more
PROJECT DETAILS: NM FLAP US60(1), Old US60 Bridge THIS IS AN INVITATION FOR BID, FINAL PLANS AND SPECS ARE AVAILABLE. The project is located on Old US Highway 60 approximately one mile south of the Bernardo/Mountainair exit (Exit 175) on Interstate 25 (I-25). Old US Highway 60 serves as a primary link to Sevilleta National Wildlife Refuge and Bureau of Land Management lands, and a secondary link to Cibola National Forest. The project involves construction of a new 570' long bridge crossing the Rio Puerco River with roadway reconstruction on both ends, partial demolition of the existing bridge, safety improvements, and revegetation on disturbed surfaced outside the stream bed. SIGNIFICANT QUANTITIES (Schedule A): 20420-0000, EMBANKMENT CONSTRUCTION: 21,000 CUYD 25101-2200, PLACED RIPRAP, METHOD 2, CLASS 2: 950 CUYD 55101-2200, STEEL PIPE PILE, IN PLACE (24" X 1"): 1,107 LNFT 55201-0200, STRUCTURAL CONCRETE, CLASS A (AE): 610 CUYD 55401-2000, REINFORCING STEEL, EPOXY COATED: 174,078 LB 55502-0000, STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED: 764,300 LB 55601-0900, BRIDGE RAILING, STEEL (NM TYPE A32): 1,200 LNFT 65001-1000, CONSTRUCT AND MAINTAIN DIVERSION: LPSM MISCELLANEOUS: The successful bidder must submit demolition plan for the partial removal of the existing bridge and submit an erection plan for the new bridge construction. Both will need to be approved by Central Federal Lands Highway Division before construction can begin. The successful bidder will have to store all materials, stockpiles, and staging area outside of the active channel at elevation 4,730 feet. The successful bidder must notify New Mexico Environment Department (NMED) at least five days before starting construction to allow time to schedule monitoring or inspections. The successful bidder will not be allowed to store fuel, oil, hydraulic fluid, lubricants, or other petrochemicals within project limits. All equipment must be refueled at least 100 feet from surface water. The successful bidder must maintain access of the existing road and bridge to public traffic during construction of the new US60 Bridge. All construction equipment crossing the existing bridge must meet existing bridge restrictions including maximum vertical clearance of 14 feet; maximum horizontal width of 10 feet; and maximum weight of 10 tons. All equipment that does not meet the restrictions will have to utilize the diversion. All clearing activities will need to be completed between September 1, 2018 and April 14, 2019. The construction access stream diversion will need to be completely removed and stabilized by July 24, 2019. It is anticipated that this project will be advertised in AUGUST of 2018. The contracting range for this project is between $4 and $6 million. Notice to Proceed is anticipated August, 2018. Tentatively, the project will begin in August 2018 with a completion date in June 2019.

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS