Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

NM FS SNTFE310 263(1) Gallinas Canyon Road

Active
6982AF26Q000019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This request for quotation, solicitation number 6982AF26Q000019, is for geotechnical borings to support the design and construction of Gallinas Canyon Road in San Miguel County, New Mexico. The project involves a partnership between the Federal Highway Administration, the Central Federal Lands Highway Division, and the Forest Service to reconstruct a six-mile stretch of FR 263, including roadway resurfacing, widening, realignment, and potential bridge replacements. The scope of work requires nineteen planned boreholes focused on corridor characterization and bridge investigation to inform the 30 percent project design and cost estimate. The opportunity is a total small business set-aside under NAICS code 541380, managed by the Department of Transportation's Central Federal Lands Division. Responses are due by September 3, 2026. The primary point of contact for this effort is Eric Grosskreuz.

General Info

Geotechnical borings for Gallinas Canyon Road reconstruction in New Mexico, due September 3, 2026.

Agency

Department Of Transportation → 6982AF Central Federal Lands DivisiView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

NM, 87731, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6982AF Central Federal Lands Divisi
Contacts2 people available
OfficeLAKEWOOD, CO, 80228, USA
Organization / Agency
Department Of Transportation → 6982AF Central Federal Lands Divisi
View Agency Profile
Office AddressLAKEWOOD, CO, 80228, USA
Contacts
Eric Grosskreuz

Full Description

Show more

This RFQ is for geotechnical borings associated with the design and construction of Gallinas Canyon Road. The geotechnical investigation will gather subsurface data to inform the 30% project design and cost estimate. The program includes nineteen (19) planned boreholes. These boreholes fall into two categories: corridor characterization and bridge investigation.


Project Locations and Descriptions: The Federal Highway Administration (FHWA), Central Federal Lands Highway Division, and the Forest Service are partnering to reconstruct a portion of FR 263, Gallinas Canyon Road. This reconstruction project includes roadway resurfacing, widening, and realignment. The realignment incorporates options for several bridge replacements and rock cuts.


Gallinas Canyon lies within San Miguel County, NM. The project alignment begins at Burro Basin Trailhead and proceeds East for approximately 6 miles to the intersection of FR 263 and FR 156. The existing alignment consists of a narrow, winding road that crosses 15 bridges.


Similar Contracts

Same NAICS industry code

More opportunities from Department Of Transportation → 6982AF Central Federal Lands Divisi

Same awarding agency

NAICS: 237310
Federal
TX FW LGA 10(5) Steve Thompson Wildlife Drive
Solicitation # 6982AF26SS00006
This solicitation is a sources sought notice from the U.S. Department of Transportation’s Central Federal Lands Division to determine if there is sufficient interest from qualified small business concerns—including HUBZone, 8(a), woman-owned, and service-disabled veteran-owned small businesses—to set aside the upcoming TX FW LGA 10(5) Steve Thompson Wildlife Drive project for such firms. No plans or specifications are available at this time, and the notice is not a request for bids. Interested firms must submit by August 19, 2026, a statement of intent to bid, confirmation of applicable socioeconomic certifications, a bonding agent letter verifying capability to bond for a $5 million project and aggregate bonding capacity, and a detailed list of completed road construction projects that include Full-Depth Reclamation of chip seal and gravel surfaces, installation of new aggregate surface courses, and civil work such as concrete pads and aluminum access gates. Projects without these specific scopes will not be considered. The project, located in Laguna Atascosa National Wildlife Refuge in Cameron County, Texas, involves 13 miles of full-depth reclamation and 11,000 tons of aggregate surface course, with three alternate bidding options for thickness and extent of paving, and also includes aluminum gates, concrete pads, speed bumps, and safety signage. Estimated project cost ranges from $2 million to $5 million, with anticipated advertisement in fall 2026, construction starting in 2027, and completion expected by summer 2027. All participants must be registered in SAM, and size eligibility must comply with SBA affiliation rules under 13 CFR 121.103 and 13 CFR 121.108.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 26 minutes
View Details
NAICS: 237310
Federal
SD FLAP SDGFP PARKING(1) NORTH POINT PARKING LOT
Solicitation # 6982AF26B000002
The North Point Parking Lot project involves the complete reconstruction of a 98,000 square-foot parking area located at the North Point Recreation Area near Pickstown, South Dakota, adjacent to the Missouri River and upstream of Fort Randall Dam. The scope includes full removal and excavation of existing asphalt and base layers to a depth of 9.5 inches, followed by installation of 6 inches of aggregate base and 3.5 inches of new asphalt pavement. The project also involves subexcavation to remove poor subgrade soils, adjustments to parking lot slopes to ensure compliance with the Americans with Disabilities Act, and addition of a concrete pad for dumpster placement along with new signage and striping. During construction, the parking lot will be closed to maintain safety and project efficiency. Key work components include removal of approximately 5,700 cubic yards of roadway excavation and 3,000 cubic yards of subexcavation, placement of 3,800 tons of aggregate base, and 2,300 tons of asphalt concrete pavement. The anticipated timeline for the project begins with advertisement in March 2026, award in May 2026, issuance of Notice to Proceed in June 2026, and completion scheduled by September 2026. The estimated total project cost ranges between $2 million and $5 million, and the solicitation will be conducted through full and open competition under the Department of Transportation's Central Federal Lands Division. The project is identified under NAICS code 237310 and does not have any set-aside restrictions.
Highway, Street, and Bridge Construction

POSTED

5 months ago

DEADLINE

N/A
View Details