This Solicitation opportunity from Oklahoma was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
NON federal
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Choctaw Nation Housing Authority is soliciting bids for accessibility modifications to a 3-bedroom, 2-bathroom brick home located at 211 Maple Drive in Heavener, Oklahoma, with a total area of approximately 1,420 square feet on a slab foundation. The work includes replacing all three entry door thresholds with ADA-compliant versions, installing new weather stripping, repairing any damage to doors or trim caused by threshold replacement, cleaning and re-adhering existing flooring by removing residual adhesive, and installing two metal ADA ramps—one at the front walk measuring four feet wide by two inches tall, and another at the back door measuring three feet wide by three and a half inches tall. All work must comply with the 2019 International Residential Code and applicable ADA standards, and contractors are required to obtain all necessary permits and perform utility line locates at their own expense. The homeowner or property manager will determine all color selections for materials and finishes. Contractors must conduct a mandatory site visit prior to submitting a bid, and any conditions observable during that visit cannot be grounds for change orders after award. The contractor is responsible for complete cleanup, removal of all waste, and restoration of the yard to mowing condition upon completion. Indian Preference applies under tribal procurement policy, and if federal funds exceed $2,000, Davis-Bacon prevailing wage requirements will apply. All work must be performed by a licensed contractor in compliance with state and local regulations. Proposals must be submitted exclusively through the Housing Bid Board portal by 4:30 p.m. on August 17, 2026, and include itemized pricing with a valid price good date. No formal FAR clauses, CLINs, or evaluation factors are specified beyond the scope of work, and payment information, invoicing methods, and contract administration roles are limited to general contact details for the Property Manager and Inspector. The contract value is not stated, and no attachments or formal certification requirements are included.
General Info
Place of Performance
Heavener, OK, 74937, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Special Instructions: Home is a 3-bed 2 bath, brick home approx. 1420 sq. ft. shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. Any questions please contact (Property Manager Manager) Leslie James at 580-642-6338 or (Inspector) Kevin Mings at 580-317-3244
Doors: Remove and replace the thresholds on all three entry doors with ADA thresholds, install new weather stripping on each door, repair any damage done to the doors or trim do to replacing the thresholds.
Flooring: Clean the glue from the concrete under each piece of the floor covering that needs reglued, then reinstall the existing floor covering.
Special Equipment: Install a metal ADA ramp on the front walk where the sidewalk has settled where that it meets the front porch. (Approx. 4' wide and 2" tall) Install a metal ADA ramp on the back door from brick down to the porch (Approx. 3' wide and 3 1/2" tall)
Special Instructions: All work done must meet or exceed 2019 IRC. All applicable licenses apply. It is highly recommended contractor view job before biding. Contractor is responsible for all line locates and permits required Contractor will be responsible for cleanup and removal of all waste and repair yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. Contractor is responsible for all measurements, and count of materials needed.
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
