Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oklahoma was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

NON - FEDERAL

Closed
166523State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236118
New
SLED
Home Accessibility Modification for DORS Client CS #26-18)
Solicitation # BPM059368
The Maryland State Department of Education, Division of Rehabilitation Services (MSDE, DORS) is soliciting bids for solicitation R00B7600079 to procure a general contractor for home accessibility modifications and residential construction for a client in Laurel, Maryland. This is a Certified Small Business (CSB) designated procurement. The scope of work includes the installation of battery-operated curved indoor stairlifts and automated door openers, as well as necessary electrical work. All installations must comply with the Americans with Disabilities Act Accessibility Guidelines (ADAAG) of 1990 and 2010, ASME A18.1 for lifts, and various ANSI and NFPA standards. Additionally, the project is subject to the Build America, Buy America Act (BABAA), requiring that all iron, steel, and construction materials be produced in the United States. The procurement process includes a virtual pre-bid conference on October 20, 2026, and a mandatory site visit on October 22, 2026. Questions must be submitted by October 26, and final bids are due by 12 noon on October 29, 2026. Bidders must provide a letter of interest, a professional resume, proof of insurance, a signed bid form, and a copy of their HBR and/or MHIC license. Award decisions will be based on the lowest price among bidders who meet all requirements, with the most experience serving as the tie-breaking factor. The successful contractor must provide a two-year warranty on all project components and ensure that all work is inspected and approved by the DORS Agency Architect or Project Manager prior to payment.
MSDE - Division of Rehabilitation Services

POSTED

about 14 hours ago

DEADLINE

in 1 day
NAICS: 236118
New
SLED
FEMA Elevation Project - 2705 Church Street {4491-22} - REBID #3
Solicitation # 2027-IFB-031
Wicomico County is soliciting bids under solicitation 2027-IFB-031 for a FEMA/MEMA funded structural elevation project located at 2705 Church Street in Quantico, Maryland. The project requires a qualified vendor to elevate a residential structure and its kitchen to at least two feet above the base flood elevation. The scope of work includes the demolition of the existing foundation, construction of a new foundation using concrete piers, columns, and steel beams, and the subsequent lowering of the building onto the new structure. Additional requirements include obtaining necessary plumbing, electrical, and mechanical permits, disconnecting and reconnecting utilities, installing three new exterior stair systems, and ensuring all exterior siding and paint match original conditions per Historic District guidelines. Bids must be submitted electronically via the OpenGov e-Procurement Portal by November 3, 2026, at 2:30 p.m. The contract will be awarded to the lowest responsive and responsible vendor. The project must be completed by May 31, 2027, with a performance duration of 90 days following contract execution, weather permitting. Vendors are required to provide a Certificate of Good Standing from the Maryland Department of Assessments and Taxation and must adhere to strict insurance and bonding requirements, including performance and payment bonds if the contract exceeds 100,000 dollars. Payment for approved work will be issued within 30 days of receiving a proper invoice.
Planning and Zoning

POSTED

about 20 hours ago

DEADLINE

in 6 days
NAICS: 236118
New
SLED
RFP 26-24-CW_Re-Advertisement for the Elevation of Flood Prone Homes
Solicitation # RFP-26-24-CW
The City of Port Orange is soliciting proposals under RFP-26-24-CW for turnkey services to elevate up to 11 single-family residential structures to mitigate flood risk. Funded by the FEMA Hazard Mitigation Grant Program, the project requires elevating homes on new open foundations using concrete piers or pilings to achieve a 9-foot clearance above existing ground, ensuring protection against 100-year storm events. The scope of work includes permitting, utility disconnection and reconnection with underground electrical services, and the installation of medically necessary lift platforms for two of the residences. All work must strictly comply with the Florida Building Code, ASCE 24-14, and local floodplain ordinances. Proposals are due by November 13, 2026, with a final performance deadline of March 1, 2028. The City will rank respondents using a 10-point weighted scoring system based on responsiveness, technical capability, past performance, and professional licensure. Awardees must provide performance and payment bonds for 100 percent of the contract price and adhere to extensive federal and state compliance requirements, including E-Verify, anti-collusion, and non-discrimination standards. While the project involves construction, the Davis-Bacon Act does not apply; however, contractors must comply with the Copeland Anti-Kickback Act and the Contract Work Hours and Safety Standards Act for contracts exceeding $100,000.
Community Development

POSTED

about 21 hours ago

DEADLINE

in 16 days
NAICS: 236118
New
Federal
RTOIL Office rehab
Solicitation # N6893627Q0001
The Naval Air Warfare Center is soliciting quotes for the PM36 RTOIL Office Rehab project located at Naval Base Ventura County Point Mugu. This firm-fixed-price contract is a 100 percent small business set-aside with an estimated project magnitude between 250,000 and 500,000 dollars. The scope of work includes the demolition of approximately 2,455 square feet of carpet, 974 square feet of vinyl flooring, and 1,150 linear feet of base board, as well as the removal of all window blinds. Improvements involve installing 53 dimmable LED troffer light fixtures with associated switches, patching and painting 9,000 square feet of walls in light French Grey, painting 20 door frames, installing cushioned back carpet tiles and vinyl plank flooring, and mounting 16 new whiteboards. The performance period is 120 calendar days, with work beginning within 14 days of the Notice to Proceed. The closing date for quotes has been extended to October 30, 2026, at 4 PM PDT. Award will be granted to the responsible offeror determined to be most advantageous based on price, delivery schedule, technical compliance, and Supplier Performance Risk System assessments. Offerors must provide sufficient technical information to demonstrate project understanding to be considered. Key requirements include the submission of a Quality Control Plan managed by a NAVFAC Contractor Quality Management certified manager, adherence to Davis-Bacon prevailing wage rates for Ventura County, and the provision of required payment bonds. Invoicing will be processed via Wide Area WorkFlow with net 30 payment terms.
Naval Air Warfare Center

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 236118
New
SLED
Housing Rehabilitation Program- 1137 Bel Air Ct, Modesto, CA 95350
Solicitation # HUD-INF-IFB-00132
Solicitation HUD-INF-IFB-00132 is an invitation for bids for residential repairs and rehabilitation at 1137 Bel Air Ct, Modesto, CA 95350. Funded by the U.S. Department of Housing and Urban Development (HUD), the project is administered by the City of Modesto's Community and Economic Development Department. The selected contractor must provide all labor, materials, and supervision to complete the work in accordance with California Building Code standards and the Community Development Division's Housing Rehabilitation Program. Key requirements include holding a valid California Class B General Building Contractor license and maintaining approved insurance coverage for general liability, workers' compensation, and automobile liability through the City's Public Improvement Notification System (PINS). Bids must be submitted electronically via the OpenGov Procurement Portal by November 2, 2026, at 4:00 pm. Proposals must include a Work Write-Up with itemized costs, and the City reserves the right to reject bids that exceed the Housing Rehabilitation Specialist's cost estimate by more than 15%. While the project is not subject to prevailing wage requirements, the City strongly encourages participation from Section 3 businesses. The awarded contractor is required to provide a COVID-19 Health and Safety Plan and an operation and maintenance manual upon completion. Performance is subject to liquidated damages of 65 dollars per day for delays, and final payment is contingent upon a signed Certificate of Completion and necessary termite and lead-based paint clearances.
Community and Economic Development

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 236118
New
SLED
Housing Rehabilitation Program-1017 Crippen Ave, Modesto, CA 95351
Solicitation # HUD-INF-IFB-00130
The City of Modesto Community and Economic Development Department is soliciting bids for a housing rehabilitation project located at 1017 Crippen Ave, Modesto, CA 95351 under solicitation number HUD-INF-IFB-00130. Funded by the U.S. Department of Housing and Urban Development, the project involves specific repairs detailed in a Work Write-Up, requiring the contractor to provide all necessary labor, materials, and supervision. All work must comply with 2025 California Codes, the City of Modesto Housing Rehabilitation Specification Manual, and OSHA asbestos standards. The approximate contract award date is January 2027, with final payment contingent upon inspection and approval by the homeowner and the City, as well as the submission of termite and lead-based paint clearances. Eligible bidders must hold a valid California General Contractor Class B license and be listed on the Department's Approved Contractor List. Mandatory requirements include maintaining general liability, workers compensation, and automobile liability insurance, with proof submitted via the City's Public Improvement Notification System. Bids must be submitted electronically through the OpenGov Procurement Portal by the deadline and must include itemized costs. To be considered reasonable, bids must fall within 15 percent of the Housing Rehabilitation Specialist's cost estimate. While prevailing wages are not required, the City strongly encourages participation from Section 3 businesses to expand economic opportunities for low-income residents.
Community and Economic Development

POSTED

2 days ago

DEADLINE

in 5 days
NAICS: 236118
New
SLED
Housing Rehabilitation Program- 103 Chabot Ct, Modesto, CA 95354
Solicitation # HUD-INF-IFB-00131
The City of Modesto Community and Economic Development Department is soliciting bids for a housing rehabilitation project located at 103 Chabot Ct, Modesto, CA 95354, under solicitation number HUD-INF-IFB-00131. Funded by the U.S. Department of Housing and Urban Development, the project emphasizes Section 3 participation to expand economic opportunities for low-income individuals. The scope of work requires the selected contractor to provide all labor, materials, and supervision to complete repairs in accordance with the project Work Write-up, 2025 California Codes, and the City of Modesto Housing Rehabilitation Specification Manual. Bidders must hold a valid California General Building Contractor Class B license and be listed on the City's Approved Contractor List. All bids must be submitted electronically via the OpenGov Procurement Portal by the designated deadline, as hard-copy or emailed submissions will not be accepted. To be considered, bids must fall within 15 percent of the Housing Rehabilitation Specialist's cost estimate. Mandatory requirements include proof of General Liability, Workers Compensation, and Automobile Liability insurance approved through the Public Improvement Notification System. While the project is not subject to prevailing wage requirements, the contractor must adhere to strict health and safety standards, including COVID-19 protocols and OSHA asbestos and lead-based paint standards. The contract is expected to be awarded around January 2027, with a one-year warranty period following final acceptance. Payment requests require signatures from the contractor, homeowner, and City specialists, with reimbursement typically occurring within 30 days. Failure to meet completion timelines may result in liquidated damages of 65 dollars per calendar day. Bidders are responsible for verifying site conditions through a mandatory bid tour and must provide an operation and maintenance manual for all new equipment upon project completion.
Community and Economic Development

POSTED

2 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The contract requires a comprehensive renovation of a 3-bedroom, 2-bathroom brick home approximately 1500 square feet with a slab foundation and shingle roof to make it fully livable and move-in ready. All work must comply with the 2019 International Residential Code, and contractors are mandatory to conduct a site visit prior to bidding—no change orders will be accepted for conditions visible during that inspection. The contractor is fully responsible for securing all permits, conducting line locates, managing waste removal, restoring the yard to mowing condition, and coordinating with the property manager for color and material selections. The scope includes complete drywall replacement up to two feet from the floor, new waterproof vinyl plank flooring throughout with new baseboards, replacement of all windows with insulated low-E vinyl units and new screens and blinds, and installation of two new insulated metal entry doors and all interior doors with matching hardware. Plumbing work includes full replacement of supply and drain lines, new faucets and fixtures in both bathrooms and the kitchen, installation of two new commodes, and connection of the dishwasher. Electrical upgrades involve replacing all lighting fixtures, switches, outlets, smoke alarms, and can lights. Cabinets must be replaced with hardwood fronts and plywood bulkheads, new granite countertops installed, and matching backsplashes added. HVAC systems must be verified for code compliance, new vent covers and a thermostat installed. Tree and shrub removal, power washing, mulching, and fencing replacement are required, along with a new French drain system, topsoil grading, seeding, and sodding. Interior and exterior painting is required throughout including trim, doors, and garage. The contractor must supply and install a washer, dryer, and dishwasher; a refrigerator and stove are provided by the homeowner. Pest control treatment is mandatory, and the property must remain mowed until completion. All cleanup and site restoration are the contractor’s responsibility.

General Info

Comprehensive renovation of 1500 sq ft brick home to code with new flooring, windows, doors, plumbing, electrical, cabinets, HVAC, landscaping, and appliances.

Place of Performance

Hugo, OK, 74743, USA

Set-Aside

NONE

Documents

2

Bid Solicitation 800-0008-1276 for Home Renovation - Choctaw Nation Housing Authority

PDF, High priority: read this firstrfq
High

Choctaw Nation Housing Authority Bid Request 2026-07-30

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Choctaw Nation Housing Authority Procurement TeamProcurement Team
The CWProperty Manager

Full Description

Show more
NON - FEDERAL Repair home to livable move in ready. Kayla Pinkston REPO
Special Instructions: Home is a 3-bed, 2-bath brick home approx. 1500 sq. ft., shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. All work done must meet or exceed the 2019 IRC. All applicable licenses apply. It is highly recommended contractor view the job before bidding. The contractor is responsible for all line locates and permits required. The contractor will be responsible for cleanup and removal of all waste and repair the yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. The contractor is responsible for all measurements and the count of materials needed. CW# +1 (555) 000-0000 Carla Grimmett Insp.# +1 (555) 000-0000 Mark Hopkins
General Maintenance: Unit must be cleaned up and move-in ready. Floors mopped and windows cleaned; everything must be cleaned, including closet rods. All trash on site needs to be hauled off. The property manager will decide all colors and materials used. The contractor will be responsible for having all utilities turned on. The contractor we need to meet with the property manager before bidding
Drywall: Remove and replace all drywall on the walls,2' up from the floor; install new ½” drywall, tape, bed, texture to match existing finish. All small holes, cracks, scuff marks, glue, tape, nails, screws, and such have to be removed from the drywall and repaired to match. This includes the garage, too
Flooring: Remove existing floor covering throughout the home. Flooring is glue-down. The floors must be cleaned before installation; install new waterproof floating vinyl plank flooring with a minimum 3/16” thick flooring. Pull the toilet and install flooring up to the floor flange. Install all new baseboard throughout the house for a proper fit, and paint the baseboard
Windows: Remove and replace a single window by the back exterior door. Install new insulated vinyl, low E, tilt sash windows. Repair any, and all damage due to window replacement, including paint and all trim, including window stools/sills if required, inside and out. Repair or replace any and all deteriorated framing as needed for proper repair. The contractor is responsible for the exact window measurements. Caulk and seal around all windows throughout the house, and install new window screens on all windows. Install blinds on all windows
Doors: Remove and replace 2 entry doors. Install 2 pre-hung six-panel insulated metal doors. Install all trim required for proper fit and finish. Install new combination, keyed-alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes. Remove and replace all interior doors. Install new pre-hung interior doors, trim, and hardware (Kwikset or comparable). Stain or paint to match new or existing finishes.
Plumbing: Remove and replace kitchen and bathroom supply lines with shut-off valves and drain lines. Install Delta or comparable faucets/mixing valves throughout. Install 2 commodes, a wax ring, and supply and shut-off valves. Also install new tub and shower faucet/mixing valves in both bathrooms. Will need to hook up dishwasher
Electrical: Install new light covers for ceiling fans. Remove and replace can lights in the kitchen area. Remove and replace the can light in the master bathroom and all exterior lights. Remove and replace all light switches and covers, and outlets inside and outside and covers and smoke alarms
Cabinets: Remove and replace existing cabinets; install upper and base cabinets. Install new granite countertops, including the bar top in the wall. Stain and Seal/Paint. Cabinets must be all hardwood fronts and plywood bulkheads; particleboard will not be accepted; Repair all damage due to replacement, which includes drywall and flooring; install all trim required for proper fit and finish. Install new matching backsplash as needed in the cooking area. Remove and replace existing vanity/vanities, to match existing. All vanities must have plywood bulkheads hardwood fronts and any necessary hardware required for proper finished installation. Stain and Seal/paint. Repair all damage due to replacement which includes drywall and flooring, install any and all trim required for proper fit and finish. Install new matching backsplash as needed
Mechanical-HVAC: Verify that all electrical components servicing the HVAC system-including wiring, breakers, panels, and fuses-are properly grounded and compliant with all applicable codes. Any non-compliant conditions shall be corrected by the contractor. Ensure that the HVAC system is running properly; install new vent covers and a new thermostat
Tree Removal: Remove all shrubs, ivy vines, and small trees around the house and fence area of the home, and remove the paver blocks also. Install mulch in the area where shrubs were in front of the house. The exterior of the house and garage will need to be power-washed. The contractor will be responsible for the cleanup and removal of all waste and the repair of the yard back to mowing condition
Fencing: Remove and replace all chain-link fencing around the back side of the house with the same black coating as the original fencing and install new single and double gates. Do not use old fencing. The neighbors will need to be notified in advance because they have pets
Painting: Paint all of the interior and exterior of the home, this includes all trim, drywall, siding, doors, interior, exterior, garage, and garage door. The Property Manager will pick the colors
Site improvements: Bring in topsoil and spread it around the back porch so it's not such a drop off. Seed the new topsoil and the back yard area. There will need to be a French drain built on the east side of the home to match. start in the front where the other one ends and run all the way back to the end of the back yard to match the other side. Each downspout will need an extension so that it runs in the drain and does not overshoot it. Finish it out with sod around the new drain. Haul off all trash and debris. The contractor will need to keep the yard mowed for the remainder of the job. and have pest control treat the house
Appliances: The contractor is responsible for getting a new washer, dryer, and dishwasher; we will provide a new fridge and stove. The contractor is to install all, the dryer will need a new vent cover on the outside

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS