Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

NON - FEDERAL

Active
166523State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires a comprehensive renovation of a 3-bedroom, 2-bathroom brick home approximately 1500 square feet with a slab foundation and shingle roof to make it fully livable and move-in ready. All work must comply with the 2019 International Residential Code, and contractors are mandatory to conduct a site visit prior to bidding—no change orders will be accepted for conditions visible during that inspection. The contractor is fully responsible for securing all permits, conducting line locates, managing waste removal, restoring the yard to mowing condition, and coordinating with the property manager for color and material selections. The scope includes complete drywall replacement up to two feet from the floor, new waterproof vinyl plank flooring throughout with new baseboards, replacement of all windows with insulated low-E vinyl units and new screens and blinds, and installation of two new insulated metal entry doors and all interior doors with matching hardware. Plumbing work includes full replacement of supply and drain lines, new faucets and fixtures in both bathrooms and the kitchen, installation of two new commodes, and connection of the dishwasher. Electrical upgrades involve replacing all lighting fixtures, switches, outlets, smoke alarms, and can lights. Cabinets must be replaced with hardwood fronts and plywood bulkheads, new granite countertops installed, and matching backsplashes added. HVAC systems must be verified for code compliance, new vent covers and a thermostat installed. Tree and shrub removal, power washing, mulching, and fencing replacement are required, along with a new French drain system, topsoil grading, seeding, and sodding. Interior and exterior painting is required throughout including trim, doors, and garage. The contractor must supply and install a washer, dryer, and dishwasher; a refrigerator and stove are provided by the homeowner. Pest control treatment is mandatory, and the property must remain mowed until completion. All cleanup and site restoration are the contractor’s responsibility.

General Info

Comprehensive renovation of 1500 sq ft brick home to code with new flooring, windows, doors, plumbing, electrical, cabinets, HVAC, landscaping, and appliances.

Agency

Oklahoma → Choctaw Nation Housing AuthorityView Agency

NAICS

236118 - Residential RemodelersView NAICS

Place of Performance

Hugo, OK, 74743, US

Set-Aside

NONE

Documents

(2)

2026-07-30__bid-166523--11-02-am.pdf

PDF

2026-07-30__bid-166523--10-50-am.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOklahoma → Choctaw Nation Housing Authority
Contacts2 people available
OfficeN/A
Organization / Agency
Oklahoma → Choctaw Nation Housing Authority
View Agency Profile
Office AddressN/A
Contacts
Choctaw Nation Housing Authority Procurement TeamProcurement Team
The CWProperty Manager

Full Description

Show more
NON - FEDERAL Repair home to livable move in ready. Kayla Pinkston REPO
Special Instructions: Home is a 3-bed, 2-bath brick home approx. 1500 sq. ft., shingle roof. Slab on grade. All prospective contractors are required to visit the project site before submitting a bid. Change orders due to conditions that could have been identified during the site visit will not be considered or approved. All work done must meet or exceed the 2019 IRC. All applicable licenses apply. It is highly recommended contractor view the job before bidding. The contractor is responsible for all line locates and permits required. The contractor will be responsible for cleanup and removal of all waste and repair the yard back to mowing condition. Homeowner/Property Manager will select any/all colors used for the job. The contractor is responsible for all measurements and the count of materials needed. CW# 580-642-6035 Carla Grimmett Insp.# 580-570-9771 Mark Hopkins
General Maintenance: Unit must be cleaned up and move-in ready. Floors mopped and windows cleaned; everything must be cleaned, including closet rods. All trash on site needs to be hauled off. The property manager will decide all colors and materials used. The contractor will be responsible for having all utilities turned on. The contractor we need to meet with the property manager before bidding
Drywall: Remove and replace all drywall on the walls,2' up from the floor; install new ½” drywall, tape, bed, texture to match existing finish. All small holes, cracks, scuff marks, glue, tape, nails, screws, and such have to be removed from the drywall and repaired to match. This includes the garage, too
Flooring: Remove existing floor covering throughout the home. Flooring is glue-down. The floors must be cleaned before installation; install new waterproof floating vinyl plank flooring with a minimum 3/16” thick flooring. Pull the toilet and install flooring up to the floor flange. Install all new baseboard throughout the house for a proper fit, and paint the baseboard
Windows: Remove and replace a single window by the back exterior door. Install new insulated vinyl, low E, tilt sash windows. Repair any, and all damage due to window replacement, including paint and all trim, including window stools/sills if required, inside and out. Repair or replace any and all deteriorated framing as needed for proper repair. The contractor is responsible for the exact window measurements. Caulk and seal around all windows throughout the house, and install new window screens on all windows. Install blinds on all windows
Doors: Remove and replace 2 entry doors. Install 2 pre-hung six-panel insulated metal doors. Install all trim required for proper fit and finish. Install new combination, keyed-alike hardware, Kwikset or comparable. Caulk and seal inside and out. Paint to match new or existing finishes. Remove and replace all interior doors. Install new pre-hung interior doors, trim, and hardware (Kwikset or comparable). Stain or paint to match new or existing finishes.
Plumbing: Remove and replace kitchen and bathroom supply lines with shut-off valves and drain lines. Install Delta or comparable faucets/mixing valves throughout. Install 2 commodes, a wax ring, and supply and shut-off valves. Also install new tub and shower faucet/mixing valves in both bathrooms. Will need to hook up dishwasher
Electrical: Install new light covers for ceiling fans. Remove and replace can lights in the kitchen area. Remove and replace the can light in the master bathroom and all exterior lights. Remove and replace all light switches and covers, and outlets inside and outside and covers and smoke alarms
Cabinets: Remove and replace existing cabinets; install upper and base cabinets. Install new granite countertops, including the bar top in the wall. Stain and Seal/Paint. Cabinets must be all hardwood fronts and plywood bulkheads; particleboard will not be accepted; Repair all damage due to replacement, which includes drywall and flooring; install all trim required for proper fit and finish. Install new matching backsplash as needed in the cooking area. Remove and replace existing vanity/vanities, to match existing. All vanities must have plywood bulkheads hardwood fronts and any necessary hardware required for proper finished installation. Stain and Seal/paint. Repair all damage due to replacement which includes drywall and flooring, install any and all trim required for proper fit and finish. Install new matching backsplash as needed
Mechanical-HVAC: Verify that all electrical components servicing the HVAC system-including wiring, breakers, panels, and fuses-are properly grounded and compliant with all applicable codes. Any non-compliant conditions shall be corrected by the contractor. Ensure that the HVAC system is running properly; install new vent covers and a new thermostat
Tree Removal: Remove all shrubs, ivy vines, and small trees around the house and fence area of the home, and remove the paver blocks also. Install mulch in the area where shrubs were in front of the house. The exterior of the house and garage will need to be power-washed. The contractor will be responsible for the cleanup and removal of all waste and the repair of the yard back to mowing condition
Fencing: Remove and replace all chain-link fencing around the back side of the house with the same black coating as the original fencing and install new single and double gates. Do not use old fencing. The neighbors will need to be notified in advance because they have pets
Painting: Paint all of the interior and exterior of the home, this includes all trim, drywall, siding, doors, interior, exterior, garage, and garage door. The Property Manager will pick the colors
Site improvements: Bring in topsoil and spread it around the back porch so it's not such a drop off. Seed the new topsoil and the back yard area. There will need to be a French drain built on the east side of the home to match. start in the front where the other one ends and run all the way back to the end of the back yard to match the other side. Each downspout will need an extension so that it runs in the drain and does not overshoot it. Finish it out with sod around the new drain. Haul off all trash and debris. The contractor will need to keep the yard mowed for the remainder of the job. and have pest control treat the house
Appliances: The contractor is responsible for getting a new washer, dryer, and dishwasher; we will provide a new fridge and stove. The contractor is to install all, the dryer will need a new vent cover on the outside

Similar Contracts

Same NAICS industry code

NAICS: 236118
New
SLED
Floor falling in - bathroom
Solicitation # 168606
The Choctaw Nation Housing Authority is soliciting bids for the complete renovation of a deteriorating master bathroom in a 4-bedroom, 2-bath pier-and-beam home located at 304 West 3rd, Heavener, OK 74937. The project requires full removal and replacement of the existing shower system with a low-entry base and surround made of Swan-Stone or an equivalent material at least 1/4 inch thick, with FRP strictly prohibited. All plumbing fixtures, including the shower handle, mixing valve, and faucet, must be Delta or comparable brand. The existing floor covering and damaged subflooring must be removed and replaced with a minimum 3/16-inch thick waterproof floating vinyl plank flooring, extended up to the floor flange, with the homeowner selecting all color finishes. The contractor must repair or replace all affected drywall, trim, and finish flooring, and complete a full cleanup, removal of waste debris, and restoration of the yard to mowing condition. All work must comply with the 2019 International Residential Code and applicable local licensing requirements, and the Davis Bacon Act wage standards apply since the project exceeds $2,000. A mandatory site visit is required before bid submission, and no change orders will be approved for conditions visible during that visit. The contractor is solely responsible for obtaining all permits, performing utility line locates, measuring materials accurately, and ensuring compliance with all specified standards. Bids must be submitted exclusively through the Housing Bid Board by 4:30 p.m. on August 8, 2026, with itemized pricing and a valid price-good date. The award will reflect Indian Preference, prioritizing Indian-owned business enterprises, and there is no indication of formal FAR clauses or federal contracting mechanisms beyond tribal policy. Payments will be processed via P.O. Box G, Hugo, OK 74743, with inspection and final acceptance conducted on-site by the assigned inspector.
Choctaw Nation Housing Authority

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 236118
New
SLED
FISH 181185
Solicitation # BD-27-1795-MHA03-MHA03-131892
The contract pertains to ADA bathroom renovations at the Oakland Ave Community Residence in Methuen, Massachusetts, under Project #181185, with an estimated value of $94,400. The solicitation, issued by the Methuen Housing Authority through its contracting office in Chelmsford, Massachusetts, requires all bids to be submitted electronically via biddocs.com by August 18, 2026, at 1:00 PM EDT, with a pre-bid conference scheduled for August 11, 2026. Work must comply with Massachusetts General Laws Chapter 149, including minimum wage provisions and mandatory workforce participation benchmarks of 6.9% women and 15.3% minority laborers. The scope includes demolition of existing finishes and installation of new fixtures, flooring, and walls to meet ADA accessibility standards, though specific technical specifications or material standards are not detailed in the publicly available information. The place of performance is officially listed as Chelmsford, MA, despite the physical work occurring in Methuen. No federal acquisition regulation clauses apply, as this is a state-level procurement; therefore, FAR sections such as I, K, M, and H are not applicable, and no UEI, CAGE, size status, or socioeconomic certifications are required. Bids must include a 5% deposit, and no clause or form explicitly defines contract type, payment terms, inspection criteria, delivery schedule, or award basis, with all details dependent on full contractual documents available through biddocs.com. The contracting office remains the primary point of contact, with Sharon Smith identified as the purchaser and no assigned COR, COTR, or PCO named in the solicitation.
MHA03 - Methuen Housing

POSTED

1 day ago

DEADLINE

in 18 days
View Details
NAICS: 236118
New
SLED
ASA shower and commode
Solicitation # 169041
The contract entails the complete renovation of a shower and commode area in a 4-bedroom, 2-bathroom brick home with a slab-on-grade foundation and shingle roof, totaling approximately 1800 square feet. All existing plumbing fixtures must be removed and replaced, including installation of a new low-entry shower base and surround made from Swan-Stone or an equivalent material with a minimum thickness of 1/4 inch; FRP is prohibited. The shower must include a Delta or comparable handle and mixing valve, two ADA-compliant adjustable grab bars, an adjustable handheld shower faucet with its own guide rod separate from the grab bars, and a portable shower seat. The existing toilet, which has a malfunctioning flush mechanism, must be replaced with a new ADA comfort height model along with a new wax ring, shut-off valve, and supply line. Necessary repairs to the drain or flange must be made to resolve the slow-flushing issue, while ensuring all other fixtures continue to drain properly. All associated drywall, trim, subflooring, finish flooring, and painting necessary to complete the work must be repaired or replaced. All work must comply with the 2019 International Residential Code and require all applicable licenses, permits, and line locates to be secured by the contractor. Prospective bidders are required to conduct a site visit prior to submission, and no change orders will be permitted for conditions that could have been observed during that visit. The contractor is responsible for accurate material measurements, full cleanup, removal of all debris, and restoration of the yard to mowing condition. Color selections for finishes are to be determined by the homeowner or property manager. The project is managed by the Choctaw Nation Housing Authority in Poteau, Oklahoma, with final bids due by August 11, 2026. Contact for inquiries is available through Case Manager Ferne Gunn or Inspector Kevin Mings, and all submissions must align with the solicitation number 169041.
Choctaw Nation Housing Authority

POSTED

3 days ago

DEADLINE

in 12 days
View Details

More opportunities from Oklahoma → Choctaw Nation Housing Authority

Same awarding agency

NAICS: 238910
New
SLED
level yard to the west of home. This area of the yard has poor drainage and holds water. Make yard to where tenant can…
Solicitation # 168724
The project involves leveling and improving the drainage of the western yard area of a 3-bedroom, 2-bathroom brick home located in Atoka, Oklahoma, which currently retains standing water due to poor grading. The work requires using existing dirt from the old fence row on the west side of the property to fill and grade the low-lying area from south to north, with additional soil brought in as necessary to ensure proper slope and drainage. The finished grade must allow the tenant to easily maintain the area without water pooling, and sod must be installed upon completion. All exposed dirt must be covered to prevent erosion, and the entire area must be restored to a mowable condition. The contractor is responsible for all site preparation, line locates, permits, material calculations, waste removal, and cleanup. Work must comply with the 2019 International Residential Code and all applicable licensing requirements. The homeowner or property manager will determine all color selections. Contractors must visit the site prior to bidding; no change orders will be accepted for conditions that should have been identified during the site visit. Proposals must be submitted by August 13, 2026, and all inquiries should be directed to the Choctaw Nation Housing Authority Procurement Team.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 14 days