This Solicitation opportunity from Oklahoma was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
nonfederal
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Choctaw Nation Housing Authority is soliciting bids for the rehabilitation of a 3-bedroom LEAP home with a slab foundation totaling 1,400 square feet located in Durant, Oklahoma, to bring it to move-in condition. The project requires comprehensive interior and exterior improvements including full repainting of all walls ceilings closets baseboards and doors matching existing finishes, removal of TV mounts with drywall repairs tape bed and texturing to blend seamlessly, and complete exterior painting of soffits fascia doors and the garage door. Gutter systems must be repaired or replaced with new splash blocks installed as needed. Plumbing work involves replacing the kitchen garbage disposal and installing new wastewater lines under the sink, replacing the base cabinet to match the existing, installing two new toilets with new supply lines shut offs and wax rings, and performing a full service of the aerobic septic system to restore full functionality. Electrical tasks include replacing all light bulbs and nonfunctioning fixtures with equivalents. The contractor must install new mini blinds in every room matching current styles, supply and install a new washer and dryer in consultation with the case manager, and conduct a full HVAC service with provision of a six-month filter supply. All interior and exterior cleaning is required to ensure the home is move-in ready, including window cleaning, bathroom sterilization, and floor sanitization. The yard must be professionally mowed and weed-eaten at completion with all debris removed from inside and outside the property. Contractors are mandated to visit the site prior to bidding, and no change orders will be approved for issues that could have been identified during the visit. The contractor is also responsible for ensuring utilities are active during construction. Bids are due by July 30, 2026, with all inquiries and submissions directed through the Choctaw Nation Housing Authority Procurement Team.
General Info
Agency
NAICS
Place of Performance
Durant, OK, 74701, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Special Instructions: This will be a 3-bedroom LEAP HOME slab foundation 1400 s,q, Case MANAGER Miranda Payne 580-326-7521 Inspector Rex Haines 580-317-3166
Special Instructions: All prospective Contractors are required to visit the project before submitting bid. Change orders due to conditions that could have been identified during the visit will not be considered or approved.
Special Instructions: Contractor is responsible for having utility's turned on while work is being done to home.
Drywall: Do a complete and full painting of all walls ceilings closets baseboards all doors in home ,color to match what is there now. Remove all T.V. mounts and make any and all drywall repairs where needed in all rooms of home tape bed and texture to match.
Painting: Do a complete and full painting of all soffit and fascia on outside of home and a full and complete paint of all outside doors and garage door of home.
Gutter Installation or repair: Make any and all repairs to guttering on home and install new splash bloks where needed.
Plumbing: In kitchen sink area remove garbage disposal and install all new waste water lines at kitchen sink area.
Cabinets: Replace base of kitchen cabinet under sink area of kitchen replace to match what is there now.
Electrical: Change all light bulbs in home and replace any light fixtures that may not be working with equal to what is there now.
Special Equipment: Install all new mini blinds in all rooms of home equal to what is there now.
Plumbing: Install two new toilets in home equal to what is there now with new supply lines and shutoofs with new wax rings.
Appliances: Do a complete and full service of H.V.A.C and supply a six month filter supply when completed after services
Plumbing: Do a complete and full service of aerobic system putting all back to working order.
Appliances: Contractor is to supply new washer and dryer and do a complete and full install. Will need to get with CASE Manager on brand of appliance to install.
Special Instructions: Do a complete and full cleaning of home all bathrooms flooring and all windows of home making home move in ready.
Lawn Service: At the end of the job do a complete and full mowing and weed eating of yard . Remove all trash inside and outside of home.
More opportunities from Oklahoma → Choctaw Nation Housing Authority
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award