This Government Contract opportunity from California was posted on January 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Norco Fire Station 47 HVAC Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Norco is soliciting bids for the replacement of the HVAC system at Fire Station 47, with submissions due by February 10, 2026, at 10 a.m. This project requires a contractor to provide all labor, materials, equipment, and services to remove the existing HVAC system and install a new, high-efficiency system. The work must adhere to detailed plans, specifications, and contract documents while maintaining uninterrupted 24-hour operations at the fire station, which also serves as the City's Emergency Operations Center. Key tasks include selective demolition, structural modifications to the roof, installation of new HVAC units and associated ductwork, refrigerant and gas piping, along with electrical upgrades such as a new 400A panel and seismic bracing. The contractor is also responsible for mobilization, permitting, inspections, as-built documentation, testing, balancing, commissioning, and providing training, manuals, and warranties. Compliance with California Building Standards, Title 24 Energy Code, and Norco’s local requirements is mandatory to ensure minimal disruption to this critical facility. Critical to the contract is the operational continuity clause, which mandates that the contractor must sequence work and provide staffing and temporary environmental controls to ensure the fire station remains fully functional throughout the project. Each HVAC unit removal and installation must be completed within the same workday, with no interruption to emergency services. Noncompliance may lead to contract breach and financial penalties. The bid requires a 10% bid bond, and all communications for the project are managed through the City's Facilities and Maintenance Department, with Amanda Hamilton listed as the primary contact.
General Info
Agency
NAICS
Place of Performance
Norco Fire Station 47 HVAC Replacement Project -3902 Hillside Avenue Norco, CA 92860, CA, USSet-Aside
Documents
(4)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work includes furnishing all materials, equipment, tools, labor, and incidental items necessary to complete the project in accordance with the Plans, Specifications, and Contract Documents. The general scope for the Norco Fire Station 47 HVAC Replacement includes providing all labor, materials, equipment, and services necessary to remove the existing HVAC system and install a new, high-efficiency system while maintaining continuous station operations.
The contractor shall handle mobilization, permitting, inspections, and as-built documentation, as well as perform testing, adjusting, and balancing (TAB), BIM clash detection, and full commissioning to ensure compliance with design specifications. Work includes selective demolition of roofing for structural modifications, removal of existing HVAC units, ductwork, thermostats, refrigerant and condensate piping, and gas piping. Structural tasks involve installing a new wood beam and equipment platform, reframing roof openings, and repairing roofing penetrations. Plumbing work includes installing new condensate drains, gas shut-off valves, and vibration/seismic controls.
The HVAC scope covers procurement and installation of packaged heat pump units of various capacities, split systems, ductwork, insulation, refrigerant piping, dampers, silencers, sensors, and a new controls system with head-end equipment and CO₂ sensors. Electrical work includes safe-off of existing systems, installation of a new 400A panel and feeder, and all necessary connections, disconnects, and feeders for HVAC equipment, along with seismic bracing, firestopping, and temporary power. Deliverables include as-built drawings, TAB and commissioning reports, O&M manuals, warranties, and staff training. All work must comply with California Building Standards Code, Title 24 Energy Code, and City of Norco requirements, ensuring minimal disruption to the 24-hour operations of this essential facility.
Operational Continuity Requirement The Contractor acknowledges that Fire Station 47 serves as the City’s Emergency Operations Center (EOC) and houses firefighting personnel for continuous 24-hour operations. Accordingly, the Contractor shall perform all work in a manner that ensures uninterrupted functionality of the facility. When replacing air conditioning units, each unit shall be fully installed, connected, and operational by the end of the same workday in which installation commences. The Contractor shall sequence work, provide adequate staffing, and furnish any necessary temporary conditioning to maintain acceptable indoor environmental conditions at all times. Under no circumstances shall the Contractor’s activities impair, delay, or otherwise interfere with the essential operations of the Fire Station. Failure to comply with this requirement shall constitute a material breach of contract and may subject the Contractor to liquidated damages and other remedies as provided in the Contract Documents.
Bid Bond: 10.00%