Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oregon was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Notice of Exemption from Competitive Bidding - Design Build Sandy River Force Main

Closed
S-C01010-00017240State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves comprehensive wastewater infrastructure upgrades for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of 20-inch ductile iron force main and significant improvements to the Morgans Branch Pumping Station. Key station upgrades include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also requires the installation of new gravity sewers and manholes, with a total project estimate of 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MBE/WBE compliance, including an EPA MBE participation goal of 10.9 percent. Bidders must provide a completed EJCDC C-410 Bid Form, bid security, and evidence of authority to sign. The successful contractor will be required to provide performance and payment bonds and maintain proof of insurance. Performance is subject to liquidated damages of 1,000 dollars per day for failure to achieve substantial completion. Payment terms are set at thirty days after presentation to the owner, and the work must adhere to strict technical standards, including AWS D1.2 for welding and NEMA standards for motors.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 18 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing and restoration, as well as the relining, modification, or replacement of small and large diameter steel and ductile iron pipes and associated supports. Additional requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and the replacement of motor control center components. The project also encompasses electrical and instrumentation improvements, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is specifically targeting DBE, MBE, WBE, and SBE subcontractors, with a focus on services such as lead abatement, metals fabrication, painting, coatings, and trucking. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026. Contracting will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions to these documents must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

Water Environment Services is seeking public comments on its draft findings to exempt the Sandy River Lane Force Main Replacement Project from standard competitive bidding requirements, pursuant to LCRB C-049-0600 and ORS Chapter 279C.335, allowing the use of a Progressive Design Build approach through a Request for Proposal. This alternative contracting method is intended to streamline delivery by integrating design and construction under a single contractor selected based on qualifications, experience, and proposed solution rather than lowest bid. The solicitation, identified as S-C01010-00017240, was posted on June 15, 2026, with responses due by July 1, 2026, and is being managed by the Oregon state agency under the leadership of Purchaser Ryan Rice. The project will take place within Oregon and involves the replacement of a critical force main to improve water environmental infrastructure. Public input is being solicited to ensure transparency and accountability in the exemption process before final approval.

General Info

Sandy River Lane force main replacement to use progressive design-build under exemption, solicitation S-C01010-00017240, responses due July 1, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOregon → Water Environment Services
Contacts1 person available
OfficeOR, USA
Office AddressOR, USA
Contacts
Ryan *RicePurchaser

Interested Companies (14)

Cameron McCarthy Landscape Architecture & Planning
Jacobs Engineering GroupMiami, FL
Lease Crutcher Lewis

See All 14 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
In accordance with LCRB C-049-0600 and ORS Chapter 279C.335, this public notice is for the purpose of taking comments on the Water Environment Services ("WES") draft findings for the approval of an exemption from competitive bidding for a public improvement (i.e., alternative contracting method), utilizing a Request for Proposal ("RFP") for the selection of a Progressive Design Build ("Design Build") contractor for the Sandy River Lane Force Main Replacement Project.

More opportunities from Oregon → Water Environment Services

Same awarding agency

NAICS: 237110
SLED
BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements
Solicitation # S-C01010-00018145
The Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements project, solicitation S-C01010-00018145, is a construction effort managed by Water Environment Services for Clackamas County, Oregon. With an engineer's estimate of $3,700,000.00, the project involves replacing worn components across four parallel concrete aeration basins, including pumps, mixers, diffusers, gates, instruments, and electronic controls. A critical requirement of the scope is that the contractor must maintain continuous operation of the existing wastewater facilities throughout the construction process. The project is governed by EJCDC C-700 Standard General Conditions and requires adherence to Oregon state prevailing wage rates. The contract establishes a strict performance timeline with substantial completion required within 700 calendar days of the Notice to Proceed. Key milestones include the refurbishment of Aeration Basins 1 and 2 by September 30, 2027, and the completion of all four basins by September 30, 2028. Award will be granted to the lowest responsive and responsible bidder. Contractors are required to provide bid, performance, and payment bonds, and must submit a comprehensive Quality Control Plan within 30 days of the Notice to Proceed. Technical deliverables include a Facility Performance Demonstration certification and final as-built drawings provided in AutoCAD and PDF formats.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS