Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on June 16, 2021. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Notice of Intent to Sole Source- Code & Specifications updates for Construction Documents and Construction Phase Services for Munitions Load Crew Training Facility (MLCTF), District of Columbia ANG -113th WG, Joint Base Andrews, Camp Springs, MD

Closed
W912DR21R0044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 15 hours ago

DEADLINE

in 14 days

General Info

NAICS

541330 - Engineering Services

Place of Performance

Camp Springs, MD, 20746, USA

Set-Aside

NONE

Documents

1

DCANG+MLCTF_JA+Redacted+15JUN21.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist Baltimore
Contacts2 people available
OfficeBALTIMORE, MD, 21201-2526, USA
Office AddressBALTIMORE, MD, 21201-2526, USA

Full Description

Show more
NOTICE OF INTENT TO SOLE SOURCE-For Code & Specifications updates for Construction Documents and Construction Phase Services for the Munitions Load Crew Training Facility (MLCTF) for the District of Columbia ANG -113th WG, Joint Base Andrews, in Camp Springs, Maryland. Contract No. TBD This Notice is being published in accordance with Federal Acquisition Regulation (FAR) requiring the dissemination of information on proposed contract actions. This is a notice of intent to award a sole-source contract. The statutory authority for this sole-source procurement is 10 United States Code 2304(c)(1) as implemented in Federal Acquisition Regulation 6.302-1(a)(2)(iii)(B), - Only one responsible source and no other supplies or services will satisfy agency requirements. The United States Army Corps of Engineers (USACE) Baltimore District (NAB) intends to solicit and award a Firm-Fixed-Price Sole Source Contract to POND & Company to provide code & specifications updates to the Construction Documents originally completed in 2017, and Construction Phase (Title II) Services for the construction of the Mission Load Crew Training Facility for the District of Columbia ANG -113th WG, Joint Base Andrews, in Camp Springs, Maryland. The revisions will encompass necessary changes to the drawings and specifications to bring them into compliance with all current applicable model codes and reference standards. Additionally, POND will provide Construction Phase Services for construction of this new facility. POND originally designed the facility and prepared the current Construction Documents comprised of architectural, civil, structural, mechanical, electrical, plumbing and specifications. Upon completion of the revisions to the Construction Documents, and upon completion of bidding and subsequent award for construction, POND will be responsible as the Designer of Record (DOR,) for Construction Phase Services and will respond to all Request for Information (RFI's), will review shop drawings and submittals, and will provide interpretation of the Construction Documents to the General Contractor during all phases of construction. POND will coordinate Punch Out inspection & Punch List Report with USACE and will review the general-contractor prepared O&M Manual at project close-out. Requirement In general terms, the task order consists of providing revisions to plans & specs to update them per current codes and standards, followed by construction phase services in support of new building construction. The Architect-Engineer (A-E) shall provide all necessary services required to revise the Construction Documents to take into account changes to the building codes and specifications that have occurred since the drawings were originally completed in 2017. Additionally, the A-E shall provide all necessary services required to continue support to the construction field office during the construction period. Construction Document Revisions: The A-E shall provide 500 hours of technical assistance with a team of blended disciplines to the Area/Resident Engineer and their staff, as required to complete the necessary revisions. This assistance will include, but not be limited to, the following tasks: Review life-safety & code analysis sections for changes per current codes in force (ICC, UFC, NFPA, etc.) and update/ revise as necessary. Revise construction drawings as may be required as a result of changes per Item - a above. Review the project specifications for changes per current codes & reference standards and update/ revise the specifications as necessary. Construction Phase Services: The A-E shall provide 1,000 hours of technical assistance with a team of blended disciplines to the Area/Resident Engineer and their staff, as requested by them in writing for the duration of the construction period. These requests will not come from the COR, but rather USACE Construction Division staff. This assistance will include, but not be limited to, the following tasks: Review of Shop Drawings Site Visits during Construction Attendance at meetings which may include the pre-work conference and design progress meetings with the contractor. Responses to requests for information (RFIs) to assist the Baltimore District Reviews of special construction techniques, methods, and procedures and annotate available documentation to provide recommendations for approval or disapproval. Reviews, evaluations, and construction time and cost impacts for User requested changes. Reviews of Contractor Value Engineering Proposals and provide comments and/or recommendations for approval or disapproval. Responses to requests for information to assist the Area/Resident Engineer. Note: The A-E will not be compensated for construction phase support required to correct errors or omissions in the design documents. Technical Assistance shall be task specific and rendered only after receipt of a written request from the Area/Resident Engineer and their staff. The A-E shall document the effort expended for each Technical Assistance task in the summary of work included with their invoices. Operations and Maintenance (Option): The A-E shall prepare an Operations & Maintenance Manual for the elements and processes included in this design. The manual shall be written in a format which can be directly added to the existing manuals. Operations Manual: The operations manual shall address both design concepts and operational procedures. The manual will describe the specific equipment provided, including how various equipment components function together to comprise the system, and how the instrumentation relates to the system and controls its operation. Multicolor process schematic diagrams will be developed to show all equipment, piping, and valves. Standard operating procedures will be developed and shall include: Initial start-up Normal start-up Normal operation and monitoring Normal shutdown Emergency shutdown System alarms and emergency actions Safety requirements (Specifically - ammonia safety) Maintenance Manual: The maintenance manual will provide information on all equipment. The following shall be included for each piece of equipment: Equipment data (Manufacturer, type, model, size number of units, etc.) Recommended spare parts list Routine maintenance tasks (including recommended frequency) Trouble shooting guide MAXIMO Work Order System Input: Using the O&M information gathered above, the A-E will update our MAXIMO Work Order System as follows: Complete and fill in the equipment application to ensure an accurate inventory of all equipment assets. As a minimum the model number, serial number, manufacturer and nameplate data should be inputted for each equipment. Attach documents or electronic files in pdf format to equipment records using the attached document feature. Documents to be attached shall include exploded part diagrams, pump curves and/or other pertinent information. Review and update the preventative maintenance procedures and schedules for equipment to ensure accurate tracking of preventative maintenance by MAXIMO. To facilitate this, photos and other diagrams shall be inputted as necessary. Pre-Startup Training (Option): The A-E will prepare a pre-startup training course, to include, course outline, training schedules, course objectives for pre-startup operator training, detailed lesson plans, associated training aides, and material handouts. The A-E will submit lesson plans to the Installation for review eight weeks prior to the commencement of training. Lesson plans will be developed concurrently and submitted with the draft operations manual for review. The training will be generally based on the draft operations manual. The A-E will ensure all training materials are obtained and delivered to the Installation prior to commencement of training. All training at the Installation shall be duplicated so that maintenance personnel and operations personnel can attend in shifts. The Construction Phase Services will be concurrent with construction duration of the project. The Period of Performance for this Task Order is twenty-four (24) Months from Date of Award. This notice is NOT a request for competitive proposals. All responsible sources may submit a capability statement, which shall be considered by the agency. Capability statements must be received by the response date and time of this notice. Submissions will be reviewed to determine if they can meet the requirement. A determination by the Government to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. The approved Justification and Approval, (J&A) for this procurement will be posted following the closure of this Notice.

More opportunities from Department Of Defense → W2SD Endist Baltimore

Same awarding agency

NAICS: 531120
New
Federal
U.S. Corps Marine Career Center- Huntington, WV
Solicitation # W912QR-27-Huntington-WV
The Baltimore District of the U.S. Army Corps of Engineers is soliciting lease proposals for approximately 1,271 usable square feet of commercial retail space for the U.S. Corps Marine Career Center. The desired location is within a one-mile radius of 901 4th Avenue, Huntington, West Virginia. Requirements for the space include a secondary egress and adequate parking for two government vehicles for both day and overnight use. Proposals must include the proposed rental amount, encompassing common area maintenance, taxes, and insurance, and are due by 5:00 pm on October 30, 2026. The selected lessor will be responsible for initial alterations, including the removal of abandoned cabling and fixtures, and must ensure the premises comply with the Architectural Barriers Act Accessibility Standard and applicable life safety codes such as NFPA 101 or the International Building Code. The lessor is required to maintain public liability and property damage insurance with a combined limit of at least 1,000,000 dollars, as well as fire and extended coverage insurance for the full replacement value of the building. Acceptance of the space is contingent upon a final inspection and the issuance of a valid Certificate of Occupancy. All prospective contractors must be registered in the System for Award Management with a Unique Entity Identifier and a notarized letter appointing an authorized Entity Administrator to ensure eligibility for award and electronic funds transfer payments.
Lessors of Nonresidential Buildings (except Miniwarehouses)

POSTED

6 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS