Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

NSF-61 Certified Hardware and Sealant Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves the supply of potable-water-safe hardware and chemical compounds for prime contractors working on Santa Clara Valley Water District pumping plant projects. The scope of work requires the delivery of certified materials to the repair shop, specifically focusing on NSF-61 approved anti-seize, RTV silicone sealant, and thread-locking compounds. Additionally, the provider must supply 80 durometer EPDM rubber gaskets and high-strength hardware consisting of Grade 8 SAE or Grade 10.9 Metric standards. All chemical compounds provided under this agreement must maintain strict NSF-61 Certification to ensure safety for potable water systems. The solicitation was posted on November 2, 2026, with a response deadline set for December 8, 2026. This procurement falls under NAICS code 332722 and is managed by Valley Water in California.

General Info

Supply of NSF-61 certified chemicals and high-strength hardware for Valley Water projects.

Documents

This scope was carved out of VW0725.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Pacheco Pumping Plant Pump 12 Rebuild

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District (Valley Water)
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies potable-water-safe hardware and chemical compounds for prime contractors on Valley Water pumping plant projects. Provides NSF-61 approved anti-seize, RTV silicone sealant, thread-locking compounds, Grade 8 (SAE) or Grade 10.9 (Metric) hardware, and 80 durometer EPDM rubber gaskets. All compounds must hold NSF-61 Certification. Delivers certified materials to the repair shop.

Similar Contracts

Same NAICS industry code

More opportunities from California → Santa Clara Valley Water District (Valley Water)

Same awarding agency

NAICS: 237110
New
SLED
Pacheco Pumping Plant Pump 12 Rebuild
Solicitation # VW0725
Solicitation VW0725 is an invitation to bid for the Santa Clara Valley Water District to rebuild Pump 12 and a 24-inch cone valve at the Pacheco Pumping Plant in Merced County, California. The scope of work requires the contractor to provide all labor, materials, and equipment to document, remove, transport, disassemble, inspect, rebuild, reinstall, and test a 24-inch, three-stage vertical turbine pump driven by a 2,000 HP motor. The project must be completed within 170 days, including the submission of as-built reports and successful acceptance testing. Key requirements include maintaining OEM tolerances, implementing flood prevention strategies, and ensuring the rebuilt assemblies fit existing infrastructure without modifications. A third party hired by the contractor must perform start-up, commissioning, hydraulic performance, and vibration testing, while Valley Water provides crane operations and electrical disconnections. The contract will be awarded to the lowest responsive and responsible bidder based on the Base Bid Amount, with a five percent preference for Local Business Enterprises and a thirty percent minimum participation goal for the Small Business Outreach Program. Bidders must submit a Contractor Safety Qualification Packet as a condition of award and provide a two-year materials and workmanship warranty upon completion. Compliance with California Public Works laws is mandatory, including the payment of prevailing wages and adherence to apprentice employment regulations. Required submittals include a bid bond of at least 10 percent of the proposal amount, and for contracts exceeding 25,000 dollars, performance and payment bonds equal to 100 percent of the bid price. All bids must be submitted electronically via the PlanetBids portal by December 8, 2026.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS