Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Alabama was posted on July 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nuisance Abatement - Demolition Of Structures - 2859 Ralston Road, Mobile, Alabama 36606

Closed
ME-138-23State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

1 day ago

DEADLINE

in 20 days
NAICS: 221320
New
SLED
RFB-758-2700000186-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB-758-2700000186-1
Solicitation RFB-758-2700000186-1 is a request for bids issued by the Kentucky Department of Military Affairs to secure a contractor for comprehensive water and wastewater operations, maintenance, monitoring, and repair services at Bluegrass Station. The scope of work encompasses the wastewater treatment and collection systems, the stormwater system, and the drinking water distribution system. The selected contractor will be responsible for providing all management, labor, equipment, and administrative support, including specialized electrical services for pumps and motors, laboratory coordination, and emergency response. The contract is structured with an initial one-year term and includes the option for four additional two-year extensions. The award will be determined using a Best Value Ranking Approach, where price accounts for 90 points and business experience accounts for 10 points, with a minimum requirement of three years in business. Bidders must provide documentation of their business history and hold current Kentucky Class II certifications for both Wastewater Operator and Collection System Operator roles. Mandatory requirements include minimum insurance coverage of 1,000,000 dollars for both automobile and professional liability, compliance with the Equal Employment Opportunity Act of 1978, and adherence to Section 504 of the Rehabilitation Act of 1973. All bids must be submitted electronically via the Vendor Self Service portal by November 16, 2026.
Department of Military Affairs

POSTED

2 days ago

DEADLINE

in 18 days
NAICS: 221320
Federal
Operations and Maintenance (O&M) Services for the SBIWTP
Solicitation # 191BWC26R0009
Solicitation 191BWC26R0009, issued by the International Boundary and Water Commission, seeks a contractor to provide Firm Fixed Price Operations and Maintenance (O&M) services for the South Bay International Wastewater Treatment Plant (SBIWTP) in San Ysidro, California. The contract is structured with a base year running from June 1, 2027, to May 31, 2028, and multiple option years extending through May 2031. A primary objective of the scope is managing plant operations, SCADA systems, and maintenance during the facility's expansion from 25 MGD to 50 MGD. The contractor must ensure 24/7 staffing, including a bilingual operator, and maintain strict compliance with the National Pollutant Discharge Elimination System (NPDES) permit and other regional water quality board regulations. Award will be based on the Highest Technically Rated with a Fair and Reasonable Price method, where non-price factors—such as plant operations, permit compliance, and staffing—are significantly more important than cost. Key requirements include the designation of a Project Manager, Superintendent, Site Safety and Health Officer, SCADA Specialist, and Asset Manager. The contractor is responsible for a wide array of deliverables, including a Phase-In Plan, Preventative Maintenance Plan, and monthly performance reports. Security is a high priority, requiring background investigations for personnel and adherence to NIST standards for protecting Controlled Unclassified Information. Performance will be monitored via a Quality Assurance Surveillance Plan focusing on regulatory compliance, uptime, and effluent quality.
Internat Boundary And Water Commission

POSTED

9 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The contract involves a comprehensive wet demolition of all structures at the specified address in Mobile, Alabama, including removal of footings, slabs, and other related elements, with field verification required. The contractor is responsible for disconnecting and properly capping utility lines such as sewer, water, and gas in accordance with local agency and city standards. Additionally, the contractor must clear the site of all debris resulting from demolition activities, including scattered materials and designated piles. Special attention is required for implementing sediment and erosion control measures, as well as adhering to best management practices during demolition, especially when potential presence of lead-based paint or asbestos-containing materials is suspected. Post-demolition, the contractor must submit photographic documentation before and after the work, along with waste shipment records, invoices, and other close-out documentation to the City of Mobile’s Municipal Enforcement Department. The project is solicited under the title "Nuisance Abatement - Demolition Of Structures" with a response deadline of July 17, 2024. It falls within the NAICS code 221320 and is managed by the Mobile Municipal Enforcement agency. The contract value is estimated to range between $20,000 and $50,000. Interested parties can find additional details and submit responses through the city’s bidding portal. The scope emphasizes compliance with environmental and safety regulations, proper disposal of debris, and thorough documentation throughout the demolition process.

General Info

Agency

Alabama → Mobile Municipal Enforcement

Place of Performance

AL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAlabama → Mobile Municipal Enforcement
ContactsNo contacts available
OfficeN/A
Organization / Agency
Alabama → Mobile Municipal Enforcement
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of Work: Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department.  Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites.  Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS