Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Oak Avenue Utilities Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Oak Avenue Utilities Rehabilitation Project, managed by the City of St. Helena Public Works Department in Napa County, California, involves the replacement of water, sanitary sewer, and storm drain facilities along Oak Avenue from Madrona Avenue to Mitchell Drive. The scope of work includes upgrading the existing outfall structure at Sulphur Creek to accommodate the new storm drain system, as well as performing minor trenching, excavation, and backfilling. All infrastructure will be replaced within previously disturbed areas, and all affected surfaces will be restored to their pre-project condition. This project is classified under NAICS code 237110 and is currently listed as a forecast with a posted date of October 9, 2025. The City of St. Helena has issued a Notice of Exemption under CEQA, citing statutory and categorical exemptions for the replacement of existing facilities and minor land alterations, confirming that the project will not cause significant environmental effects. Project administration is led by the St. Helena Public Works Department, with Mario Traverso serving as the Project Manager and Joe Leach as the Director.

General Info

City of St. Helena to rehabilitate utilities along Oak Avenue with CEQA exemptions, no bid details yet.

Agency

California → City of St. Helena

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Oak Avenue, between Madrona Avenue and Mitchell Drive., CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Oak Avenue Utilities Rehabilitation Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of St. Helena
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of St. Helena
Office AddressN/A
Contacts
Mario TraversoProject Manager

Full Description

Show more
The Oak Avenue Utilities Rehabilitation Project will replace the water, sanitary sewer, and storm drain facilities in Oak Avenue, from Madrona Avenue to Mitchell Drive, in the City of St. Helena. The project also includes replacing and upgrading the existing outfall structure at Sulphur Creek to accommodate the new storm drain.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is seeking subcontractor and supplier quotes for various trades, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel fittings. All subcontractors are required to utilize union labor and must be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, providing their bond rate at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT, and should be directed to Alyssa Callaway. This solicitation is open to DBE, MBE, WBE, and SBE set-asides under NAICS code 237110.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids for a green-street retrofit project located on South Marsham Street between Gravel Lane and US Route 50 in Downtown Romney, West Virginia. The scope of work involves the targeted retrofit of approximately 343.59 linear feet of roadway to implement green infrastructure. Key deliverables include the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the planting of six native trees and approximately 345 native plants or approved equivalents. The project is designed to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area and requires necessary drainage, underdrain, inlet, pipe, and downspout work, as well as ADA-compliant curb, sidewalk, apron, crossing, and traffic-calming improvements. This solicitation specifically seeks MBE, DBE, and WBE subcontractors and suppliers, with a strong emphasis on small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, small businesses are encouraged to form consortiums. Bids must be submitted by September 17, 2026, at 4:00 P.M. Primary points of contact for this opportunity are Jennifer Wilson and Jonah Leith. The project concludes with final stabilization, cleanup, and restoration of the site.
Harbel, Inc.

POSTED

about 4 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves of various diameters, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified entities, with a bid response deadline of September 29, 2026. James W. Fowler Co. is actively encouraging M/W/DBE participation and offering support for bonding, insurance, and material procurement to qualified subcontractors.
James W. Fowler Co.

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS