This Solicitation opportunity from Ohio was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ODNR, DOGRM Central Office Lighting & Ceiling Grid Modification Reposted

Closed
SRC0000039257State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to protect against salt air and moisture. The installation includes two new NEMA 3R automatic transfer switches, securing the units to the existing concrete slab with Grade 5 or higher galvanized anchor bolts, and performing comprehensive generator load tests. The project is estimated to have a magnitude between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. The contract is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) IDIQ. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates technical understanding, a sound implementation approach, and a robust safety and quality control program. Key compliance requirements include adherence to the Buy American Act, Davis-Bacon prevailing wage rates per determination PR20260001, and strict security protocols, including PIV card issuance and non-disclosure agreements for personnel. All work must be performed during regular business hours, Monday through Friday, and must comply with NFPA 70, the International Building Code, and NEC Article 445.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The LED Lighting and Occupancy Sensor Upgrade project is a Firm-Fixed-Price task order issued under an 8(a) Multiple Award Construction Contract (MACC) for the Buffalo Federal Detention Facility in Batavia, New York. The project involves providing all engineering, labor, equipment, and materials to upgrade the facility with energy-efficient LED lighting fixtures and occupancy sensors, including the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated magnitude of the contract is between 2 million and 2.3 million dollars, with a period of performance of 180 calendar days from the notice to proceed. Award will be based solely on the lowest total evaluated price. The contractor is required to adhere to Davis-Bacon Act wage determinations and comply with standards from OSHA, ADA, NFPA, and the International Building Code. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package consisting of as-built drawings, warranty documentation, and 5 percent attic stock. The contractor must also provide a minimum two-hour training session for facility maintenance personnel and a detailed commissioning report verifying that 100 percent of fixtures and controls were tested. Payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves a Firm-Fixed-Price task order under an 8(a) Multiple Award Construction Contract for the provision and installation of two 40ft steel FLEXTAINER conex offices for forensics personnel at the St. Thomas HSI Facility in the US Virgin Islands. The scope of work includes the construction of 3k PSI reinforced concrete slabs, installation of the units, and equipping each office with two split-system A/C units, R-11 insulation, vinyl flooring, LED lighting, and a steel door with a Cypher lock. Each unit must also include four security windows and a 5-pound ABC fire extinguisher. Electrical connectivity must be established via 2-inch PVC or uPVC conduit to the nearest circuit. The contract has an estimated magnitude between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. Award will be based on the lowest total evaluated price, considering technical approach, safety, and quality control plans. Key requirements include compliance with the Buy American Act, adherence to Davis-Bacon prevailing wage rates for the Virgin Islands, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training. Contractors must conduct a site survey prior to proposal submission and provide a detailed project schedule within 15 days of the Notice to Proceed. All invoicing must be processed through the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work includes the installation of manual pull stations, horn/strobe notification appliances, and the replacement of six existing fire alarm bells with new horn/strobe units. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following a written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by 3:00 pm PT on September 16, 2026. Submissions must include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, a completed MTC Supplier Packet (W-9, self-certification, and terms acceptance), and proof of insurance. For bids equal to or greater than $25,000, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds totaling 100% of the contract price. The contract is subject to Construction Wage Rate Requirements (CWRR), requiring compliance with California prevailing wage determinations and the submission of weekly certified payroll. Award will be based on overall best value.
Inland Empire Job Corps

POSTED

about 5 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for lighting and ceiling grid modification services at its central office located in Ohio. The solicitation, numbered SRC0000039257, was posted on May 12, 2026, with a response deadline of May 29, 2026, at 7:00 PM Eastern Time. This procurement is targeted toward commercial and office building renovation services, specifically focused on upgrading interior lighting systems and replacing or repairing ceiling grid infrastructure to meet current operational and safety standards. The contract falls under a state-level government procurement with no specific set-aside designation noted, and the place of performance is confined to Ohio. Interested parties must submit responses through the official Ohio procurement portal prior to the deadline, though no point of contact information is provided within the solicitation data. All work is expected to comply with state facility maintenance guidelines and be performed in a manner that minimizes disruption to ongoing agency operations.

General Info

Ohio state contract for lighting and ceiling grid upgrades at central office, bid due May 29, 2026.

Agency

Ohio → Dnr900200 Oil And Gas DnrfraView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

OH, USA

Set-Aside

NONE

Documents

(5)

Ceiling_Tile___Grids_Specifications.docx

DOCX

Central_Office_Lighting___Ceiling_Grid_Modification.docx

DOCX

Services_Agreement__Non-Federal_Funds__Base_Template_Rev._2025_11_28_NO_GUIDANCE.docx

DOCX

Switch_Setup.pdf

PDF

Central_Office_Blank_Drawings.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → Dnr900200 Oil And Gas Dnrfra
ContactsNo contacts available
OfficeN/A
Organization / Agency
Ohio → Dnr900200 Oil And Gas Dnrfra
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
REQUEST FOR QUOTEThe Ohio Department of Natural Resources, Division of Oil & Gas Resources Management is accepting bid for the installation of new LED, dimmable lighting and installation of new 2x2 ceiling grid and tile for the 1st and 3rd floor of the Central Office location in Columbus, Ohio.*** Prevailing Wage May Apply – Please refer to Prevailing Wage Statement ***Name of Project: ODNR, DOGRM Central Office Lighting & Ceiling Grid ModificationOrdering Division and address:Division of Oil & Gas Resources Management2045 Morse Road, Building FColumbus, Ohio 43229Specifications:Lighting:Division would like lighting to match new lighting that was installed during the recent 2nd floor installation approved manufacturer(s) listed below. The fixtures range from 2x2, 2x4 and a few circular recess lights. Contractor would be responsible for installing new lighting and light switches through 1st and 3rd floors. Any programing of light switches or lighting as required. Light should have the ability to have wattage and kelvin be selectable. Below is an estimated number of light fixtures to be replaced. Final numbers are the responsibility of the bidder. Current/ requested setup of switches is attached in drawing attached named “Switch Setup”.First Floor:2x2- 132x4- 95Circular Recessed – 2Third Floor:2x2- 352x4- 185Luminaire Schedule:Ceiling Grid:Bidder will be responsible for removal of old ceiling grid and tiles. Bidder will install new ceiling grid lowering grid ½” to 1” to drop ceiling grid from sitting on top wallBidder is responsible for all actual measurements, but estimated building measurement is 68’ W x 148’ L. A general building layout for the two floors is attached to the documents of this solicitation for reference.Material reference and requirements along with installation instructions are attached in “Ceiling Tile & Grids Specifications”Bidder will be responsible for removing and disposing of all old materials offsite. Bidder will be able to place a dumpster on site with coordinator of ODNR General Services Team. Bidder should submit materials list with bid as attachment in OhioBuys.Work will be completed and scheduled with Division staff and will be completed during normal business hours. Work schedule will be agreed upon mutually in advance. Work will be scheduled and completed within 90 days from issuance of PO.All bids must be submitted through OhioBuys and any bids submitted outside of OhioBuys will not be accepted.Prevailing Wage: All current wage rates apply for Franklin County, Ohio. View Previewing Wage Rates at https://com.ohio.gov/divisions-and-programs/industrial-compliance/wage-and-hour/guides-and-resources/view-prevailing-wage-rates. Ohio Department of Commerce, Division of Labor and Worker Safety, Wage and Hour Bureau has identified that work in this solicitation and to be performed under contract may be subject to the requirements of Ohio Revised Code Sections 4115.03 to 4115.16, Prevailing Wage. Upon award of a Contract, the successful Contractor, and all of the sub-contractors, guarantees that the prevailing wage for the area, to include any adjustments thereto, as published by the Ohio Department of Commerce, Division of Labor and Worker Safety, Wage and Hour Bureau will apply to any workman assigned by the Contractor or all of the sub-contractors to this project. The DNR representative will serve as prevailing wage coordinator and will be responsible for proper application of labor rates as required by the Ohio Department of Commerce. Responsibilities of the Prevailing Wage Coordinator include, but are not limited to; setting up and maintaining payroll reports, monitoring when payments of wages are made, receiving the Contractor’s complete payroll records of each employee, establish procedures to monitor compliance, notify Contractor of any adjustment to the prevailing wage scales and report delinquencies on the part of the Contractor. The successful supplier and all of the sub-contractors shall strictly comply with the wage provisions of the contract. Site Visit Information:Site visits are available by appointment only Monday through Friday. 8:30am to 4pm. Visits are available May 13th – May 22nd 2026. A minimum of 24 hours is requested to provide time to notify security and ensure that someone is available to accompany you through building. Any questions asked during site walk will be tracked and posted in OhioBuys for all other bidders to review. Inquiry window will correspond with availability to schedule site visits.To schedule an appointment, contact: Division of Oil & GasDoug CunninghamDouglas.Cunningham@dnr.ohio.gov 614-265-6922Once a contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.F.O.B. DESTINATION/PRE-PAID/ALLOWED. The Contractor must provide Deliverables under this Contract F.O.B. Destination/Pre-Paid/Allowed. The place of destination will be specified by the Ordering Agency on the agency’s purchase order or other ordering document. Cost of the freight must be borne and paid by the Contractor unless otherwise stated.All risk of loss, regardless of the cause, will remain with the Contractor until title to the Deliverable passes to the State. Unless otherwise provided in this Contract, the State will determine whether the Contractor provided each Deliverable required in this Contract and has fully met all work requirements of this Contract. Title to any Deliverables will pass to the State on Acceptance of the Deliverable.Evaluation: The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. All Proposals must be submitted through Ohio Buys. Proposals received outside of Ohio Buys will not be considered.Contract Award:The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Evaluation: The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. All Proposals must be submitted through Ohio Buys. Proposals received outside of Ohio Buys will not be considered.Contract Award:The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Commercial and office building renovation and repair service
Items I1_000001 | Required Item | Lighting | Estimated usage: 1.00000 | Unit: AMT I1_000002 | Required Item | Ceiling Grid | Estimated usage: 1.00000 | Unit: AMT
Inquiries Inquiry 89018 | Can you pleae tell me if this is the same project?Attachment one posted today and attachment two on 5/11. If it is the same project, have the documents changed? Why was it re-posted under a different solicitation ID#?What are the changes? | Answer: Thank you for your inquiry. Please refer to documents posted in SRC0000039257 as the most recent. Additional information regarding prevailing wages was added to the scope.This inquiry will be posted to the solicitation. | Answered: 5/13/2026 Inquiry 89544 | Can you provide a drawing showing which ceilings on the first and third floors get replaced? There appears to be some ceilings that have already been replaced and upgraded. We want to verify for certain if these would replace also. How much of each floors ceilings can be replaced at a time? Do the switch covers stay white to match the existing or do they go stainless to match the second floor. Who is responsible for the moving of the loose furnishings? Will there be ample space to store them on the same floor? | Answer: Can you provide a drawing showing which ceilings on the first and third floors get replaced? There appears to be some ceilings that have already been replaced and upgraded. We want to verify for certain if these would replace also. – The lobby and kitchenette on the first floor have been replaced and the kitchenette on the third floor. See attached.Central Office - Ceiling Finished Already.pdfHow much of each floors ceilings can be replaced at a time? – 1/3 to ½ of the floor can be replaced at a time. During the construction/scheduling meeting after contracting planning can be worked work out. Do the switch covers stay white to match the existing or do they go stainless to match the second floor. – Switch covers should match what is currently existing to match rest of outlets in offices and room.Who is responsible for the moving of the loose furnishings? Will there be ample space to store them on the same floor? – staff will be responsible for moving all items except desks. | Answered: 5/20/2026 Inquiry 89834 | Is the work for the above project to be completed during normal working hours? Please advise. Thank you! | Answer: Question: Is the work for the above project to be completed during normal working hours? Please advise. Thank you!Answer:Yes it will need to be completed during working hours. | Answered: 5/26/2026

More opportunities from Ohio → Dnr900200 Oil And Gas Dnrfra

Same awarding agency

NAICS: 237990
New
SLED
ODNR, Division of Oil & Gas – OWP – Federal Project – Washington 23F - 35 Wells AMENDMENT 1
Solicitation # SRC0000041612
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for the Washington 23F Project to plug and plate 35 orphan wells in Aurelius Township, Washington County. This federally funded project involves mobilization, well site development, cleaning out and plugging of wells, decommissioning and disposal of equipment, and full site restoration. The contract will be awarded to the lowest responsive and responsible bidder who is active on State Contract CSP900922 (DAS Index No. MAC110), has attended the mandatory pre-bid meeting, and maintains a good standing with the agency. Key operational requirements include compliance with the Davis-Bacon Act for wages and payroll reporting, OSHA safety standards, and ODOT Construction and Material Specifications. The project also mandates adherence to Buy America sourcing requirements for construction materials, with specific exemptions for cement and aggregates. Per Amendment 1, work must commence within 12 months of the contract end, and a seasonal work restriction is in place for sites owned by David Kuhns from October 1st through January 31st. All offers must be submitted via OhioBuys by 12:00 PM on September 24, 2026, and must include acknowledgment of the amendment to be considered responsive.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS