This Solicitation opportunity from Ohio was posted on May 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ODNR, DOGRM Central Office Lighting & Ceiling Grid Modification Reposted
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Ohio Department of Natural Resources, Division of Oil and Gas Resources Management, is soliciting bids for lighting and ceiling grid modification services at its central office located in Ohio. The solicitation, numbered SRC0000039257, was posted on May 12, 2026, with a response deadline of May 29, 2026, at 7:00 PM Eastern Time. This procurement is targeted toward commercial and office building renovation services, specifically focused on upgrading interior lighting systems and replacing or repairing ceiling grid infrastructure to meet current operational and safety standards. The contract falls under a state-level government procurement with no specific set-aside designation noted, and the place of performance is confined to Ohio. Interested parties must submit responses through the official Ohio procurement portal prior to the deadline, though no point of contact information is provided within the solicitation data. All work is expected to comply with state facility maintenance guidelines and be performed in a manner that minimizes disruption to ongoing agency operations.
General Info
Agency
NAICS
Place of Performance
OH, USASet-Aside
Documents
(5)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Evaluation: The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. All Proposals must be submitted through Ohio Buys. Proposals received outside of Ohio Buys will not be considered.Contract Award:The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive.
Commercial and office building renovation and repair service
Items I1_000001 | Required Item | Lighting | Estimated usage: 1.00000 | Unit: AMT I1_000002 | Required Item | Ceiling Grid | Estimated usage: 1.00000 | Unit: AMT
Inquiries Inquiry 89018 | Can you pleae tell me if this is the same project?Attachment one posted today and attachment two on 5/11. If it is the same project, have the documents changed? Why was it re-posted under a different solicitation ID#?What are the changes? | Answer: Thank you for your inquiry. Please refer to documents posted in SRC0000039257 as the most recent. Additional information regarding prevailing wages was added to the scope.This inquiry will be posted to the solicitation. | Answered: 5/13/2026 Inquiry 89544 | Can you provide a drawing showing which ceilings on the first and third floors get replaced? There appears to be some ceilings that have already been replaced and upgraded. We want to verify for certain if these would replace also. How much of each floors ceilings can be replaced at a time? Do the switch covers stay white to match the existing or do they go stainless to match the second floor. Who is responsible for the moving of the loose furnishings? Will there be ample space to store them on the same floor? | Answer: Can you provide a drawing showing which ceilings on the first and third floors get replaced? There appears to be some ceilings that have already been replaced and upgraded. We want to verify for certain if these would replace also. – The lobby and kitchenette on the first floor have been replaced and the kitchenette on the third floor. See attached.Central Office - Ceiling Finished Already.pdfHow much of each floors ceilings can be replaced at a time? – 1/3 to ½ of the floor can be replaced at a time. During the construction/scheduling meeting after contracting planning can be worked work out. Do the switch covers stay white to match the existing or do they go stainless to match the second floor. – Switch covers should match what is currently existing to match rest of outlets in offices and room.Who is responsible for the moving of the loose furnishings? Will there be ample space to store them on the same floor? – staff will be responsible for moving all items except desks. | Answered: 5/20/2026 Inquiry 89834 | Is the work for the above project to be completed during normal working hours? Please advise. Thank you! | Answer: Question: Is the work for the above project to be completed during normal working hours? Please advise. Thank you!Answer:Yes it will need to be completed during working hours. | Answered: 5/26/2026
More opportunities from Ohio → Dnr900200 Oil And Gas Dnrfra
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
