Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Onward Homes Society - Invitation to Bid - Suite Renovations: 30 Units at Murdoch Manor

Closed
AB-2026-03749Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236118
New
Federal
KHC Old Housing RenovationThe solicitation 75H71026Q00127 for the KHC Old Housing Renovation project, issued by the Navajo Area Indian Health Service under the Department of Health and Human Services, is a Total Small Business Set-Aside with a NAICS code of 236118, targeting qualified small businesses for the renovation of four modular homes located in Kayenta, Arizona. The homes, originally built in 1978 and utilizing propane systems, include three 1680 sq ft, three-bedroom, two-bathroom units and one 2160 sq ft, four-bedroom, two-bathroom unit, all requiring comprehensive interior and exterior upgrades. Key deliverables encompass full HVAC replacement with new propane furnaces and split AC systems, replacement of baseboards, subflooring, vent panels, cabinetry, sinks, faucets, shower and toilet fixtures, and proper debris disposal at EPA-approved locations. Work must comply with housing codes and industry best practices, with finished results required to be pristine and professional, while maintaining strict contamination controls to ensure uninterrupted patient care and operational integrity of the surrounding health facility. All contractors must implement measures to seal HVAC vents, cover exhaust systems, and protect fire safety equipment from damage or accidental activation. The solicitation was reopened on June 12, 2026, with a final response deadline extended to July 7, 2026, at 4:00 PM MDT, following a site visit scheduled for June 30, 2026, from 9:00 AM to 3:00 PM MST. Offerors must be registered in SAM, maintain current UEI and CAGE codes, and provide certifications including compliance with Buy American provisions, Drug-Free Workplace requirements, and Indian Economic Enterprise representations as mandated by HHSAR clause 352.226-7. The contract will be awarded to the offeror whose proposal is most advantageous to the government, considering cost/price, technical capability, personnel qualifications, and past performance, with option prices included in evaluation but not binding. Performance is expected from August 1, 2026, through July 31, 2027, with all work performed at the Kayenta site under FOB destination terms. Contractors must submit payment requests electronically through the Treasury’s Invoice Processing Platform, obtain ID badges prior to onsite work, and adhere to stringent safety protocols including PPE use, electrical isolation
Navajo Area Indian Health Svc

POSTED

about 6 hours ago

DEADLINE

in 2 days
NAICS: 236118
New
SLED
Utah Tech - Chancellor Student Housing Remodel - Phase 1Utah Tech University is conducting a two-stage procurement process for the renovation of a three-story, 6,852-square-foot student housing building located at 11 South 800 East in St. George, Utah. Originally constructed in 1995, the building will be reconfigured from six three-bedroom apartments into ten one-bedroom apartments and one two-bedroom apartment, with associated interior and exterior improvements including demolition, new partitioning, HVAC mini-split installations, a new fire sprinkler and riser system, electrical upgrades, plumbing enhancements, stucco painting, and conversion of the manager’s office into a shared laundry facility. Site improvements such as stairs, ramps, sidewalks, curbing, HVAC pads, utility connections, and fire line upgrades are also included. This solicitation, identified as Phase 1 under solicitation number 26-0624, is a Request for Pre-Qualifications (RFPQ) designed to identify qualified general contractors with the experience, capacity, and safety record to proceed to a subsequent competitive sealed bidding phase. Contractors must hold a current Utah General Contractor License and submit four PDF files detailing their executive summary, company experience, references, and proposed schedule. Evaluation is based on a 100-point system that assesses relevant renovation experience, qualifications of key personnel, past performance, safety record and EMR, financial capacity, and ability to meet the project schedule. Only those contractors who successfully pass prequalification and receive an invitation via U3P will be eligible to participate in Stage Two, the Invitation for Bids, where the award will be made to the lowest responsive and responsible bidder. The RFPQ submission deadline is July 22, 2026, at 5:00 PM MST, with qualified contractors expected to be announced on July 27, 2026. Construction is slated to begin in Fall 2026 with substantial completion required by January 2027. Although the project has an estimated budget range of $700,000, no contract value or pricing details are included in this phase, as all terms related to award, execution, invoicing, payment, and performance requirements will be defined in the subsequent Invitation for Bids and final contract documents. Publicly available materials include a project rendering and general description, while complete construction drawings, specifications, bid forms, and addenda will be restricted to contractors advancing to Stage Two. The university reserves the right to reject any submissions, request
Utah

POSTED

about 24 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

Onward Homes Society is inviting qualified general contractors to undertake the interior renovation of 30 vacant units at Murdoch Manor, a 360-unit senior living complex in Alberta originally built in 1973. This project is part of Phase 3 of a broader revitalization initiative, following the successful remediation of 80 units out of 140 previously abandoned. With over 250 units currently occupied, all work must be conducted with strict regard for resident safety, noise minimization, and site cleanliness. The scope includes full-floor replacement with 3 mm to 5 mm thick Luxury Vinyl Plank installed via full-spread glue-down only, two-coat painting with specified finishes for walls, ceilings, and trim, and HEPA vacuum dust control during surface preparation. Kitchen upgrades require wood-toned laminate cabinetry matching original dimensions with soft-close hardware, while bathrooms must feature dedicated water shut-off valves, white acrylic tubs, Comfort Height low-flow toilets, and heavy-duty chrome grab bars. Electrical work must include Decora-style white switches and flush-mount LED fixtures, and all windows are to be fitted with 2-inch cordless faux-wood blinds. Contractors must hold COR or SECOR certification, provide a 10% bid bond and 50% performance and labor/material payment bonds, carry at least $5 million in general liability insurance, and possess a valid WCB Alberta Clearance Letter. A minimum of three years’ experience completing 30 or more similar unit renovations is mandatory, along with a permanent, non-working site supervisor present daily. A mandatory site visit is required before submission, and contractors are fully responsible for securing municipal permits and coordinating plumbing shut-offs 72 hours in advance. All submissions must be emailed to tender@onwardhomes.ca with the exact subject line and include a signed Bid Contract Form, Schedule A, insurance and bonding documents, a detailed weekly Gantt chart, a Resident Conduct Plan, and professional references from comparable multi-family projects. Late, incomplete, or improperly formatted bids will be automatically disqualified, with the deadline for submissions set at 3:00 PM on June 10, 2026.

General Info

Renovate 30 senior living units with vinyl plank, cabinetry, plumbing, electrical, and strict safety, bonding, and experience requirements.

Agency

Government of Canada → Onward Homes Society

NAICS

236118 - Residential Remodelers View NAICS

Place of Performance

Alberta, CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Onward Homes Society
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Onward Homes Society
Office AddressN/A
Contacts
Hasan SultanContracting Authority

Full Description

Show more
Nature and Scope of the Opportunity The objective of this project is the comprehensive interior renovation of 30 vacant units located within Murdoch Manor. This initiative represents Phase 3 of a large-scale recovery effort for the property. Murdoch Manor is a high-density senior living complex originally constructed in 1973, comprising 360 units in total. Upon assuming management in April 2025, 140 units were identified as abandoned, and to date, 80 units have been successfully remediated and returned to service. This is an active residence with over 250 units currently occupied, necessitating high standards of site cleanliness and professional behavior. Description of Procurement and Options Onward Homes Society is seeking general contracting services to modernize units characterized by aging fixtures, damaged flooring, and original 1970s cabinetry. According to Section 2: Detailed Technical Specifications, the scope of work includes the installation of high-traffic Luxury Vinyl Plank (LVP) flooring with a thickness between 3 mm and 5 mm, utilizing a full-spread glue-down method; floating or click-lock systems are not accepted. Painting requirements specify two full coats of white finish for all surfaces, including eggshell for walls, flat for ceilings, and semi-gloss for trim. Contractors must use HEPA vacuum dust extraction for all sanding during preparation. Kitchen upgrades involve replacing cabinetry with wood-toned finishes such as Oak, Maple, or Walnut laminate that match original dimensions and feature professional-grade soft-close hardware. Bathroom renovations include the installation of dedicated main water shut-off valves for unit isolation, white acrylic bathtubs, "Comfort Height" low-flow toilets, and heavy-duty chrome grab bars. Electrical specifications call for "Decora" style white plates and switches, alongside flush-mount LED disks. Window treatments consist of 2" cordless faux-wood horizontal blinds. Submission and Participation Instructions As detailed in Section 3: Mandatory Contractor Qualifications, bidders must provide a 10% Bid Bond and 50% Performance and Labor/Material Payment Bonds. Requirements also include minimum $5,000,000 General Liability Insurance, a current WCB Alberta Clearance Letter, and COR or SECOR Certification. Contractors must demonstrate experience with projects of a similar scale—30 or more units—within the last three years and provide a permanent, non-working Site Supervisor on-site daily. According to Section 4: General Terms & Site Management, a site visit is required to verify infrastructure and dimensions prior to bidding. The contractor is responsible for all municipal permits and must coordinate plumbing shut-offs 72 hours in advance. Work must adhere to designated quiet hours to minimize disruption to elderly residents. Final submissions must be emailed strictly to tender@onwardhomes.ca with the subject line "BID SUBMISSION: Murdoch Manor - 30 Unit Renovation - CMR ID 109095". Per Section 5: Bid Submission Format, the proposal must include a signed Bid Contract Form, Schedule A, all insurance and bonding documentation, and a weekly Gantt chart detailing the unit turnover cadence. Additionally, the submission must include a Resident Conduct Plan and contact details for professional references from multi-family projects. Failures to follow the specified format will result in immediate disqualification.