Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Operation of the GSWC-Los Osos South Bay Treatment Plant Water Supply Permit Amendment (Project)

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Water Resources Control Board is overseeing the Operation of the GSWC-Los Osos South Bay Treatment Plant Water Supply Permit Amendment project. This initiative involves operating a manganese treatment system at an existing public water utility facility located at 2082 S. Bay Blvd., Los Osos, California, in San Luis Obispo County. The primary objective is to utilize drinking water treatment devices for health protection to address water quality levels that currently exceed secondary drinking water standards. The project is categorized as a forecast under NAICS code 221320. It has been granted a Notice of Exemption under Class 1 of the California Code of Regulations, as the work occurs within existing facilities with no change in use. Key points of contact include District Engineer Jason Cunningham and Water Quality Engineer David Schultise. A domestic water supply permit amendment for the project was issued on June 8, 2026.

General Info

Approve manganese treatment system at existing well to meet California drinking water standards.

Agency

California → State Water Resources Control Board

Place of Performance

CA, 93402

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Jason CunninghamDistrict Engineer
David SchultiseWater Quality Engineer

Full Description

Show more
The Applicant proposes operating a manganese treatment system for an existing well source which is currently above the secondary drinking water standard. The treatment system was installed inside an existing well facility at a public water utility.

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Dsc Contracting Services Division

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS