Addendum No. 2 to the Facilities Master Plan Program EIR for the RP-5 Expansion Offsite Facilities Projects
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The IEUA RP-1 Project implements targeted infrastructure upgrades at the RP-1 wastewater treatment facility, building upon the long-term program of improvements evaluated in the 2017 Final Program Environmental Impact Report. Key components include replacing existing sludge thickening equipment with eight new rotary screen thickeners and two solids blending tanks housed in a new building, installing three acid phase digesters and a sulfur removal system with four iron sponge units to treat digester gas, and enhancing thermal and power systems to ensure operational reliability. A new 2,206 brake horsepower diesel emergency generator will supplement existing backup power, while a 13.9 million Btu per hour digester gas/natural gas-fired boiler will provide additional heating for the anaerobic and acid phase digesters. An odor control system featuring an aqueous scrubber and biofilter will treat foul air from multiple process areas, and three existing sodium hypochlorite storage tanks will be replaced with four larger units, though these changes do not require a permit under applicable air quality rules. These modifications align with the program-level analysis of the Final Program EIR and are being pursued under South Coast AQMD application numbers for air emissions control. The project is managed by the Inland Empire Utilities Agency as the lead agency, operating under the broader environmental review framework established by the Final Program EIR certified in March 2017, which evaluated facility-wide modernization across treatment, recycled water, groundwater recharge, and auxiliary systems. The project’s environmental and regulatory compliance oversight is coordinated through the South Coast Air Quality Management District, with point of contact for compliance and sustainability matters at IEUA and an air quality specialist at AQMD available for coordination. While the project reflects a focused subset of improvements previously examined at a programmatic level, the specific components—sludge handling, digester expansion, emergency power, heating, odor control, and chemical storage—are designed to enhance operational efficiency, reliability, and environmental performance in accordance with CEQA and air quality requirements. The project’s documentation is publicly accessible through the California Environmental Quality Act online portal under referenced project identifiers.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
