Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Addendum No. 2 to the Facilities Master Plan Program EIR for the RP-5 Expansion Offsite Facilities Projects

Forecast
648840State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The IEUA RP-1 Project implements targeted infrastructure upgrades at the RP-1 wastewater treatment facility, building upon the long-term program of improvements evaluated in the 2017 Final Program Environmental Impact Report. Key components include replacing existing sludge thickening equipment with eight new rotary screen thickeners and two solids blending tanks housed in a new building, installing three acid phase digesters and a sulfur removal system with four iron sponge units to treat digester gas, and enhancing thermal and power systems to ensure operational reliability. A new 2,206 brake horsepower diesel emergency generator will supplement existing backup power, while a 13.9 million Btu per hour digester gas/natural gas-fired boiler will provide additional heating for the anaerobic and acid phase digesters. An odor control system featuring an aqueous scrubber and biofilter will treat foul air from multiple process areas, and three existing sodium hypochlorite storage tanks will be replaced with four larger units, though these changes do not require a permit under applicable air quality rules. These modifications align with the program-level analysis of the Final Program EIR and are being pursued under South Coast AQMD application numbers for air emissions control. The project is managed by the Inland Empire Utilities Agency as the lead agency, operating under the broader environmental review framework established by the Final Program EIR certified in March 2017, which evaluated facility-wide modernization across treatment, recycled water, groundwater recharge, and auxiliary systems. The project’s environmental and regulatory compliance oversight is coordinated through the South Coast Air Quality Management District, with point of contact for compliance and sustainability matters at IEUA and an air quality specialist at AQMD available for coordination. While the project reflects a focused subset of improvements previously examined at a programmatic level, the specific components—sludge handling, digester expansion, emergency power, heating, odor control, and chemical storage—are designed to enhance operational efficiency, reliability, and environmental performance in accordance with CEQA and air quality requirements. The project’s documentation is publicly accessible through the California Environmental Quality Act online portal under referenced project identifiers.

General Info

IEUA upgrades RP-1 plant with new sludge equipment, digesters, power, boiler, odor control, and chemical tanks.

Agency

California → Inland Empire Utilities Agency

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Inland Empire Utilities Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Inland Empire Utilities Agency
Office AddressN/A
Contacts
Pietro CambiasoManager of Compliance and Sustainability
Sina TaghvaeeAir Quality Specialist

Full Description

Show more
IEUA, as the Lead Agency for the IEUA RP-1 Project, prepared and certified the Final Program Environmental Impact Report (Final Program EIR) for the IEUA Facilities Master Plans pursuant to the California Environmental Quality Act (CEQA) on March 15, 2017. The Final Program EIR evaluated a long-term program of infrastructure improvements intended to support IEUA’s wastewater treatment, recycled water, groundwater recharge, and utility operations. The analysis in the Final Program EIR assessed a broad range of reasonably foreseeable future projects across multiple IEUA facilities at a programmatic level and organized those projects into three categories: treatment facility upgrades, recycled water and groundwater recharge facilities, and auxiliary systems and support facilities. The Final Program EIR evaluated a range of reasonably foreseeable future upgrade projects related to the modernization, rehabilitation, and improvements of the RP-1 facility, including: 1) solids treatment and capacity upgrades, such as solids treatment rehabilitation, sludge thickening upgrades, and capacity rehabilitation; 2) digestion system improvements, including digester gas mixing, digester mixing upgrades, and digester cleaning and rehabilitation; 3) digester gas handling and treatment improvements, including flare improvements, flare system improvements, and digester gas mixing, which ensure that gas produced at RP-1 is beneficially used; 4) thermal support systems for digestion, including expansion, rehabilitation, and optimization of digestion and solids treatment systems, with upgrades to solids processing, digester operation, and supporting thermal infrastructure; 5) emergency power generation and electrical system upgrades, including enhancements to support reliable plant operations and installation, or improvement of emergency power infrastructure to maintain operations during outages or peak demand; 6) odor control improvements, including projects identified as odor control improvements and odor control improvements evaluation, which include foul air treatment systems, clarifier covers, and odor control equipment; 7) chemical handling and disinfection system improvements identified as disinfection pump improvements and liquid treatment rehabilitation projects that encompass the upgrade and expansion of RP-1 liquid treatment and disinfection systems, such as increased liquid treatment capacity to meet projected flows, modernization of disinfection pumping and dosing infrastructure, and optimization of post-filtration chlorination; and 8) other improvements, including headworks rehabilitation, clarifier rehabilitation, mixed liquor return pump improvements, electrical and heating, ventilation and air conditioning (HVAC) system upgrades, and recycled water facilities. The IEUA RP-1 Project implements a portion of the long-term modernization, rehabilitation, and capacity improvements previously analyzed for the RP-1 facility in the Final Program EIR. The project applicant seeks the following modifications to the existing Solids Thickening Facility pursuant to South Coast AQMD Application Number (A/N) 648840: 1) replacement of the existing sludge gravity thickeners, the sludge blending tank, and the dissolved air flotation thickener and its associated recirculation pump with eight new rotary screen thickeners and two solids blending tanks, which will be installed within a new building; and 2) construction of three new acid phase digesters and one sulfur removal treatment system with four iron sponge units to treat the gas produced from the acid phase digesters. The project applicant also seeks to install: 1) a new emergency diesel-fueled internal combustion engine (South Coast AQMD A/N 648201), rated at 2,206 brake horsepower, to provide supplemental backup power to the four existing emergency engines and ensure uninterrupted operation of the wastewater treatment process during electrical outages; 2) a new digester gas/natural gas-fired boiler (South Coast AQMD A/N 648202), with a rated capacity of 13.902 million British thermal units per hour, to provide additional heating capacity to the existing hot water loop system serving the seven existing anaerobic digesters and the three new acid phase digesters; and 3) a new odor control system (South Coast AQMD A/N 648203), with an operating capacity of 14,370 standard cubic feet per minute, comprised of one pre-treatment aqueous scrubber to remove ammonia from foul air and one biofilter to treat foul air from the sludge thickening building, rotary screen thickeners, sludge blending tanks, centrifuge sludge dewatering building, sludge silos, and drainage pump station. Lastly, the IEUA RP-1 Project includes replacement of three existing 10,300-gallon sodium hypochlorite storage tanks with four new 12,189-gallon sodium hypochlorite storage tanks; however, these modifications do not require a permit pursuant to South Coast AQMD Rule 219(d)(13)(U).

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
SLED
Odor and Corrosion Control
Solicitation # 2027-006-JS
The City of Sarasota is soliciting bids for Odor and Corrosion Control services to reduce wastewater odors at multiple lift station facilities. The scope of work includes the operation, maintenance, and repair of these systems, as well as responding to odor complaints within two hours and equipment failures within four hours on a 24/7 basis. Key deliverables include monthly monitoring of all sites and the implementation of a service program that records hydrogen sulfide data at least every five minutes. Bidders must be licensed Florida General Contractors and provide all necessary personnel, materials, and transportation. The contract follows a default term of three years with two optional one-year renewals, for a total potential duration of five years. Award will be granted to the lowest responsible and responsive bidder. Requirements for the contractor include providing new, standard production models of equipment, ensuring all storage tanks are properly labeled according to local, state, and federal regulations, and maintaining insurance with an A.M. Best rating of at least A Excellent. All responses must be submitted electronically as a consolidated PDF via the city's online portal by the December 3, 2026, deadline. Invoicing must include the contract number, purchase order, and Federal Employer Identification Number, with payments issued upon delivery and acceptance of goods or services.
Utilities

POSTED

5 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS