Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Addendum No. 2 to the Facilities Master Plan Program EIR for the RP-5 Expansion Offsite Facilities Projects

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The IEUA RP-1 Project implements targeted infrastructure upgrades at the RP-1 wastewater treatment facility, building upon the long-term program of improvements evaluated in the 2017 Final Program Environmental Impact Report. Key components include replacing existing sludge thickening equipment with eight new rotary screen thickeners and two solids blending tanks housed in a new building, installing three acid phase digesters and a sulfur removal system with four iron sponge units to treat digester gas, and enhancing thermal and power systems to ensure operational reliability. A new 2,206 brake horsepower diesel emergency generator will supplement existing backup power, while a 13.9 million Btu per hour digester gas/natural gas-fired boiler will provide additional heating for the anaerobic and acid phase digesters. An odor control system featuring an aqueous scrubber and biofilter will treat foul air from multiple process areas, and three existing sodium hypochlorite storage tanks will be replaced with four larger units, though these changes do not require a permit under applicable air quality rules. These modifications align with the program-level analysis of the Final Program EIR and are being pursued under South Coast AQMD application numbers for air emissions control. The project is managed by the Inland Empire Utilities Agency as the lead agency, operating under the broader environmental review framework established by the Final Program EIR certified in March 2017, which evaluated facility-wide modernization across treatment, recycled water, groundwater recharge, and auxiliary systems. The project’s environmental and regulatory compliance oversight is coordinated through the South Coast Air Quality Management District, with point of contact for compliance and sustainability matters at IEUA and an air quality specialist at AQMD available for coordination. While the project reflects a focused subset of improvements previously examined at a programmatic level, the specific components—sludge handling, digester expansion, emergency power, heating, odor control, and chemical storage—are designed to enhance operational efficiency, reliability, and environmental performance in accordance with CEQA and air quality requirements. The project’s documentation is publicly accessible through the California Environmental Quality Act online portal under referenced project identifiers.

General Info

IEUA upgrades RP-1 plant with new sludge equipment, digesters, power, boiler, odor control, and chemical tanks.

Agency

California → Inland Empire Utilities Agency

NAICS

221320 - Sewage Treatment FacilitiesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

IEUA 2017 Notice of Determination for Facilities Master Plans

PDFnotice-of-determination

IEUA RP-1 Final South Coast AQMD CEQA Notice of Determination

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Inland Empire Utilities Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Inland Empire Utilities Agency
Office AddressN/A
Contacts
Pietro CambiasoManager of Compliance and Sustainability
Sina TaghvaeeAir Quality Specialist

Full Description

Show more
IEUA, as the Lead Agency for the IEUA RP-1 Project, prepared and certified the Final Program Environmental Impact Report (Final Program EIR) for the IEUA Facilities Master Plans pursuant to the California Environmental Quality Act (CEQA) on March 15, 2017. The Final Program EIR evaluated a long-term program of infrastructure improvements intended to support IEUA’s wastewater treatment, recycled water, groundwater recharge, and utility operations. The analysis in the Final Program EIR assessed a broad range of reasonably foreseeable future projects across multiple IEUA facilities at a programmatic level and organized those projects into three categories: treatment facility upgrades, recycled water and groundwater recharge facilities, and auxiliary systems and support facilities. The Final Program EIR evaluated a range of reasonably foreseeable future upgrade projects related to the modernization, rehabilitation, and improvements of the RP-1 facility, including: 1) solids treatment and capacity upgrades, such as solids treatment rehabilitation, sludge thickening upgrades, and capacity rehabilitation; 2) digestion system improvements, including digester gas mixing, digester mixing upgrades, and digester cleaning and rehabilitation; 3) digester gas handling and treatment improvements, including flare improvements, flare system improvements, and digester gas mixing, which ensure that gas produced at RP-1 is beneficially used; 4) thermal support systems for digestion, including expansion, rehabilitation, and optimization of digestion and solids treatment systems, with upgrades to solids processing, digester operation, and supporting thermal infrastructure; 5) emergency power generation and electrical system upgrades, including enhancements to support reliable plant operations and installation, or improvement of emergency power infrastructure to maintain operations during outages or peak demand; 6) odor control improvements, including projects identified as odor control improvements and odor control improvements evaluation, which include foul air treatment systems, clarifier covers, and odor control equipment; 7) chemical handling and disinfection system improvements identified as disinfection pump improvements and liquid treatment rehabilitation projects that encompass the upgrade and expansion of RP-1 liquid treatment and disinfection systems, such as increased liquid treatment capacity to meet projected flows, modernization of disinfection pumping and dosing infrastructure, and optimization of post-filtration chlorination; and 8) other improvements, including headworks rehabilitation, clarifier rehabilitation, mixed liquor return pump improvements, electrical and heating, ventilation and air conditioning (HVAC) system upgrades, and recycled water facilities. The IEUA RP-1 Project implements a portion of the long-term modernization, rehabilitation, and capacity improvements previously analyzed for the RP-1 facility in the Final Program EIR. The project applicant seeks the following modifications to the existing Solids Thickening Facility pursuant to South Coast AQMD Application Number (A/N) 648840: 1) replacement of the existing sludge gravity thickeners, the sludge blending tank, and the dissolved air flotation thickener and its associated recirculation pump with eight new rotary screen thickeners and two solids blending tanks, which will be installed within a new building; and 2) construction of three new acid phase digesters and one sulfur removal treatment system with four iron sponge units to treat the gas produced from the acid phase digesters. The project applicant also seeks to install: 1) a new emergency diesel-fueled internal combustion engine (South Coast AQMD A/N 648201), rated at 2,206 brake horsepower, to provide supplemental backup power to the four existing emergency engines and ensure uninterrupted operation of the wastewater treatment process during electrical outages; 2) a new digester gas/natural gas-fired boiler (South Coast AQMD A/N 648202), with a rated capacity of 13.902 million British thermal units per hour, to provide additional heating capacity to the existing hot water loop system serving the seven existing anaerobic digesters and the three new acid phase digesters; and 3) a new odor control system (South Coast AQMD A/N 648203), with an operating capacity of 14,370 standard cubic feet per minute, comprised of one pre-treatment aqueous scrubber to remove ammonia from foul air and one biofilter to treat foul air from the sludge thickening building, rotary screen thickeners, sludge blending tanks, centrifuge sludge dewatering building, sludge silos, and drainage pump station. Lastly, the IEUA RP-1 Project includes replacement of three existing 10,300-gallon sodium hypochlorite storage tanks with four new 12,189-gallon sodium hypochlorite storage tanks; however, these modifications do not require a permit pursuant to South Coast AQMD Rule 219(d)(13)(U).

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted, full and open competition for a firm-fixed-price construction project to replace the wastewater treatment plant at South Rim Village in Grand Canyon National Park, Arizona. The project involves the installation of a GD Membrane Bio-Reactor plant, including process systems, instrumentation, electrical utilities, and administrative buildings, as well as the complete demolition of existing infrastructure and improvements to the facility access road. The contract magnitude is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a requirement to complete the work within 1,095 calendar days after the notice to proceed. The scope also includes a 12-month operational support period following construction. The government will award the contract based on a multi-factor, best-value tradeoff process, weighing price against technical factors including project experience, technical approach, key personnel qualifications, management approach, and small business participation. Offerors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements include strict cybersecurity hygiene for SCADA/MES equipment and the provision of full data and software rights to the government. Proposals must be submitted electronically in two volumes by November 2, 2026, and include a detailed price schedule covering the plant replacement, compost facility, O&M support, and access road improvements, along with options for radon gas testing and mitigation.
Dsc Contracting Services Division

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221320
New
SLED
RFB-758-2700000116-2 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB 758 2700000116
The Department of Military Affairs for the Commonwealth of Kentucky has issued Request for Bid RFB 758 2700000116 for a Master Agreement to provide comprehensive water and wastewater operations, maintenance, monitoring, and compliance services at Bluegrass Station in Lexington, Kentucky. The scope of work includes the management of a 100,000-gallon max flow wastewater treatment plant, eight lift stations, three permitted outfalls, and 16 miles of sewer collection lines. Key deliverables involve monthly fixed-price operations and compliance support, including the submission of monitoring reports, certified laboratory testing, residuals handling and disposal, and skilled labor for corrective maintenance, electrical services, and instrumentation and controls. This is a Group All award, requiring vendors to bid on all line items to be considered responsive. The contract will be awarded based on a Best Value Ranking Approach, with 90 points allocated to price and 10 points to experience, requiring a minimum of three years of business operation within the United States. Bidders must submit their responses electronically via the eProcurement system by September 25, 2026. The selected contractor must adhere to various Commonwealth laws, including specific tax and labor regulations, boycott provisions, and accessibility standards under the Rehabilitation Act of 1973 and the Federal Telecommunications Act. Payment is processed within 30 working days following the successful completion and acceptance of services.
Department of Military Affairs

POSTED

7 days ago

DEADLINE

in 4 days
View Details
NAICS: 221320
SLED
Bid # 6000003484 - Operation And Maintenance of Bulk and Satelitte Fuel Farm Wasterwater Treatment Facilities At John F. Kennedy International Airport, Jamaica, NY – Four (4) Year Contract
Solicitation # 6000003484
The Port Authority of New York and New Jersey is soliciting bids for a four-year contract to provide operation and maintenance services for the bulk and satellite fuel farm wastewater treatment facilities at John F. Kennedy International Airport. The contract is expected to commence on or about January 12, 2027, and expire on January 11, 2031, with the Port Authority retaining an option to extend the term for one additional year. The scope of work includes daily, weekly, and monthly maintenance tasks, process monitoring, and adherence to SPDES Permit guidelines and EPA safety standards. The contractor is responsible for the full lifecycle of waste management, including the characterization, transport, and disposal of all generated waste. Award selection is based on the best value proposal, evaluating price, the quality of the work plan, past experience, and the bidder's ability to meet supplier selection goals for small, local, or disadvantaged firms. Key personnel requirements include a permanent Project Manager present at the facility at least eight hours per week and a designated Safety Director. Security is a critical component, requiring all personnel to undergo background checks via the Secure Worker Access Consortium and obtain JFK SIDA cards. Bids must be submitted electronically through the Euna Procurement platform by September 28, 2026. Pricing is structured across several exhibits covering annual labor, equipment replacement, biometric systems, and specialized subcontractors.
Port Authority Of Ny & Nj

POSTED

7 days ago

DEADLINE

in 7 days
View Details
NAICS: 221320
SLED
RFB-758-2700000116-1 | Water and Wastewater Operations, Maintenance, Monitoring
Solicitation # RFB 758 2700000116
The Commonwealth of Kentucky Department of Military Affairs is soliciting bids under RFB 758 2700000116 for a Master Agreement to provide comprehensive water and wastewater operations, maintenance, monitoring, and compliance services at Bluegrass Station in Lexington, Kentucky. The scope of work includes the operation of a DAVCO-Defiance Advanced Wastewater Treatment Plant with a 100,000 gallons per day capacity, as well as the management of collection, stormwater, and drinking water distribution systems. Key deliverables include annual domestic valve exercising, annual backflow preventer testing by certified professionals, and strict adherence to KPDES Permit No. KY0020699 and AWWA M6 standards for water meter testing. The contract is structured as a Group All award, meaning vendors must bid on all line items to be considered responsive. Pricing includes a monthly fixed price for operations and compliance, as well as reimbursable costs for laboratory testing and materials, and hourly rates for corrective maintenance, electrical, instrumentation, and emergency response labor. Award will be based on a Best Value Ranking Approach, with 90 points allocated to price and 10 points to business experience, requiring a minimum of three years in operation. Bids must be submitted electronically by September 25, 2026. The contractor must comply with Kentucky state laws, including KRS 45A.125 which prohibits cost-plus contracts, and adhere to federal accessibility standards under the Rehabilitation Act of 1973 and the Telecommunications Act of 1996.
Department of Military Affairs

POSTED

14 days ago

DEADLINE

in 4 days
View Details
NAICS: 221320
SLED
L2 GAC
Solicitation # 27-01
The Upper Occoquan Service Authority (UOSA) issued Invitation for Bids #27-01 on September 4, 2026, for the GAC Treatment Optimization project, also known as Contract L2 GAC. This construction project, specifically Phase 1, focuses on GAC treatment optimization at the UOSA facility located in Centreville, Virginia. The contract will be awarded to the lowest responsive and responsible bidder based on the total cost provided on the Bid Summary Sheet. Bids must be submitted in sealed form by October 6, 2026, at 2:00 PM. A pre-bid meeting is scheduled for September 17, 2026, at 10:00 AM. The project is governed by the Virginia Public Procurement Act and requires strict adherence to federal and state regulations, including Davis-Bacon Labor Standards and Build America, Buy America (BABA) requirements for iron, steel, and manufactured products. Successful bidders must provide performance and payment bonds for the full contract amount and comply with civil rights and nondiscrimination laws. Operational requirements include maintaining wastewater treatment through detailed coordination plans for temporary connections and adhering to standard working hours of 7:00 AM to 6:00 PM, not exceeding 40 hours per week. Administration is managed by Executive Director Brian Steglitz and site contact Rohal Patil of CDM Smith, with payments processed through the UOSA Contract YPIU application.
Upper Occoquan Service Authority

POSTED

18 days ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS