Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Sunnyvale Water Pollution Control Plant Secondary Treatment and Dewatering Facilities Project

Forecast
2015062037State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Sunnyvale is advancing the Cleanwater Center Project, a central facility to consolidate administration, laboratory, operations, and maintenance functions for the Donald M. Somers Water Pollution Control Plant. Located on the north side of Carl Road, this new building will replace the existing Administration Building, Laboratory/Control Building, Operator/Maintenance Building, and Compliance Inspection Building, streamlining operations and improving efficiency. The project evolved from the 2016 Program Environmental Impact Report for the WPCP Master Plan and represents a key step in modernizing the city’s wastewater infrastructure. Concurrently, the Sunnyvale Water Pollution Control Plant Secondary Treatment and Dewatering Facilities Project is being prepared for future procurement, with a forecast posted in May 2026, indicating upcoming construction activities aimed at upgrading treatment capacity and sludge processing. The project is being managed by the City of Sunnyvale’s Public Works department, with Dennis Ng serving as the primary point of contact and Karen Lancelle of ESASSOC as the managing planner, ensuring coordination between city staff and consulting teams. The work will take place at the plant’s existing site in Sunnyvale, California, with a zip code of 94089.

General Info

Sunnyvale builds Cleanwater Center to consolidate wastewater operations and prepares for future treatment upgrades.

Agency

California → City of Sunnyvale

Place of Performance

Carl Road and Borregas Avenue, Sunnyvale, CA, 94089

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sunnyvale
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Sunnyvale
Office AddressN/A
Contacts
Dennis NgAssistant Director of Public Works/City Engineer
Karen LancelleManaging Planner

Interested Companies (1)

Environmental Science AssociatesTampa, Florida

Full Description

Show more
In the 2016 Program Environmental Impact Report (PEIR) for the Sunnyvale Water Pollution Control Plant (WPCP) Master Plan (Master Plan), the City proposed to approve the Sunnyvale Water Pollution Control Plant Master Plan for the Donald M. Somers Water Pollution Control Plant. After adoption of the PEIR, Master Plan projects underwent further development. The City of Sunnyvale has proceeded with design of the Cleanwater Center Project (Project) which was called the Administration and Laboratory Building project in the PEIR. The project will provide a centralized workplace for WPCP administration, laboratory, operations, and maintenance staff on the north side of Carl Road, and replace the functionality of the existing Administration Building, Laboratory/Control Building, Operator/Maintenance Building, and Compliance Inspection Building.

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
SLED
Odor and Corrosion Control
Solicitation # 2027-006-JS
The City of Sarasota is soliciting bids for Odor and Corrosion Control services to reduce wastewater odors at multiple lift station facilities. The scope of work includes the operation, maintenance, and repair of these systems, as well as responding to odor complaints within two hours and equipment failures within four hours on a 24/7 basis. Key deliverables include monthly monitoring of all sites and the implementation of a service program that records hydrogen sulfide data at least every five minutes. Bidders must be licensed Florida General Contractors and provide all necessary personnel, materials, and transportation. The contract follows a default term of three years with two optional one-year renewals, for a total potential duration of five years. Award will be granted to the lowest responsible and responsive bidder. Requirements for the contractor include providing new, standard production models of equipment, ensuring all storage tanks are properly labeled according to local, state, and federal regulations, and maintaining insurance with an A.M. Best rating of at least A Excellent. All responses must be submitted electronically as a consolidated PDF via the city's online portal by the December 3, 2026, deadline. Invoicing must include the contract number, purchase order, and Federal Employer Identification Number, with payments issued upon delivery and acceptance of goods or services.
Utilities

POSTED

5 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS