Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on December 27, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OPW 54723: 2024 Emergency Utility Cuts Minor Roadways

Closed
CI-2023-0195State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
Federal
Jake Rocks Road Reconstruction
Solicitation # 127EAX27Q0003
Solicitation 127EAX27Q0003 is a Request for Quotation issued by the USDA Forest Service for the Jake Rocks Road Reconstruction project in the Bradford Ranger District of the Allegheny National Forest, located in Warren, Pennsylvania. This total small business set-aside under NAICS 237310 requires a contractor to provide all equipment, labor, and materials to rehabilitate approximately 2.97 miles of designated roads, specifically Forest Road 492 and 492A, as well as two recreational parking areas, two overlook parking areas, and two pull-off areas. The scope of work includes milling and overlaying asphalt, full depth replacement and spot repairs, culvert removal and installation, ditch work, guide rail replacement, the installation of erosion and sedimentation controls, and the construction of accessibility features. All work must adhere to FP-14 Standard Specifications, Forest Service Supplemental Specifications, and MUTCD standards for signage. The contract period of performance runs from November 2, 2026, to September 30, 2027, with a delivery requirement of 135 days after the notice to proceed. Award will be based on the lowest price technically acceptable criteria, evaluating the offeror's technical approach, performance schedule, and a record of three similar projects completed within the last three years. Proposals must be submitted as separate PDF files via email to the designated points of contact by October 26, 2026, at 1:00 PM Eastern Time. Required submission documents include a signed SF1442, a priced Schedule of Items, a technical proposal, and a bid guarantee. The project is subject to the Davis-Bacon Act and requires compliance with Buy American requirements and specific environmental protocols, including the cleaning of equipment to prevent the spread of invasive species on Forest Service lands.
Csa Southwest 7 Usda-Fs

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
Historic Old Town Parking Lot Improvement Project
Solicitation # 500545
The Historic Old Town Parking Lot Improvement Project, solicitation number 500545, is a construction contract issued by the City of Roseville, California, to develop an at-grade surface parking lot and alleyway aesthetic improvements. The scope of work includes extensive site preparation such as clearing, grubbing, and the off-hauling of 5,000 to 8,000 cubic yards of soil, followed by the installation of hot-mix asphalt pavement, concrete flatwork, and comprehensive underground utilities including water, sewer, storm drain, and electrical systems. Additional requirements involve landscaping, irrigation, decorative steel fencing, and the installation of EV charging stations with associated lighting and electrical equipment. The contract will be awarded to the lowest responsible bidder based on the Grand Total Bid Price. All work must adhere to the City of Roseville Design and Construction Standards, California MUTCD for pavement markings and signage, and ADA compliance for accessible paths of travel. Key deliverables include a Storm Water Pollution Prevention Plan and a Rain Event Action Plan. The successful contractor must provide performance and payment bonds, certificates of insurance, and ensure all labor complies with California prevailing wage rates. Bids must be submitted in a sealed physical format by the deadline of November 10, 2026.
City of Roseville

POSTED

about 4 hours ago

DEADLINE

in 12 days
NAICS: 237310
New
SLED
2027 Citywide Concrete Repairs And Intersection Ramps Project
Solicitation # 27-005
The 2027 Citywide Concrete Repairs and Intersection Ramps Project (Bid #PWC 8483-K / Solicitation 27-005) is a City of Fremont, California, initiative focused on the reconstruction of damaged curbs, gutters, sidewalks, and driveway approaches across various citywide locations. The scope of work includes installing pedestrian curb ramps, replacing asphalt pavement, performing tree removal and root pruning, planting new street trees, and applying pavement striping. A critical safety component of the project involves the handling of slag material in the road base, which requires a specific health and safety plan for worker protection. The estimated construction cost for the project is 3,300,000 dollars, with a performance period of 170 working days from the notice to proceed. Work is restricted to Monday through Friday, from 7:30 a.m. to 4:00 p.m. The contract will be awarded to the responsible bidder who submits the lowest responsive bid. Bidders must provide bid security equal to 10 percent of the maximum bid amount and, upon award, must provide performance and payment bonds for 100 percent of the contract price. Compliance requirements include adherence to California Labor Code prevailing wage laws, City of Fremont minimum wage ordinances, and CARB certifications. The contractor is responsible for all traffic control and public safety measures. Final acceptance is contingent upon the completion of all punch list items and the issuance of a written notice of acceptance by the City Engineer. Submissions must be delivered in sealed envelopes and include a completed bid schedule in ink, a subcontractor list for any entity performing more than 0.5 percent of the work, and a completed Statement of Responsibility.
City of Fremont

POSTED

about 5 hours ago

DEADLINE

in 12 days
NAICS: 237310
New
SLED
BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)
Solicitation # 232713
The Bridge Repair Maintenance Group 2 (Re-bid) project, solicitation number 232713, is a specialized infrastructure effort by the City of Los Angeles Bureau of Engineering, Public Works. The project is designed to restore original functionality and prevent further structural deterioration of three specific locations: the Sunnyslope Avenue Pedestrian Bridge, the Coldwater Canyon and Burbank Blvd Bridge, and the Doman Avenue Pedestrian Bridge. The scope of work includes repairing concrete spalls and cracks, asphalt patching, and restoring bridge railings and timber bridge decks, along with other incidental work necessary for completion. The project is funded by the Bridge Repair and Maintenance Program and the Engineering Special Services Fund, with a city engineer's estimate of 393,300.00 dollars. This is a restricted solicitation open only to five pre-qualified prime contractors: Calex Engineering, Clarke Contracting, Jilk Heavy Construction, Inc., Mike Prlich & Sons, Inc., and Mladen Buntich Construction Company. Bids must be submitted to Los Angeles City Hall by December 9, 2026, at 2:00 p.m. While a bid bond is not required, the successful contractor must provide payment and performance bonds for at least 100 percent of the task bid price. The project complies with the California Environmental Quality Act and is managed by Marilyn Galeano of the Bridge Improvement Division.
Engineering Bureau, Public Works

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
SLED
Saw Cutting, Asphalt Repair/Replacement And Paving
Solicitation # 2608
The Yucaipa Valley Water District is soliciting bid proposals for asphalt repair and paving services at various locations within the City of Yucaipa and the City of Calimesa. The scope of work includes saw cutting, removal of existing asphalt, installation of hot patches, asphalt grinding and overlay, manhole adjustments, and subsurface subsidence repair. Contractors must adhere to the paving standards of both cities, follow the American Public Works Association Work Area Traffic Control Handbook, and comply with CARB 2022 amendments for In-Use Off-Road Diesel Fueled Fleets. The contractor is responsible for obtaining all necessary permits, including encroachment permits for work within the City of Yucaipa right-of-way, and must ensure the legal disposal of all residues. Repairs are required to begin within one week of notification and must be completed within four weeks. Eligible bidders must possess a valid California State Contractors License and demonstrate a proven record of performing similar work for at least five years. Submissions must include a company profile, a signed non-collusion statement, and up to five professional references. The District will evaluate awards based on the best interest of the agency, focusing on quality, timeliness, and cost-effectiveness. Payment terms are set at Net 30 Days. Compliance with California prevailing wage laws, OSHA standards, and specific insurance requirements—including naming the District as an additional insured and waiving subrogation—is mandatory. Sealed proposals must be submitted to John Wrobel by November 10, 2026, at 10:00 a.m.
Yucaipa Valley Water District

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract OPW 54723 pertains to a 2024 emergency utility cuts project focused on minor roadway repairs within the City of Omaha. The scope encompasses removals, construction of concrete pavements and sidewalks, and utility adjustments to facilitate emergency repairs. The project is scheduled to commence following the Notice to Proceed, anticipated for April 1, 2024. Bidders are required to submit a comprehensive bid that includes a bid bond, which must be issued by a surety licensed in Nebraska and listed on the U.S. Department of the Treasury’s Circular 570, or acceptable substitutes such as certified checks or U.S. Government Bonds. The bid submission must also include an Economic Equity and Inclusion Plan (EEIP), and the contractor should attach an Apprenticeship Incentive Form to qualify for apprentice utilization provisions. The project does not have a Small and Disadvantaged Business Enterprise (SEB) reserve, indicating no set-aside for small or disadvantaged businesses. The contract emphasizes compliance with procurement procedures, including the submission of the bid bond within seven days after the bid deadline, and specifies that the bid bond must be uploaded electronically with the bid. The project is managed by Douglas County, Nebraska, and is part of a broader procurement effort that includes various construction and service contracts, each with specific requirements, deadlines, and scope of work. The comprehensive bidding process aims to ensure qualified vendors provide timely and compliant services for emergency roadway repairs, with provisions for economic equity, apprenticeship utilization, and strict bid security protocols to safeguard the integrity of the procurement.

General Info

Place of Performance

NE, USA

Set-Aside

NONE

Documents

11

Bid Submittal Form for Individual, Corporation, Partnership or Joint Venture

XLSX, High priority: read this firstbid-submittal
High

CI-2023-0195 OPW 54723: 2024 Emergency Utility Cuts Minor Roadways

PDF, High priority: read this firstrfb
High

Economic Equity & Inclusion Program (EEIP) Annual Plan Template

PDF, High priority: read this firsteeip-plan-template
High

Exhibit A_SEB Participation Disclosure Form

XLSX, High priority: read this firstparticipation-disclosure
High

Exhibit C Responsible Contractor Compliance Form (RC-1)

XLSX, High priority: read this firstcompliance-form
High

Exhibit D Affidavit for Employee Classification Act

PDF, High priority: read this firstaffidavit
High

OPW 54723 - 2024 Emergency Utility Cuts Minor Roadways - Specifications

PDF, High priority: read this firstrfp
High

OPW 54723 - Bid Bond for 2024 Emergency Utility Cuts Minor Roadways

XLSX, High priority: read this firstbid-bond
High

Apprenticeship Incentive Form (AIF) for Omaha Municipal Code Compliance

XLSX, Low priorityother
Low

City of Omaha SEB Participation Utilization Form - No Reserve

PDF, Low prioritysebp-utilization-form
Low

Exhibit B Certificate of Compliance Form

XLSX, Low prioritycertificate-of-compliance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Douglas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyNebraska → Douglas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
OPW 54723: 2024 Emergency Utility Cuts Minor Roadways:  City of Omaha is requesting bids from qualified companies, herein called Bidder, Contractor, Vendor, Supplier, or other pronouns used in their place, for all work and/or goods set forth in the specifications.  
SCOPE: Removals, construction of concrete pavement and sidewalks, utility adjustments.  
Anticipated Notice to Proceed date:  Monday, April 1, 2024   This bid does not have an SEB reserve.
This project requires submission of an Economic Equity and Inclusion Plan (EEIP).
This project qualifies for Apprentice utilization.  Contractor should attach Apprenticeship Incentive Form (AIF) with their bid submission to utilize this provision.
Requirement for Bid Bond:  The surety company issuing the bid bond should be licensed by the State of Nebraska and listed on the current edition of Circular 570 of the United States Department of the Treasury.  Acceptable substitutes for a bid bond: a certified check, an official bank check, a cashier's checks drawn on a national bank or a bank chartered under the laws of the state, payable to City of Omaha, or lawful money of the United States, or a United States Government Bond (negotiable).  LETTERS OF CREDIT ARE NOT AN ACCEPTABLE SUBSTITUTE FOR A BID BOND AND WOULD BE CAUSE FOR REJECTION OF BID.   The bid bond amount is listed in the Attributes section.
A copy of the bid bond/acceptable substitute shall be uploaded in the Response Attachments section.  The original document must be received by the City Clerk, 1819 Farnam Street LC-1, Omaha-Douglas Civic Center, Omaha, NE 68183 within seven (7) calendar days of the closing date and time indicated.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS