Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on February 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0

Awarded
69056725B000011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
CMGC - 112T37CM D11 I-5/I-805 Express Lanes Corridor Project
Solicitation # 112T37CM
The I-5/I-805 Express Lanes Corridor Project is a Construction Manager/General Contractor (CMGC) initiative managed by the California Department of Transportation. Located in San Diego County, the project aims to modernize roadway infrastructure across the cities of San Diego, Chula Vista, National City, Del Mar, Solana Beach, Encinitas, Carlsbad, and Oceanside. The scope involves creating over 40 miles of continuous Express Lanes through the installation of pavement striping, signage, traffic safety elements, paving, and electrical components. The estimated cost for construction capital is 386 million dollars, with an additional 1 million dollars allocated for Right of Way capital and utility relocation. The procurement process utilizes a ranking system based on Statements of Qualifications (SOQs) and interviews to evaluate the legal, technical, financial, and management capabilities of proposers. The project is divided into a preconstruction services phase, which is a reimbursement contract not to exceed 2.5 million dollars, and a subsequent construction phase based on a unit price contract. Key requirements include compliance with Buy America regulations, Title VI of the Civil Rights Act, and strict safety reporting for the past three to five years. Proposers must submit a comprehensive SOQ in a three-ring binder by January 11, 2027, following a rigorous evaluation of experience, key personnel, and project approach.
California Department of Transportation

POSTED

about 2 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
Bridge Replacement Newcomb Road Bridge over Canisteo River
Solicitation # 2140215
Steuben County is soliciting unit price bids for the replacement of the Newcomb Road Bridge over the Canisteo River in the Town of Rathbone, New York. The project involves replacing an existing 3-span bridge with a new 2-span integral abutment bridge approximately 220 feet in length, featuring a center pier, metalized steel girders, and a concrete deck. The project limits extend from 522 feet south of the railroad tracks to the tracks themselves, and an offsite detour will be utilized during construction. All work must adhere to the NYSDOT Standard Specifications adopted on September 1, 2026, with substantial completion required by November 20, 2027, and final completion by December 31, 2027. To be considered responsive, bidders must be registered with the NYS Department of Labor and appear on the official Plan Holders List. Bid packages must be submitted in sealed envelopes by December 8, 2026, and include a completed bid form, non-collusive bidding and disbarment certifications, lobbying certifications, and security totaling at least 5% of the bid amount. While there are no DBE or MBE/WBE/SDVOB goals, the project requires compliance with prevailing wage rates, EEO employment goals per NYSDOT EI 26-014, and the use of Equitable Business Opportunities software for civil rights reporting. All awards are subject to final review and approval by the Steuben County Legislature.
Steuben County

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
Asphalt Street Repairs FY27
Solicitation # 2027-IFB-008
The City of Sierra Vista is soliciting bids for Asphalt Street Repairs FY27 (Solicitation 2027-IFB-008), with a submission deadline of December 11, 2026, at 10:00 am Arizona Time. The project involves asphalt repairs across various city locations covering approximately 20,522 square feet, including saw cutting, removal, and replacement of existing asphalt. The contract is structured as an all-inclusive lump sum for the primary scope of work, with additional unit pricing for on-call maintenance, including asphalt concrete pavement patches, aggregate base course, and law enforcement flagging services. Substantial completion is required by February 28, 2027, and the project duration must not exceed 30 calendar days from the notice to proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must provide a bid bond of at least 10 percent of the bid amount and adhere to strict technical standards, including MAG, ADOT, and OSHA requirements, as well as the Manual on Uniform Traffic Control Devices. Compliance with the Davis-Bacon Act for prevailing wages and various federal non-discrimination and equal employment opportunity regulations is mandatory. The contractor must provide a two-year warranty against defective workmanship or materials and maintain comprehensive general and automobile liability insurance with the City named as an additional insured. Payment is processed within 30 calendar days of receiving a correct invoice for services performed.
STREETS

POSTED

about 23 hours ago

DEADLINE

in 25 days

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Gilchrist, OR, USA

Set-Aside

SBA

Documents

16
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this first233 pages · ifb
High
PDF, High priority: read this first24 pages · plans
High
PDF, High priority: read this first1 page · sow
High
PDF, High priority: read this first23 pages · plan
High
PDF, High priority: read this firstq-and-a
High
PDF, High priority: read this firstq-and-a
High
PDF, High priority: read this first2 pages · q-and-a
High
PDF, Low priorityother
Low
PDF, Low prioritybid-tabulation
Low
PDF, Low priority1 page · presolicitation
Low
PDF, Low priority1 page · q-and-a
Low
PDF, Low priority1 page · q-and-a
Low
PDF, Low priority1 page · contract-document
Low

Read all 16 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 15 days
  • North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

8 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 11, 2026 to Feb 19, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Feb 19, 2026 to Feb 24, 2026. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 690567 Western Federal Lands Division
Contacts1 person available
OfficeVANCOUVER, WA, 98661, USA

Full Description

Show more

Update 2/25/2026: Bid Tabulations posted to attachments.


Update 2/24/2026: Bid Summary posted to attachments.


Update 2/17/2026: Amendment A003 posted to attachments.


Update 2/11/2026: QA_2-11-2026.pdf posted to attachments.


Update 2/10/2026: QA_2-10-2026.pdf posted to attachments.


Update 2/9/2026: Amendment A002 posted to attachments.


Update 2/4/2026: Amendment A001 posted to attachments.


Update 1/30/2026: QA_1-30-2026.pdf posted to attachments.


Invitation for Bids for Construction Project OR FS DSHUT601 60(1), Road 60 Improvements, MP 0 - 1.0


The Invitation for Bids (IFB), Plans, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.

More opportunities from Department Of Transportation → 690567 Western Federal Lands Division

Same awarding agency

NAICS: 532490
New
Federal
Modular Buildings & Restroom Rental with Ancillary Services
Solicitation # 69056727Q000005
Solicitation 69056727Q000005 is an unrestricted, full and open request for quotations issued by the Department of Transportation, Federal Highway Administration, Western Federal Lands Highway Division. The requirement is for a firm-fixed lease of prefabricated modular buildings and restroom facilities, including ancillary services, to support operations during the Division Office Facility Renovation in Vancouver, Washington. The anticipated period of performance is twenty-two months, running from February 1, 2027, to January 31, 2029, with all units required to be turnkey ready for occupancy by March 1, 2027. The scope of work includes the delivery and installation of one 24' x 60' double-wide office trailer featuring at least three offices and two conference rooms, two 8' x 40' single-wide office containers with HVAC, and one three-station restroom trailer no older than seven years. Required ancillary services encompass site preparation, utility connections, weekly septic pumping, freshwater refills, and eventual demobilization. All facilities must adhere to International Building Code standards for commercial occupancy, with specific ADA and OSHA compliance for ramps and step systems. Interior walls for the double-wide unit must meet a minimum STC 40+ sound-dampening rating. Award will be made based on the Lowest Price Technically Acceptable methodology, evaluating price, compliance with solicitation requirements, technical specifications, and relevant past performance. Offerors must submit their quotations in PDF format via the GSA eBuy Portal by December 8, 2026. The government will utilize a designated Technical Point of Contact to conduct physical inspections and formal acceptance of the installations, with a mandatory post-installation leveling adjustment required 30 to 60 days after occupancy.
Other Commercial and Industrial Machinery and Equipment Rental and Leasing

POSTED

3 days ago

DEADLINE

in 22 days
View Details
NAICS: 237310
New
Federal
AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements
Solicitation # 69056726B000012
The Far North Bicentennial Park Enhancements project, managed by the Department of Transportation's Western Federal Lands Highway Division, involves construction along the North Gasline Trail approximately five miles east of Anchorage, Alaska. This sealed bid, firm-fixed-price contract has an estimated price range between $700,000 and $2,000,000, with a tentative completion date of Fall 2027. The scope of work is divided into a base schedule and one option. The base schedule includes the construction of an 80-foot single span prefabricated steel pedestrian bridge over Campbell Creek and a 61-foot boardwalk, along with trail aggregate and turf establishment. Option Z provides for the construction of an additional 51-foot boardwalk. Technical requirements specify adherence to FP-24 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and AASHTO design standards for seismic and pedestrian live loads. Key material specifications include epoxy-coated reinforcing steel, high-strength low alloy structural steel, and Douglas Fir timber treated according to AWPA standards. Contractors must provide weed-free certification for all commercial borrow and aggregate materials. The project is offered for full and open competition on an unrestricted basis, with formal solicitation documents expected in winter 2026/2027.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 15 days
View Details
NAICS: 237310
Federal
ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements
Solicitation # 69056726R000009
The Dent Bridge Road Improvements project (ID FLAP CLEAR 4783(1)) is a construction effort located in Orofino, Clearwater County, Idaho, managed by the Federal Highway Administration Western Federal Lands Division. The project scope covers approximately 4.69 to 4.8 miles of roadwork and includes full depth pavement reclamation, asphalt concrete paving, shoulder reconditioning, deep patch repairs, guardrail improvements, signing, and striping. Technical specifications call for a 4-inch asphalt concrete surface course, 4-inch milling, and 8-inch Full Depth Reclamation with cement using PG 58-34 binder grade. The estimated project cost is between 5 million and 10 million dollars, with a tentative completion date in Fall 2027. This is a restricted negotiated solicitation (RFP 69056726R000009) limited to specific prime contractors under the Idaho, Montana, and Surrounding Areas Multiple Award Task Order Contract (MATOC). Eligible contractors include ASCORP Inc, Granite Construction, Hamilton Construction, M.A. Deatley Construction, MJ Hughes Construction, and Thompson Contracting. The government intends to award the contract based on best value. Key requirements include the submission of printed proposals, a bid bond, and performance and payment bonds equal to 100 percent of the task order price. The project is subject to the Davis-Bacon Act for wage rates and the Buy American-Construction Materials clause.
Highway, Street, and Bridge Construction

POSTED

12 days ago

DEADLINE

in 22 days
View Details
NAICS: 541380
Federal
Inspection, Calibration, Standardization, and Certification of Materials Testing Instruments and Laboratory Equipment
Solicitation # 690567-27-SS-0002
The Department of Transportation, Western Federal Lands Division, is conducting market research via a Sources Sought Notice for the inspection, calibration, standardization, and certification of materials testing instruments and laboratory equipment. This effort seeks qualified small businesses, including Service-Disabled Veteran Owned, 8(a), and HUBZone firms, to provide comprehensive technical services for assets such as universal testing machines, load cells, environmental chambers, and data-acquisition systems. The proposed contract will be a hybrid firm-fixed-price and time-and-materials performance-based purchase order with a base period of twelve months and four optional twelve-month extensions. All work is to be performed on-site at the FHWA-WFLHD compound in Vancouver, Washington. Qualified respondents must demonstrate technical expertise and provide a detailed company profile, including their UEI number and relevant past experience from the last five years. Key requirements include ISO/IEC 17025:2017 accreditation by an ILAC-MRA recognized body and personnel with at least three years of direct experience. All calibrations must maintain traceability to the International System of Units through NIST or equivalent institutes, with a minimum Test Uncertainty Ratio of 4:1. The contractor is also required to maintain specific liability insurance coverage per FAR 52.228-5, including a combined single limit of at least 1 million dollars per occurrence. Responses are due by December 2, 2026, at 2:00 pm PST.
Testing Laboratories and Services

POSTED

12 days ago

DEADLINE

in 16 days
View Details
NAICS: 238910
Federal
Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement
Solicitation # 69056727Q000006
The Western Federal Lands Highway Division of the Federal Highway Administration is soliciting geotechnical drilling services for the Winchester Creek Bridge Replacement project in Douglas County, Oregon. This total small business set-aside under NAICS 238910 requires the investigation of subsurface soil, rock, and groundwater conditions to support the design of a replacement for a seismically vulnerable bridge. The scope of work includes drilling two geotechnical borings, BH26-01 and BH26-02, to depths between 50 and 130 feet, totaling approximately 180 feet of drilling and coring. Key technical requirements include the collection of 44 SPT samples and 4 Shelby samples, the use of HQ3 for rock coring, and the performance of downhole suspension logging for seismic design. The contract will be awarded to the lowest priced, technically acceptable quote. Contractors must adhere to strict technical standards, including FLH Soil and Rock Identification Guidelines and various ASTM standards, and must provide a Temporary Traffic Control Plan and hammer efficiency test reports 15 business days prior to mobilization. Deliverables include daily reports submitted within 24 hours of shift completion and the delivery of samples within 14 calendar days of drilling. Performance is subject to the Geotechnical Activities Categorical Exclusion and State of Oregon backfilling regulations. Invoicing is processed through the Department of Transportation's DELPHI iSupplier system, and the government maintains an option to extend services for up to six months.
Site Preparation Contractors

POSTED

12 days ago

DEADLINE

in 1 day
View Details
NAICS: 237310
Federal
WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8
Solicitation # 69056727B000002
Solicitation 69056727B000002 is an Invitation for Bids for the Olympic NPS ERFO Repairs 2022 project, managed by the Federal Highway Administration Western Federal Lands Division. The project involves critical road repairs on Road 107 at mileposts 0.3 to 0.5 and 0.8 in Olympic National Park, specifically focusing on bank stabilization, riprap installation, and engineered log jams for the Hoh River Road embankment. This firm fixed-price contract has an estimated value between 2 million and 5 million dollars. Work is expected to commence within 10 calendar days of the notice to proceed, with a projected start date of January 25, 2027, and a final completion deadline of September 13, 2027. Bidders must submit a comprehensive package including a manually signed SF 1442, a detailed bid schedule for Schedules A and B, a Standard Form 24 bid bond, and authority to sign certifications. The government will award the contract to the responsible bidder best able to fulfill obligations, applying a 10 percent price evaluation preference to HUBZone small businesses when competing against large businesses. Contractors are required to implement a rigorous Quality Control Plan, adhere to Davis-Bacon Act wage standards, and comply with Buy American requirements for construction materials. Invoicing will be processed electronically through the Department of Transportation's iSupplier DELPHI system.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS