Owens Peak West Water Co. Replacement Well #2 Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Applicant seeks to replace Well No. 1 at its existing facility with a new well designated as Well No. 2, with the original well being transitioned to stand-by status to ensure continued water supply reliability. This project is managed under the oversight of the State Water Resources Control Board in California, and is publicly forecasted with a posted date of January 7, 2026. The facility is located in California, though specific city and zip details are not provided, and the primary point of contact is Adrian Dela Calzada, an Environmental Scientist at the agency, reachable via phone and email. Mechanically, the initiative involves the construction and operational setup of the new well while preserving the existing infrastructure as a backup, reflecting a proactive approach to water resource management and system resilience. Additional inquiries can be directed to Mechelle Ernst, the project Manager, indicating collaborative oversight between regulatory and operational staff.
General Info
Agency
NAICS
Place of Performance
Denise Ave and Coso Ave, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
