This Pre-Solicitation opportunity from Department Of Defense was posted on November 21, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P--Behavioral Guidance Structure (BGS) Removal and Trash Shear Boom Repairs, Lower Granite Dam, Whitman and Garfield Counties, Washington

Awarded
W912EF-07-B-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 9 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This project involves the removal and disposal of the Behavioral Guidance Structure (BGS) and the repair of the trash shear boom at the Lower Granite Dam in Washington. The scope of work includes the disassembly and removal of approximately 3.7 million pounds of structural steel and equipment, including anchor frames, cables, winches, and pontoons. Additionally, the contractor must repair 2,500 feet of trash shear boom by replacing 1,500 feet of wire rope, installing connecting hardware and lumber bumpers, and fabricating a specialized gap seal float. Due to the nature of the site, the project requires extensive underwater diving at depths up to 110 feet using surface-supplied air and recompression chambers. Operations will primarily be conducted from the water, necessitating the use of barges and barge-mounted cranes. This opportunity is a 100 percent small business set-aside under NAICS code 238910, requiring contractors to have an annual average gross income not exceeding 13 million dollars and active registration in the Central Contractor Registration system.

General Info

Contract Value

$1,060,564

NAICS

238910 - Site Preparation Contractors

Place of Performance

US Army Engineer District, Walla Walla 201 N. Third Avenue, Walla Walla WA 99362-1876, WA, USA

Set-Aside

SBA

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Dec 19, 2006 to Dec 21, 2006. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
ContactsNo contacts available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA
ContactsNo contact information available

Full Description

Show more
SOLICITATION DOCUMENTS, INCLUDING DRAWINGS, WILL BE AVAILABLE ON THE FEDTEDS WEBSITE (www.fedteds.gov). This work will be for the removal and disposal of the behavioral guidance structure (BGS) and repair of the trash shear boom. The BGS located in the forebay of the dam is a large floating steel curtain about 1100 feet long that extends from 50 to 80 feet below the water surface and is anchored both to the shore and riverbed and to the upstream concrete face of the dam. The work will require the removal of the BGS including an anchor frame and plates, the BGS structure proper, anchor cables, guide cables, and positioning cables, winches, generator, buoys, clump weights, pontoons and shackle chains. Portions of the structure embed ded in bottom sediments may remain in place. The work will require disassembly, metal cutting and fragmentation to manageable sizes, lifting, moving, and removal for disposal or storage as indicated. Approximately 3,700,000 pounds of structural steel an d equipment was used for original construction of the BGS. Fragments or portions of the BGS designated for disposal can be taken to the north shore storage area and reduced to smaller sizes to facilitate transport off the project site. The trash shear boom is approximately 2500 feet long located in the forebay of the dam. Repairs will consist of replacing approximately 1500 feet of 2 inch wire rope; furnishing and installing a variety of connecting hardware consisting of chains, shackle s, sockets, and a variety of fabricated connecting hardware; and pressure treated 2x12 lumber bumpers. Fabricate and install a gap seal float. Float is 15 feet long consisting of two 20 inch diameter HDPE plastic pipes separated by a fabricated stainless steel frame and screen. Frame has a weighted keel. Cylinders are filled with polystyrene to maintain buoyancy.. A considerable amount of underwater diving work will be required at depths up to 110 feet. Diving will be surface supplied air and recompression chambers are required. The majority of the work will be performed from the water so barges, barge mounted cra nes, and other floating plants will be necessary. No hazardous materials are involved. ADMIN INFO: The North American Industry Classification System (NAICS) code is 238910. Solicitation is 100% SMALL BUSINESS SET ASIDE. For the purposes of procurement, a concern is considered a small business if its annual average gross income does not ex ceed $13 million. In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the Central Contractor Registration (CCR). Contractors can access the CCR for free at http://www.ccr.gov . For contracting opportunities, visit the Federal Business Opportunities (FedBizOpps) site, www.fbo.gov. This synopsis is not a request for bid, but a notice that a solicitation will be issued. Site visit information will be included in the solicitation .

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA0020001
The US Army Corps of Engineers, Walla Walla District, is soliciting offers for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at the Dworshak Dam. This small business set-aside project requires the contractor to provide all personnel, materials, equipment, and transportation to move the bulkheads from Dworshak Dam to a repair facility and back. The scope of work includes existing coating removal, weld inspection and repair according to AWS D1./D1.M standards, and the application of new coatings in compliance with SSPC SP 5/NACE No. 1 and Section 09 97 02.00 28 for hydraulic structures. The government provides the bulkheads as government furnished property, with each unit having an estimated value of 850,000 dollars. The project is structured in three phases, with each phase involving two top and two bottom bulkheads. Performance is scheduled between November 23, 2026, and July 5, 2027, with specific pickup and return windows for each phase. Deliveries and retrievals must be coordinated 15 days in advance and occur Monday through Thursday. Key requirements include a one-year warranty on the coating system, the submission of general inspection reports within five business days of each inspection, and the provision of manufacturer safety data sheets and CERL Lab certification for all paint materials. The contractor must also ensure all paint is stored and packaged according to strict safety and stability guidelines to prevent degradation.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

3 days ago

DEADLINE

in about 20 hours
View Details
NAICS: 811310
Federal
LLA Fish Pump - Motor Rewind
Solicitation # W912EF27QA006
Solicitation W912EF27QA006 is a combined synopsis and request for quotation issued by the US Army Engineer District Walla Walla for motor rewind and asbestos abatement services at the Lower Granite Dam in Pomeroy, Washington. The scope of work involves the rewinding, refurbishing, and addition of eight resistance temperature detectors to three polyphase AC squirrel cage induction motors used for fish pumps. This includes one Hitachi dual winding motor and two Ideal Electric single-winding motors. To ensure operational continuity, the project will be executed by rewinding one motor per year, with a total performance period extending through December 2029. The contract is a firm-fixed-price acquisition and is not set aside for small business concerns, although evaluation preferences are provided for HUBZone small businesses. Key technical requirements include the use of a minimum class F motor insulation system and strict adherence to core loss and hot spot specifications. Deliverables include the refurbished motors, final operation and maintenance manuals, and on-site commissioning support. The government has established a seven-business-day window for the acceptance or rejection of services following delivery. Liquidated damages are specified for delays, with daily rates increasing annually from FY28 through FY30. Offerors must comply with various federal regulations, including the Buy American and Balance of Payments Program, E-Verify personnel screening, and DFARS cybersecurity reporting standards.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

8 days ago

DEADLINE

in 25 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS