Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Paint Waste Area Unexploded Ordnance Site 13 Record of Decision/Final Remedial Action Plan

Forecast
2026080071State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Toxic Substances Control is overseeing the remedial action for the Paint Waste Area, also known as Unexploded Ordnance Site 13, located at the Former Mare Island Naval Shipyard in Vallejo, California. The project aims to address lead contamination, paint waste debris, and potential munitions and explosives of concern. The scope of work involves the excavation of approximately 818 bank cubic yards of impacted soil and 182 cubic yards of overburden from Target Treatment Zone A to a depth of 4.5 feet. Excavated materials will be mechanically screened for munitions and transported to permitted offsite facilities, such as Clean Harbors, Inc. or Recology Hay Road Facility. Following excavation and lead confirmation sampling via EPA Method 6010, the area will be backfilled with 1,000 bank cubic yards of clean soil and restored using native grasses and wetland species like pickleweed and salt grass. To manage long-term risks, institutional controls will be implemented for both Target Treatment Zones A and B to prohibit ground penetration and restrict sensitive land uses. The project is scheduled to be executed in four phases between July 1, 2025, and September 2, 2025, covering site preparation, excavation, backfilling, and restoration. Environmental compliance is managed through an Environmental Protection Plan, with specific requirements for dust control, including watering exposed surfaces twice daily and limiting grading activities to wind speeds below 20 mph. The project has been determined to have no significant environmental effect under the California Environmental Quality Act, with regulatory oversight provided by the DTSC and the San Francisco Bay Regional Water Quality Control Board.

General Info

Agency

California Toxic Substances Control, Department of

Place of Performance

West of the intersection of Azuar Drive and G Street on Mare Island, Vallejo, CA, 94592

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia Toxic Substances Control, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Toxic Substances Control, Department of
Office AddressN/A
Contacts
Franklin MarkProject Manager
Scott AndersonNavy BRAC Environmental Coordinator

Full Description

Show more
The California Department of Toxic Substances Control (DTSC) approved the Record of Decision (ROD)/Final Remedial Action Plan (Final RAP) for the Paint Waste Area (PWA), also identified as Unexploded Ordnance (UXO) Site 13, located at the Former Mare Island Naval Shipyard (MINS) in Vallejo, California. Within the PWA, the remaining paint waste debris and associated soil contamination, and the potential for incidental munitions and explosives of concern (MEC) hazards beneath the detection depth limits of available technology will be addressed by the remedial action described in the ROD/Final RAP. The actions consist of the following: •Soil excavation and offsite disposal for the PWA Target Treatment Zone (TTZ) A and Institutional Controls (ICs) for incidental MEC for both TTZ A and TTZ B to restrict certain sensitive uses of the property and prohibit ground-penetration. The remaining paint waste debris and lead contamination within TTZ A will be excavated, mechanically screened to remove MEC, and transported to a permitted offsite waste disposal facility. •Soil will be excavated to an estimated depth up to 4.5 feet below ground surface (bgs). The impacted soil is estimated at 818 bank cubic yards (cy) from TTZ A with an additional estimated 182 cy of overburden or extra soil from benching the excavations. After excavation is completed and no visual deposits of paint waste remain, lead confirmation samples will be collected at the extent of the excavations. •The excavations will be backfilled with clean imported soil (approximately 1,000 bank cy), compacted, and restored to match pre-excavation conditions. •Excavated areas will be hydroseeded with native grasses to prevent erosion and revegetated with wetland plant species, such as pickleweed cuttings and salt grass, to promote appropriate nontidal wetland habitat and monitored to confirm that agreed upon wetland revegetation criteria are met.

Similar Contracts

Same NAICS industry code

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure and requires the remediation of mold throughout the building, including the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA and OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key technical requirements include the provision of a Certified Industrial Hygienist to verify materials and conduct final clearance, the implementation of HEPA filtration and negative air pressure, and dehumidification to maintain humidity levels at or below 50 percent. This is a single lump sum contract set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Award will be based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must have attended a mandatory site visit on October 27, 2026, and must provide a valid Indiana Contractor's License, proof of specific automobile and workers compensation insurance, and certification of compliance with Davis Bacon Act wage rates. The selected contractor must start work within 14 days of the Notice to Proceed and adhere to Net 30 payment terms.
Atterbury Job Corps Center

POSTED

about 8 hours ago

DEADLINE

in about 17 hours
View Details
NAICS: 562910
New
SLED
C5613679-D - ASBESTOS ABATEMENT, LEAD-BASED PAINT, LEAD-CONTAINING PAINT, LEAD-CONTAINING MATERIALS AND MOLD REMOVAL SERVICES
Solicitation # C5613679-D
This Master Agreement establishes a contract for the California Department of Corrections and Rehabilitation (CDCR) to obtain as-needed services for the cleaning, removal, transport, and disposal of hazardous materials, including asbestos-containing construction materials, lead-based paint, lead-containing materials, and mold-contaminated materials. The scope of work covers various CDCR institutions and facilities, such as High Desert State Prison, Ironwood State Prison, and Kern Valley State Prison. The contractor is responsible for all associated costs, including labor, equipment, personal protective equipment, and disposal fees, with compensation based on the Public Works Rate Sheet. Key performance requirements include a four-hour response time for emergency abatement and a strict submittal process that must be completed five business days before site work begins. The contract is awarded to the lowest responsive bidder, with preferences granted to California-based companies and certified Small, Micro, or Disabled Veteran Business Enterprises. Compliance with Federal, State, and local laws is mandatory, specifically Title 17 of the California Code of Regulations for lead abatement and Senate Bill 854 for prevailing wage requirements. Contractors must provide proof of pollution liability insurance and a payment bond upon award. Work is generally performed Monday through Friday from 6:30 AM to 3:00 PM, and the CCM Site Supervisor serves as the sole authority for determining the acceptance and satisfactory completion of all work.
California Department of Corrections & Rehabilitation

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS