This Solicitation opportunity from Arizona was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Arizona Game and Fish Department issued solicitation BPM007734 for the construction of a new boating facility at Parker Canyon Lake within the Coronado National Forest. The project scope includes clearing and grubbing, grading, paving, the installation of a vault toilet, a dock and gangway, and the construction of an ADA-compliant concrete boat ramp to replace a deteriorating single-lane facility. The project was estimated at 1,500,000.00 dollars and required compliance with the Build America, Buy America Act (BABAA) and specific environmental restrictions, notably a prohibition on work between May 24 and September 30 due to breeding season.
The procurement process involved multiple amendments to the bid schedule and deadlines, with an anticipated start date of October 1, 2026. Bidders were required to provide statutory bid bonds, certifications regarding the boycott of Israel and the ban on forced labor of ethnic Uyghurs, and detailed statements of qualifications. Despite these efforts, the solicitation was officially cancelled on October 21, 2026, and all offers were rejected because the received bids exceeded the project budget.
General Info
Arizona Game and Fish cancelled the Parker Canyon Lake boat ramp construction project.
HighAI Summary for ADOA Exhibit F - Design Change Notice: A State of Arizona General Services Division template for a Design Change Notice (Exhibit F). This document serves as a formal modification to a contract, requiring signatures from the Design Professional, State Lead Building Inspector, and State Procurement Officer to authorize changes to project specifications or terms.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for ADOA Exhibit I Field Order Directive: A State of Arizona General Services Division template for a Field Order Directive (Exhibit I). This document is used to authorize construction change orders, including adjustments to the project lump sum, unit prices, and the number of calendar days for substantial completion. It requires signatures from the Contractor, Design Professional, and Agency Designated Representative to become effective.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for ADOA Exhibit J Construction Contract Change Order Summary: A State of Arizona General Services Division template for a Construction Contract Change Order (Exhibit J). This document serves as a formal modification to a contract, requiring signatures from the Contractor, Design Professional, and State Procurement Officer to authorize changes to the project scope, terms, or cost.
XLSX
XLSX, High priority: read this first1 page · bid-schedule
HighAI Summary for ADOA Exhibit R - Schedule of Values: A financial template for the Schedule of Contract Values (Exhibit R) to be completed by the contractor. It includes fields for item descriptions, scheduled values, work completed, materials stored, and retainage tracking for project invoicing and payment.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 2 - Solicitation BPM007734 (Parker Canyon Lake Boating Facility): Solicitation Amendment Two for the Parker Canyon Lake Boating Facility (BPM007734), issued September 10, 2026. Key changes include extending the bid due date to September 30, 2026, removing specific additive alternate bid items (211-A, 501-2A, and 505-2A), revising the Bid Schedule (ATT B), and uploading a comprehensive Q&A list. Bidders are required to acknowledge the amendment and resubmit bids via the Arizona Procurement Portal.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Attachment D: Bidder's Statement of Qualifications: This document is a Bidder's Statement of Qualifications (Attachment D) associated with an Invitation for Bid (IFB). It serves as a formal questionnaire for contractors to provide company history, organizational structure, project experience, licensing (specifically Arizona Contractor licenses), financial capacity, bonding information, and a list of anticipated subcontractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for BABAA Language for Project Manual - Arizona Game and Fish Department: This document provides the mandatory Build America Buy America Act (BABAA) clause for inclusion in project manuals for the Arizona Game and Fish Department. It specifies requirements for the use of U.S.-produced iron, steel, manufactured products, and construction materials for infrastructure projects per the Infrastructure Investment and Jobs Act, including domestic content thresholds and exclusions for non-permanent equipment.
PDF
PDF, High priority: read this firstifb
HighAI Summary for BPM007734 - Parker Canyon Lake Boating Facility: Invitation for Bids (IFB) issued by the Arizona Game and Fish Department for the construction of a new boating facility at Parker Canyon Lake. The project includes clearing, grading, paving, installation of a vault toilet, dock, gangway, and a concrete boat ramp. Bids are due September 9, 2026, via the State's APP portal. The project estimate is $1,500,000.00 and must comply with Build America, Buy America Act (BABA) requirements. Work is anticipated to begin October 1, 2026, with specific seasonal restrictions between May 24 and September 30.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for BPM007734 Parker Canyon Lake Boating Facility - Attachment E Hazard Communication Program: This document is Attachment E (Section 00450) of Solicitation No. BPM007734 for the Parker Canyon Lake Boating Facility project by the Arizona Game and Fish Department. It provides a template and requirements for the contractor's Hazard Communication Program, covering container labeling, Material Safety Data Sheets (MSDS), employee training, and protocols for informing contractors about hazardous chemicals.
XLSX
XLSX, High priority: read this first2 pages · bid-schedule
HighAI Summary for BPM007734 - Parker Canyon Lake Boating Facility Bid Schedule: Attachment B Bid Schedule for Solicitation No. BPM007734, issued by the Arizona Game and Fish Department for the Parker Canyon Lake Boating Facility project. The document contains a detailed CLIN-style list of 27 base bid items (including mobilization, excavation, concrete, and solar lighting) and Additive Alternate No. 1, requiring unit pricing and total bid extensions from the contractor.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for BPM007734 Parker Canyon Lake Boating Facility - Pre-Bid Conference Questions: This document contains the questions and answers from the pre-bid conference held on September 9, 2026, for solicitation BPM007734 regarding the Parker Canyon Lake Boating Facility. It provides critical technical clarifications on concrete doweling, sidewalk removal lengths, bathroom installation responsibilities, material sourcing for riprap and mulch, and the addition of a traffic control bid item.
DOCX
DOCX, High priority: read this first4 pages · contract-document
HighAI Summary for Exhibit A: Construction Contractor Agreement: A template for a Construction Contractor Agreement between the State of Arizona and a construction firm. It outlines the scope of work, completion timelines, liquidated damages, payment terms, and lists incorporated documents and exhibits including bonds, insurance, and payment waivers.
XLSX
XLSX, High priority: read this first3 pages · bid-schedule
HighAI Summary for IFB BPM007734 - Parker Canyon Lake Boating Facility Bid Schedule: Attachment B Bid Schedule for Solicitation No. BPM007734, issued by the Arizona Game and Fish Department for the Parker Canyon Lake Boating Facility project. The document contains a detailed list of 39 line items for the Base Bid, including excavation, paving, and concrete work, with fields for unit pricing and total extensions. It includes mandatory quantity disclaimers, bid security requirements, and a 90-day bid validity period.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Parker Canyon Boat Ramp Improvement Plans: Construction plan set and general notes for the Parker Canyon Boat Ramp improvements for the Arizona Game & Fish Wildlife & Parks Authority. Dated December 2023, the document includes a sheet index, general notes on materials and workmanship (referencing MAG specs), volume summaries for earthwork and pavement, project benchmarks, and structural sections for roadways and the boat ramp.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Parker Canyon Boat Ramp Project Special Provisions: Revision 1 (June 2025) of the Special Provisions for the Parker Canyon Boat Ramp Project. The document provides technical modifications to MAG Uniform Standard Specifications (2023) and ADOT Standard Specifications (2021), covering clearing and grubbing, roadway and structure excavation, fill construction (including underwater 'Push-In' methods), rock mulch, concrete structures, and various site amenities. It includes specific bid item descriptions and payment terms for excavation and construction activities.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Parker Canyon Lake Boating Facility - Attachment A Offer and Acceptance Form: This document is Attachment A, the Offer and Acceptance Form for the Parker Canyon Lake Boating Facility construction project. It serves as the formal bid submission document where the bidder certifies compliance with non-discrimination and anti-collusion laws, acknowledges receipt of solicitation amendments, and agrees to the contract terms. It includes sections for bidder signatures, bid security details, and a space for the State's formal acceptance of the offer.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Solicitation Amendment 1 - BPM007734 (Parker Canyon Lake Boating Facility): Amendment No. 1 for solicitation BPM007734 regarding the Parker Canyon Lake Boating Facility. Key changes include extending the bid due date to September 16, 2026, adding three additive alternate bid items (211-A, 501-2A, and 505-2A), and revising the Bid Schedule (ATT B). Bidders are required to acknowledge the amendment and re-submit bids via the Arizona Procurement Portal.
PDF
PDF, High priority: read this firstbid-bond
HighAI Summary for Solicitation BPM007734 - Attachment C: Arizona Statutory Bid Bond: Attachment C for Solicitation No. BPM007734 (Parker Canyon Lake Boating Facility), providing the required Arizona Statutory Bid Bond form. This document ensures the Principal provides a bond of at least 10% of the bid amount to guarantee the execution of the contract and the provision of performance and payment bonds.
PDF
PDF, High priority: read this firstaward
HighAI Summary for USDA Forest Service Special Use Permit - Arizona Game and Fish Department (SIE2507): Special Use Permit (Authorization ID: SIE2507) issued by the USDA Forest Service to the Arizona Game and Fish Department for the use of 2.8 acres in the Coronado National Forest. The permit authorizes the construction of a boat ramp, dock, parking lot, and restroom at Parker Canyon Lake, with construction activities planned between 2025 and 2030. The permit expires on 10/01/2045.
XLSX
XLSX, Low priority2 pages · payment-application
LowAI Summary for ADOA Exhibit H - Application for Payment: A standardized two-page payment application form (Exhibit H) used by contractors to request payment from the Owner. It includes a submittal page for certification by the contractor and architect/engineer, and a continuation sheet for the schedule of contract values, including tracking of completed work, stored materials, and retainage. Revision date 2/6/19.
PDF
PDF, Low priorityother
LowAI Summary for ADOA Exhibit S - Authorized Use of Allowance: A template form (Exhibit S) used by contractors to request authorization for the use of allowances. It includes fields for project details, cost breakouts for labor, materials, and equipment, and requires signatures from the Contractor and State Procurement Officer. Version REV 2/7/16.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for Attachment F: Boycott of Israel Disclosure: A mandatory disclosure form required by A.R.S. §35-393.01 for public entities in Arizona. The document requires offerors to certify whether they participate in a boycott of Israel or qualify for an exemption based on contract value, business size, or non-profit status.
PDF
PDF, Low priorityq-and-a
LowAI Summary for BPM007734 Parker Canyon Lake Boating Facility Pre-Bid Conference Questions: This document contains a record of questions and answers from a pre-bid conference held on September 9, 2026, for solicitation BPM007734 regarding the Parker Canyon Lake Boating Facility. It addresses technical clarifications on concrete work, demolition, site materials, bathroom installation, and USFS coordination.
PDF
PDF, Low priorityq-and-a
LowAI Summary for BPM007734 Parker Canyon Lake Boating Facility - Solicitation Questions: A question-and-answer document for Solicitation Number BPM007734 regarding the Parker Canyon Lake Boating Facility project. It provides clarifications on geotechnical reports, rock excavation criteria, biological monitoring responsibilities, material disposal, catch basin specifications, lighting requirements, and water sources for dust control.
PDF
PDF, Low prioritydetermination-and-findings
LowAI Summary for Cancellation Determination - Solicitation BPM007734: Official determination dated October 21, 2026, to cancel solicitation BPM007734 and reject all offers because the bids received exceeded the project budget.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Exhibit K - Substantial Completion Certificate: A template for a Substantial Completion Certificate (Form 8.15, dated 3/29/2021) used by the State of Arizona General Services Division. The document defines substantial completion, establishes the commencement date for warranties, and outlines the transition of responsibilities for maintenance, utilities, and insurance between the Owner and Contractor.
PDF
PDF, Low prioritycontract-document
LowAI Summary for Exhibit L - Final Completion Certificate (State of Arizona): A State of Arizona General Services Division form (Form 8.16) used to certify the final completion of work for a project at 1400 W. Washington St., Phoenix, AZ. It defines 'Final Completion' and provides signature blocks for the Contractor, Design Professional, Project Manager, and Construction Compliance Officer.
PDF
PDF, Low prioritycloseout-checklist
LowAI Summary for Exhibit M – Contractor Project Closeout: A project closeout checklist (Revised 8/15/2019) detailing the required documentation for final project completion. It specifies deliverables for the Contractor (certificates of completion, lien releases, warranties, and record drawings), the Architect/Engineer (as-constructed record drawings), and internal administrative tasks for the Construction Program Specialist.
PDF
PDF, Low prioritylien-waiver
LowAI Summary for Exhibit P1 - Conditional Lien Waiver for Progress Payments: A standard Arizona Conditional Waiver and Release on Progress Payment form (pursuant to A.R.S. 33-1008) used by the State of Arizona General Services Division. This document serves as a legal release of mechanic's liens and payment claims upon receipt and clearance of a specific progress payment.
PDF
PDF, Low prioritylien-waiver
LowAI Summary for Exhibit P2 - Conditional Waiver and Release on Final Payment: A standard Arizona Lien Waiver and Release form used by the State of Arizona General Services Division. This document serves as a conditional release of mechanic's liens and statutory bond rights upon receipt and clearance of final payment for labor, services, equipment, or materials provided for a specific project.
PDF
PDF, Low prioritylien-waiver
LowAI Summary for Exhibit Q - Unconditional Waiver and Release on Final Payment: A standard Arizona Lien Waiver and Release form (pursuant to A.R.S. 33-1008) used for final payment. The document serves as a legal release of mechanic's liens and payment claims upon receipt and clearance of final payment from the State of Arizona.
PDF
PDF, Low prioritybond-template
LowAI Summary for Exhibits N and O - Arizona Statutory Payment and Performance Bond Templates: This document contains two fillable templates for Arizona statutory bonds: Exhibit N (Payment Bond) and Exhibit O (Performance Bond). Both templates are designed to comply with Arizona Revised Statutes (Titles 28, 34, and 41) and require the penalty to be 100% of the contract amount.
LowAI Summary for Parker Canyon Lake Boat Ramp Environmental Assessment Checklist: An environmental assessment checklist for the Arizona Game and Fish Department (AZGFD) regarding the construction of a new two-lane boat launch ramp and parking modifications at Parker Canyon Lake. The project aims to replace a deteriorating single-lane ramp with an ADA-compliant facility to reduce congestion and improve safety. The project involves approximately 2.8 acres of Coronado National Forest land and is funded via Federal Aid (WSFr) and State sources.
XLSX
XLSX, Low priority1 page · sign-in-sheet
LowAI Summary for Sign In Sheet BPM007734 - Parker Canyon Lake Boating Facility: Attendance record for a site visit or meeting held on September 2, 2026, for the Parker Canyon Lake Boating Facility (BPM007734). The document lists representatives from various contracting firms including PCS, Granite, Blue World, Crossroads Development, KE&G Construction, RCI, and Marsh Development.
PDF
PDF, Low prioritysupporting-document
LowAI Summary for Solicitation BPM007734 - Attachment G: Forced Labor of Ethnic Uyghurs Ban: Attachment G for Solicitation No. BPM007734 (Parker Canyon Lake Boating Facility) regarding the Arizona Game and Fish Department. This document is a certification form requiring offerors to certify compliance with A.R.S. § 35-394, prohibiting the use of forced labor of ethnic Uyghurs in the People's Republic of China, with specific exemptions for sole proprietorships, non-profits, or companies with fewer than ten employees.
This project consists of: Constructing a new boating facility at Parker Canyon Lake per engineers plans in Exhibit 2 and special provisions in Exhibit 3.
Clearing and grubbing, grading, paving, installation of a vault toilet, dock and gangway, and the construction of a concrete boat ramp
This is NOT a Davis Bacon Wage project.
This project must comply with Build America, Buy America Act (BABAA) requirements as required by Section 70914 of the Infrastructure Investment and Jobs Act (Pub. L. 117-58). BABAA requirement language is provided in Exhibit 1.
Please note: work MAY NOT be performed between May 24 and Sept 30 due to breeding season restrictions
Work anticipated to begin October 1, 2026
More opportunities from Arizona → Game and Fish Department
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.