Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on July 31, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Partial Excavation Inspection Services

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
SLED
Virginia Zoo - Africa Boardwalk Repairs
Solicitation # 24051
The City of Norfolk Department of Public Works is soliciting lump sum bids for Project 24051, involving repairs to the Africa Boardwalk at the Virginia Zoo located at 3500 Granby Street, Norfolk, VA. The scope of work includes structure demolition and the installation of composite decking, to be executed in phases. All work must comply with the International Building Code 2011, Virginia building codes, and the VirginiaZoo_AfricaWalk_PME Set_260603 plan set. The project must be substantially completed within 445 consecutive calendar days from the receipt of the Notice to Proceed. Bids are due by 4:00 PM on November 12, 2026, and must be submitted electronically via the designated procurement portal. Bidders are required to provide a 5% bid bond, and the successful contractor must furnish performance and payment bonds each totaling 100% of the construction price. Award will be granted to the lowest responsive and responsible bidder, with evaluations focusing on non-collusion compliance, debarment status, and criminal history. Bidders must be authorized to transact business in the Commonwealth of Virginia and provide their Virginia Contractor Registration Class and Number. Contractors are responsible for providing quality-control services and submitting a quality-control plan within 10 days of the Notice of Award. The project mandates strict adherence to packaging and storage standards to prevent material deterioration and requires compliance with ADA-ABA Accessibility Guidelines for temporary egress. Requests for Information must be submitted through the questions portal no later than 4:00 PM on October 19, 2026.
Public Works (D&C)

POSTED

about 4 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The contract titled Partial Excavation Inspection Services involves performing limited excavation around pole bases to assess the condition of wooden structures and evaluate the effectiveness of existing wood treatments. This work is critical for ensuring the structural integrity and longevity of utility poles by identifying signs of decay, moisture damage, or inadequate preservative penetration. The scope includes careful removal of soil to access and inspect the pole bases, followed by thorough backfilling and compaction to restore the surrounding ground to its original stabilizing state. The work is classified under NAICS code 238990 and is structured as a subcontract opportunity issued by the Engineering and Operations agency in California. Interested parties must respond by the deadline of September 2, 2026, with all work expected to be conducted at locations specified by the agency, though exact geographic details are not provided in the solicitation.

General Info

Inspect pole bases via limited excavation to assess decay and treatment effectiveness, restore ground, California subcontract.

Documents

This scope was carved out of CPS 07-26-03.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Wood Pole Inspection, Treatment, and Restoration

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Operations
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform limited excavation at pole bases to evaluate wood condition and treatment effectiveness, followed by backfill and compaction.

More opportunities from California → Engineering and Operations

Same awarding agency

NAICS: 237130
New
SLED
Underground Utility District 38 Overhead-to-Underground Service Conversions
Solicitation # CS 09-26-07
Alameda Municipal Power (AMP) is soliciting bids for the Underground Utility District 38 Overhead-to-Underground Service Conversions project (CS 09-26-07). The primary objective is to safely convert 195 residential electrical services from overhead to underground routing without increasing customer capacity or modernizing existing customer-owned equipment, which will be reused if deemed safe by the City Building Division. The scope includes the installation of approximately 8,389 linear feet of aluminum service conductors across standard and 3-inch lateral locations. The project is expected to start around March 1, 2027, and must be completed within 365 calendar days of the Notice to Proceed. Eligible bidders must possess a valid California C-10 Electrical Contractor license and be registered with the Department of Industrial Relations. A mandatory virtual pre-bid meeting was held on November 5, 2026, and all bids must be submitted via the OpenGov Bid Portal by November 25, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on capacity, experience, and past performance. Required submissions include a 10% bid security, a subcontractor list, and a bid schedule. Once awarded, the contractor must provide performance and payment bonds for 100% of the contract price and adhere to the City of Alameda Project Stabilization Agreement to ensure labor harmony and prevailing wage compliance.
Power and Communication Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 15 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS