Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 17, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PATHWAY SAFETY & SAPR ASSESSMENT

Awarded
N69450-19-R-8419Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Dam Safety Engineering Services – Southern California
Solicitation # 10221501
The California Department of Water Resources, Division of Operations and Maintenance and Dam Safety Services Branch, is soliciting Statements of Qualification for as-needed engineering and related services to support the review, inspection, evaluation, analysis, and oversight of structures associated with the State Water Project. With an estimated total contract range between 30 million and 40 million dollars, the work primarily focuses on the Southern Field Division, Castaic Field Division, and FERC Project Nos. 2426 and 2100, with potential backup support for the Oroville, Delta, and San Luis Field Divisions. Key services include dam performance surveillance, the development of monitoring plans and technical information documents, and specialized inspections involving drones, ROVs, and rope access for various appurtenances such as hydropower plants, spillways, and gates. The contract period is estimated to run from March 2, 2027, to March 1, 2030, with awards based on a most qualified selection process involving panel scoring and interviews. Qualified firms must submit their SOQs by November 17, 2026, and are required to provide a new Generative AI disclosure. Selected contractors must comply with Department of Industrial Relations prevailing wage requirements and provide comprehensive quality control and worker safety programs. Administration is managed by the DWR Contract Manager, with payments issued within 45 days of receiving undisputed invoices following verbal notice of work acceptance.
California Department of Water Resources

POSTED

about 3 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
SLED
Construction, Engineering And Inspection (CEI) Services For The Sands Boulevard And Surfside Boulevard Bridge Repair Projects
Solicitation # 2026-RFP-PW-070-KR
The City of Cape Coral is soliciting proposals for Construction Engineering and Inspection (CEI) services for two federally funded bridge repair projects: the Sands Boulevard Bridge over Eternity Canal and the Surfside Boulevard Bridge over Maxine Canal. The selected engineering firm will provide construction contract administration to restore resiliency to bridge approaches, bulkheads, and shoreline protection. These projects are funded through the FDOT Local Agency Program and must adhere to FDOT manuals, FHWA requirements, and federal-aid compliance standards. The contract duration is 300 calendar days from the Notice to Proceed, and the consultant must be capable of supporting both projects concurrently or independently. The procurement follows a Qualifications-Based Selection process, with proposals due by November 5, 2026. To be responsive, firms must be FDOT prequalified and provide evidence of professional licensure in Florida. Evaluation is conducted by a Selection Advisory Committee based on personnel qualifications, team management, and prior experience. Awarded consultants must provide payment and performance bonds and meet comprehensive insurance requirements for professional and general liability. Compliance mandates include the Davis-Bacon Act, Build America Buy America Act, and specific environmental protections for threatened burrowing owls.
Public Works

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 541330
New
SLED
Avenue 52 And Monroe Street Traffic Signal
Solicitation # 2023-02
The City of La Quinta is soliciting proposals for professional engineering services to support the Avenue 52 and Monroe Street Traffic Signal Project (City Project No. 2023-02). The scope of work involves providing plans, specifications, and engineer's estimates (PS&E), as well as bidding and construction support for a new traffic signal and related intersection improvements. These improvements include signal poles, equipment, signing, striping, roadway modifications, curb ramp improvements, and utility coordination within a multi-jurisdictional area involving the City of La Quinta, the City of Indio, and the County of Riverside. Deliverables include monthly progress reports, topographic surveys, geotechnical pavement reports, and design documents at 35%, 65%, and 90-100% completion, all adhering to California Manual on Uniform Traffic Control Devices (CA MUTCD) standards. Proposals must be submitted in writing by November 17, 2026, with the cost proposal provided in a separate envelope. Evaluation is based on RFP requirements, client references, background checks, and other pertinent research, though the City reserves the right to accept offers other than the lowest. Key compliance requirements include registration with the California Department of Industrial Relations (DIR) and adherence to California prevailing wage laws. The contract includes a 5% performance security retention and requires the contractor to maintain specific insurance and indemnification standards. Invoicing must be submitted by the tenth working day of the month and will be paid within 30 days of approval by the City's Finance Department. Felix De Leon, Senior Civil/Managing Engineer, serves as the primary point of contact.
City of La Quinta

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 541330
New
SLED
Golden Gate Suspension Bridge Seismic Retrofit, Contract 1 North And South Towers And North And South Side Spans Energy Dissipation Device (EDD) Fabrication Inspection Services
Solicitation # 2026-B-038
The Golden Gate Bridge, Highway and Transportation District is soliciting a Professional Services Agreement under RFQ/RFP No. 2026-B-038 for quality assurance inspection and administrative services. The project focuses on the fabrication of Energy Dissipation Devices (EDDs) for the Golden Gate Suspension Bridge Seismic Retrofit, specifically for the North and South Towers and Side Spans. The services will be performed at a fabrication shop located in the Birmingham, Alabama area, with an estimated duration of 37 months starting in early 2027. Key responsibilities include developing and executing Quality Assurance Inspection Work Plans, performing non-destructive testing (NDT) overseen by an ASNT Certified Level III inspector, and providing weekly fabrication reports and material inspection reports. The selection process is a multi-step qualification-based approach where proposers are ranked based on their Statement of Qualifications and Proposals, interviews, and reference checks, followed by cost negotiations with the top-ranked firm. Required personnel include a Contract Manager and Stainless Steel Fabrication Shop Inspectors. The contract is subject to various federal and state regulations, including the Brooks Act, 23 CFR 172, and California Labor Code prevailing wage requirements. Proposers must submit their Statement of Qualifications and Proposal via the District Procurement Portal by December 1, 2026, and must comply with strict non-disclosure agreements and security clearance protocols.
Golden Gate Bridge, Highway and Transportation District

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Engineering Services for the Community Center HVAC Upgrades
Solicitation # RFP 2418
The Township of Wayne, New Jersey, is soliciting proposals under RFP 2418 for professional engineering services to manage HVAC upgrades at the Wayne Township Community Center. The project scope involves the replacement of all existing HVAC equipment, including 22 air handling units, a pool air handler, 19 exhaust fans, and one dedicated outdoor air system, as well as various other units throughout the facility. All new equipment must be integrated into a new Building Management System installed separately by the Township. The selected firm will be responsible for three primary phases: preliminary design, including field verification and cost estimation; final design, consisting of construction documents and a phased bidding plan; and construction administration, which includes bidding support, shop drawing reviews, and final punch list development. Proposals must be submitted electronically via the ProcureNow portal by November 5, 2026, at 11:00 am. The evaluation process uses a points-based system weighted toward cost (40 percent), general technical responsiveness and methodology (30 percent), and management experience and qualifications (30 percent). Bidders are required to provide lump sum pricing for each project phase and a schedule of hourly rates for unforeseen services. The contract duration is up to two years, with the possibility of two one-year extensions. Mandatory submission documents include a statement of interest, firm qualifications, key personnel resumes, a project approach, a W-9, and notarized non-collusion and ownership disclosure affidavits. Awarded contractors must provide a performance bond, certificate of insurance, and EEO compliance documentation within 14 days of receipt.
Purchasing Division

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 541330
New
SLED
Shasta NextGen Railroad Corridor Crossing Plan
Solicitation # S-00048
The Shasta Regional Transportation Agency is soliciting proposals for the Shasta NextGen Railroad Corridor Crossing Plan, a cost-reimbursement project with an estimated budget of 438,680 dollars. The selected consultant will be responsible for identifying safety and mobility challenges at regional railroad crossings through data collection and analysis of collision history and traffic projections. The scope includes developing improvement strategies for rail, transit, and climate resiliency, as well as preparing preliminary designs, with most sites reaching 10 to 15 percent design and a few prioritized sites reaching 30 percent. The project must be completed by February 28, 2029, and the final plan must be delivered in an ADA-accessible electronic format to Caltrans. Proposals are due by 3:00 p.m. PDT on November 9, 2026, and must not exceed 35 pages. Selection is based on a combination of funding availability and the value of services, evaluated via consensus scoring by a panel, with potential interviews for top-ranked candidates. The contract requires strict adherence to federal and state regulations, including 49 CFR Part 26 for Disadvantaged Business Enterprise nondiscrimination, Buy America regulations, and the Fair Employment and Housing Act. Administrative requirements include maintaining accounting systems conforming to Generally Accepted Accounting Principles and submitting itemized invoices via mail rather than email. Consultants must also certify compliance with FTA and FHWA assurances and disclose any organizational conflicts of interest.
Shasta Regional Transportation Agency

POSTED

about 4 hours ago

DEADLINE

in 10 days
NAICS: 541330
New
SLED
On-Call Emergency Bridge And Culvert Engineering Services Storm Damage Response And Repair
Solicitation # 2004
The County of San Luis Obispo is soliciting proposals for Informal RFP #2004 to establish an on-call contract for emergency bridge and culvert engineering services focused on storm damage response and repair. The scope of work includes emergency traffic control plans, surveying and mapping, culvert and drainage design, erosion and scour protection, and bridge repair and foundation design. The selected consultant must provide a single point of contact available seven days a week during declared emergencies and ensure qualified staff are on-site for initial evaluations within 24 hours of a request. The contract is managed through individual task orders, with progress payments made monthly in arrears upon verification of certified payroll and approval by the County's Contract Administrator. Proposals must be submitted as two separate PDF files, consisting of a technical proposal and a cost proposal, by the November 18, 2026, deadline. The technical proposal is subject to specific page limits for the cover letter, organizational chart, experience, and references. Award decisions will be based on identifying the best-qualified firm at a fair and reasonable cost, with a preference for local vendors when other factors are equal. Mandatory requirements include compliance with Title VI of the Civil Rights Act, the Americans with Disabilities Act, and California's Fair Employment Practices Act. Additionally, consultants must maintain insurance for five years following the completion of the work and certify that they will not bid on any construction contracts resulting from the services provided under this agreement.
County Of San Luis Obispo

POSTED

about 4 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The Contractor is tasked with conducting a Pedestrian Safety Study at NAS JRB New Orleans to identify infrastructure deficiencies and provide engineering recommendations for improvement. The primary objective is to mitigate risks and enhance pedestrian safety, with a specific focus on meeting Sexual Assault Prevention and Response (SAPR) requirements. The scope includes evaluating sidewalks, parking lots, and crosswalks for adequacy, circulation, and ADAAG compliance, as well as performing detailed nighttime illumination surveys using digital light meters to ensure visibility standards are met. The project will be executed in four phases: initial information gathering through interviews and town hall meetings, a circulation adequacy study, an illumination study, and the delivery of a final report containing findings, maps, and design requirements. Key deliverables include a Plan of Action and Milestones (POAM) due within 15 days of award, monthly progress reports, and a final comprehensive report. The Contractor must provide qualified personnel, including a project manager with ten years of experience, and is responsible for all equipment and office supplies, while the government will provide necessary CAD and GIS data.

General Info

Contract Value

$248,715

NAICS

541330 - Engineering Services

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Award Notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Southeast
Contacts2 people available
OfficeNAS JACKSONVILLE, FL, 32212-0030, USA
Office AddressNAS JACKSONVILLE, FL, 32212-0030, USA
Contacts
George J. NosserSupervisory Contracting Officer
George SchonhoffADMINISTERING CONTRACTING OFFICER

Full Description

Show more
1.0 Scope of WorkThe Contractor will provide services, including supervision, labor, materials, travel, and per diem (except as otherwise specified herein) to accomplish the tasks defined by this document. The Contractor will closely coordinate its work with PWD NAS JRB New Orleans, the contracting officer and the technical point of contact. Services will be provided according to specific objectives and constraints described as tasks. Tasks and sub-tasks within the Scope of Work may be added, deleted, and re-defined, throughout the designated period-of-performance as necessary to carry out the Client's mission. Any changes will be handled in the form of contract modifications Task 1 Pedestrian Safety Study The goal of this proposal is develop a plan of action for improving pedestrian safety at NAS JRB New Orleans by identifying deficiencies and providing recommendations and preliminary design requirements for improvements to pedestrian facilities to mitigate risks. While comprehensive strategies are typically comprised of the "three E's" (Engineering, Education, and Enforcement), with each playing a role in identifying and implementing effective safety improvements, the focus of this proposal is the engineering aspects of pedestrian safety. The Scope of the Pedestrian Safety Study will consist of gathering information and analyzing current conditions, reporting findings and providing recommendations to improve safety with a focus on SAPR (sexual assault and prevention) requirements. Tasking will be divided into the following phases: Initial Information Gathering Study of Adequacy of Pedestrian Facilities to Support Circulation Study of Adequacy of Illumination for Pedestrian Facilities to meet SAPR recommendations Report of Findings and Recommendations The pedestrian facilities that will be the subject of study are sidewalks, parking lots, crosswalks and associated illumination. Task 1.1 Initial Information Gathering The Contractor will interview designated officials in NAS JRB New Orleans Departments of Public Works, Safety, MWR and Security to identify targeted areas of concern for pedestrian safety. This will include identification of the location of deficiencies that may exist in these areas: Availability of pedestrian facilities. Separation of pedestrian and motor vehicle traffic. Street crossings. Visibility of pedestrians and motorists, including illumination. Condition of pedestrian facilities. Americans with Disabilities Act Accessibility Guidelines (ADAAG) compliance. The Contractor will review available NAS JRB New Orleans pedestrian accident and crime history for the past three years and analyze for trends to identify targeted areas of concern for pedestrian safety. The Contractor will review available NAS JRB New Orleans policies for pedestrian safety and exterior illumination. The Contractor will then take NAS JRB New Orleans policies into consideration in its evaluation of illumination for pedestrians. The Contractor will conduct a town hall meeting at NAS JRB New Orleans to solicit public input to improve pedestrian safety. NAS JRB New Orleans will assist in communicating notice of the town hall meeting to promote participation. The Contractor will meet with designated NAS JRB New Orleans officials to learn of any illumination restrictions that may be imposed by the airfield or other operational requirements, including mandated energy conservation and reduction goals per latest executive orders. The Contractor will then take NAS JRB New Orleans restrictions into consideration in its evaluation of illumination for pedestrians. The Contractor will collect available NAS JRB New Orleans AutoCAD and GIS files of NAS JRB New Orleans, including available information on parking lots, sidewalks and lighting. This electronic information will be used in producing maps to reference the locations of deficiencies during the evaluation process and in the report. Task 1.2 Study of Adequacy of Pedestrian Facilities to Support Circulation The Contractor will survey targeted areas of concern identified through information gathering to determine existing provisions for pedestrian circulation, pedestrian facilities supporting the circulation (parking lots, sidewalks and crosswalks) and needs for improvement. The Contractor will evaluate whether pedestrian facilities are available to support current circulation patterns, and determine the optimal solution. Solutions may include the addition of pedestrian facilities or the rerouting of pedestrian traffic to utilize existing facilities. The Contractor will evaluate whether pedestrian and motor vehicle traffic is adequately separated to promote safety. The Contractor will evaluate whether crosswalks are located in the proper areas, have adequate pavement markings, signage, signal control, sight lines and lighting (illumination further described in Task 3) to promote safe crossing by pedestrians. At areas of pedestrian and motor vehicle conflict, the Contractor will evaluate whether pedestrians and motorists each have adequate visibility of the other, including line of sight and illumination (illumination further described in Task 1.3). The Contractor will evaluate pedestrian facilities and report conditions that present safety issues for pedestrians. Reported conditions may include the raising, settlement, or deterioration of pavement for sidewalks, parking lots and crosswalks. The Contractor will evaluate pedestrian facilities and report instances where facilities fail to meet the Requirements of Americans with Disabilities Act Accessibility Guidelines (ADAAG). Areas evaluated may include ground surfaces, curb ramps, tactile warnings and parking spaces. Task 1.3 Study of Adequacy of Illumination for Pedestrian Facilities The Contractor will survey targeted areas of concern identified through information gathering to determine existing provisions for illumination and needs for improving or adding lights. Inventory and record layout of existing lights in targeted areas of concern. Inventory will include as much of the following information that may be obtained, i.e. location, mounting height, and lamp type, quantity, wattage and voltage. Some of this information may be obtained through interview of designated NAS JRB New Orleans Maintenance Department staff. Survey and record spot checks of illumination in targeted areas of concern using a digital light meter. Analyze collected information by comparing existing conditions to recommendation of the Illuminating Engineering Society (IES) and NAS JRB New Orleans policies, and provide recommendations and preliminary design requirements for improvements to improve or add lights to remedy identified deficiencies. Task 1.4 Report of Findings and Recommendations The Contractor will provide a draft version of its report to NAS JRB New Orleans for review and comment. The Contractor will incorporate comments and produce a final version of the report, which will include the following: An executive summary providing a short, high level synopsis of the findings and recommendations of the study. Written narrative of deficiencies and recommended corrective actions, including preliminary design requirements. Map identifying the location of deficiencies. Representative photographs of deficiencies. Map showing the final recommended pedestrian corridors. Drawings showing the location, type and extent of proposed improvements. - 2.0 Deliverables and Delivery All deliverables will meet professional standards and the requirements set forth in contractual documentation. The Contractor will be responsible for delivering all end items specified. The following items are deliverables, which fall within the scope of this task. 2.1 Plan of Actions and Milestones The Contractor will prepare a Plan of Action and Milestone (POAM) no later than 15 calendar days after contract award. The POAM will include at a minimum, description, responsible party, start and suspense for each action and milestone listed. The list of actions and milestone will include, at a minimum, travel schedule (on site times), proposed interview schedules, and government review periods. 2.2 Progress Reports Progress reports will be submitted to the Client Representative no later than the 15th workday of every month. Progress reports will be submitted on The Contractor letterhead and be accompanied by a copy of that month's invoice. 2.4 Task Reports Submittals for all reports required in the above tasks will include an electronic copy of the draft, and five (5) bound copies of the final submittals. The final submittal will also be provided as a PDF. 2.5 Conduct IPRs In-Progress Reviews (IPR) will be held in person at the Public Works Facility upon the Installation or via Web conference on an as needed basis. The Contractor will provide minutes within seven (7) working days of each IPR; detailing guidance, decisions, and comments discussed. 2.6 Criteria for Acceptance Specific criteria for acceptance of deliverables will be submitted in a professional manner and formatted per Client Representative instructions. 2.7 Schedule Delivery schedule will be established during the POAM development and as agreed to by the Government. Modifications to the milestones during the contract will require approval of the COR. 2.8 Delivery Instructions Specific delivery instructions will be in accordance to the Client Representative unless otherwise specified. 3.0 Personnel Qualifications The Contractor will provide personnel with expertise in the task areas specified in this SOW. 3.1 Skills Personnel assigned to this task will possess the necessary engineering knowledge and analytic skills demonstrating the ability to provide quality service and support in the task areas specified in the SOW. 3.2 Functional Skills Personnel will be capable of working independently and with demonstrated working knowledge and recent experience that demonstrate an ability to provide quality service and support in the task areas specified in the SOW. The lead individual(s) will have a minimum of three (3) year experience in the areas being supervised and the overall project manager will have ten (10) years of experience in all tasks associated with this SOW. 4.0 Government Furnished and Contractor Acquired Resources 4.1 Facilities, Supplies and Services Office space, office supplies, computer equipment and time, telephone, and reproduction facilities will be the responsibility of the Contractor. The Government will be responsible to provide access to all required and available unclassified data. The Government will also provide working space to the Contractor on-site personnel while performing field visits. 4.2 Information The Client Representative will provide the following information: Appropriate CAD Current Installation GIS Related completed studies 4.3 Materials Manuals, texts, briefs and other materials noted in this SOW. 4.4 Orientation Initial familiarization/orientation will be provided by the Client Representative as required. Standard Operational Procedures will be available to the Contractor at the place of performance. 5 Administrative Considerations 5.1 Points of Contact Client Representative (CR): Douglas T. Thompson: contact@example.gov, +1 (555) 000-0000 Alternate: TBD Contracting Representative: TBD Contracting Alternate: TBD 5.2 Clearances Work under this SOW will be UNCLASSIFIED, but may involve privacy issues. The Contractor will abide by all agency rules, procedures and standards of conduct. The CR will provide the Contractor security documentation if necessary. 5.3 Place of Performance All meetings and reviews will be held at either the NAS JRB New Orleans or a site mutually agreed upon by the Technical Point of Contact and The Contractor. All field surveys will take place at NAS JRB New Orleans. 5.4 Hours of Work Work requiring interaction with NAS JRB New Orleans administrative personnel will be scheduled to occur during its normal hours of operation unless otherwise approved by the CR. Illumination studies will be performed at night.

More opportunities from Department Of Defense → Navfacsyscom Southeast

Same awarding agency

NAICS: 221122
New
Federal
Sources Sought for the Recapitalization of the Navy’s High Voltage (230kV) Transmission Loop and all Ancillary Equipment at Naval Submarine Base Kings Bay, GA
Solicitation # N6945027RPW04
The Department of the Navy is seeking qualified sources to perform a wholesale recapitalization and cybersecurity hardening of the 230kV high-voltage transmission loop and all ancillary equipment at Naval Submarine Base Kings Bay, Georgia. This design-build project involves relocating the high power loop and crossing tower to a geotechnically stable site, replacing conductors, and modernizing substation digital protective relays and ground-grid bonding systems. A critical component of the work is the implementation of a secure, encrypted Supervisory Control and Data Acquisition (SCADA) system and the installation of smart motor-operated disconnects and circuit breakers. The modernized grid must remain under Navy operational control while maintaining seamless, safe interconnection and telemetry data exchange with the regional utility provider, Georgia Power Company. The estimated magnitude of this procurement is between 100 million and 250 million dollars, with an anticipated period of performance of approximately 900 calendar days. Due to the sensitive nature of the installation, the project requires strict adherence to NERC CIP and DoD UFC 4-010-06 cybersecurity standards, as well as compliance with Executive Order 14421 and various FAR and DFARS supply chain provenance regulations. Key personnel must possess a minimum Tier 3/Secret security clearance and be capable of operating within high-security military zones. Interested parties under NAICS 221122 must demonstrate significant financial capability, including the ability to bond a single project at 200 million dollars, and provide evidence of experience in high-voltage interconnections and secure supply chain management.
Electric Power Distribution

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 1131
New
Federal
TIMBER SALE at Naval Air Station Meridian (MAIN BASE) Lauderdale County, Mississippi
Solicitation # N69450-27-RP-00022
The Department of the Navy, through Navfacsyscom Southeast, is soliciting bids for the purchase and removal of merchantable timber on approximately 118 acres at Naval Air Station Meridian's Main Base in Lauderdale County, Mississippi. This is a per unit ton sale conducted as an Invitation for Bids, where the contract will be awarded to the responsible purchaser providing the highest bid. The scope of work includes the felling and removal of various timber products, including significant volumes of Pine Sawtimber, Hardwood Pulpwood, and Pine Topwood, among others. The term of the contract is 18 months from the date of award, and the property is offered on an as is and where is basis. Bidders must submit paper bids by November 12, 2026, including a bid deposit of at least 20 percent of the full bid price. The successful purchaser is required to provide a performance bond equal to 10 percent of the contract price within ten days of the award. Comprehensive insurance requirements are mandatory, including one million dollars in general liability and specific automobile and worker's compensation coverage. Personnel must be state certified loggers with First Aid and CPR certifications and must provide proof of U.S. citizenship or legal residency for base access. All operations must adhere to Best Management Practices for environmental protection and require the submission of an Accident Prevention Plan and Activity Hazard Analysis.
Timber Tract Operations

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 334512
New
Federal
Facility Related Control System (FRCS) Programable Building Controllers Naval Air Station (NAS) Corpus Christi, TX
Solicitation # N6945027RPW03
Navfacsyscom Southeast is conducting a sources sought notice under solicitation N6945027RPW03 to identify commercially available programmable building controllers for the Facility Related Control Systems at Naval Air Station Corpus Christi, Texas. The primary objective is to determine the availability of controllers that can fully interface with the government licensed Johnson Controls Facility Explorer (JCI FX) 80/90 software for programming, database, graphics, and configuration. Required hardware must function as a Network Automation Engine and support BACnet and Modbus TPC/IP communication protocols. Interested vendors must submit a capabilities statement package not exceeding five pages by 2:00 PM Eastern Time on November 18, 2026. The submission must include completed company information and technical data, specifically a list of compatible controllers and documentation of one to three installed HVAC systems where JCI FX 80/90 was used to configure non-JCI controllers. Responses must be sent electronically to [email hidden] with a maximum attachment size of 4MB. All potential contractors must be registered in the System for Awards Management (SAM) and provide their CAGE and NAICS codes.
Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use

POSTED

2 days ago

DEADLINE

in 19 days
View Details
NAICS: 6221
New
Federal
Solicitation for Offers - Office/Medical Space Approximately 12,000 Rentable Square Feet (RSF) in Crestview, FL
Solicitation # N69450-27-RP-00023
The Department of the Navy, through the Naval Facilities Engineering Systems Command Southeast, is soliciting offers for approximately 12,000 rentable square feet of office and medical space in Crestview, Florida, to support Defense Health Agency medical provider requirements. The required space must be located within zip codes 32536 or 32539. The anticipated lease structure consists of an initial one-year term with 19 consecutive one-year renewal options, for a total duration not to exceed 20 years, with a target commencement date of September 30, 2027. The government will award the contract based on Best Value Trade-Off procedures, weighing technical factors and price with approximately equal importance. Key technical evaluation criteria include proximity to Eglin Air Force Base, the ability to meet the full square footage requirement at a single property, and the provision of at least 117 parking spaces, including five disabled spaces. Facilities must be single-story, meet ADA and NFPA 101 life safety codes, and buildings exceeding 10,000 square feet must be Energy Star certified or provide a renovation plan. Offerors must submit signed proposals electronically by November 16, 2026. Required documentation includes certifications regarding responsibility matters, SAM registration, and specific representations regarding small business status under NAICS code 531190. The lessor is expected to accept tenant improvements for medical use and ensure the premises are free of asbestos, except where managed under EPA guidance. Access to the facility is required 24 hours a day, 7 days a week.
General Medical and Surgical Hospitals

POSTED

2 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS