Patton Parkway Water Main OW-2502
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation of 3,230 linear feet of C900 PVC water main and an additional 3,360 linear feet of 8-inch C900 PVC water main to expand or upgrade the water distribution system in Marina, California. Alongside the piping, a pressure-reducing and metering station will be constructed within a pre-cast concrete vault, equipped with all necessary fittings, valves, and appurtenances to ensure proper system operation and flow control. The work is under the jurisdiction of the Marina Coast Water District and is designated as a forecasted procurement with no set-aside classification, indicating it is open to general competition. All work will be performed at the specified location in Marina, with a zip code of 93933, and all correspondence and inquiries should be directed to Remleh Scherzinger, the General Manager, via the provided phone number and email address. The contract opportunity was posted on August 20, 2025, and further details can be accessed through the California Environmental Quality Act portal.
General Info
Agency
NAICS
Place of Performance
Patton Parkway and Crescent Street, Marina, CA, 93933Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
