Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PEDESTRIAN CROSSWALK-EASTRIDGE TRANSIT CENTER

Closed
C25260State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Opportunity to quote asphalt repairs_Laura Street Sewer Improvements Project
Solicitation # opportunity-quote-asphalt-repairslaura-street-sewer-improvements-project
D.R. Phillips, LLC is seeking competitive subcontractor quotes for asphalt repairs associated with the Laura Street Sewer Improvements project located in Robbinsville, North Carolina. This solicitation is for bidding purposes to assist the prime contractor in preparing their project bid and is not a formal subcontract agreement. The scope of work includes asphalt pavement replacement, restoration, milling, removal, and the placement of surface and binder courses. Additionally, contractors will be responsible for pavement patching, trench restoration, hauling, compaction, and the application of tack coats, along with other incidental asphalt work necessary for project completion. Interested contractors must submit their proposals by November 27, 2026, via email to Shane Phillips. Submissions must include company contact information, itemized pricing, equipment and workforce availability, and evidence of relevant experience with municipal sewer, utility, and roadway restoration projects. While all qualified contractors are encouraged to apply, there is a specific emphasis on participation from SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses, as well as DBE and MBE certified firms. Project plans and specifications are available upon request, and a quick payment agreement will be included for the selected contractor.
D.R. Phillips, LLC

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additionally, the project requires surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services like storm water pollution prevention. Required materials range from ready mix and precast concrete to manhole materials and various valves and gaskets. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. The response deadline is December 16, 2026, and interested parties should coordinate through Lead Estimator Ken Johnston via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
Multi-Purpose Path along Barlow Road (Phase 2)
Solicitation # 50012
The City of Hudson, Ohio, is soliciting bids for Phase 2 of the Multi-Purpose Path along Barlow Road in Summit County. The project scope involves the installation of approximately 200 lineal feet of seven-foot wide Class C concrete trail, along with grading, pavement striping, storm improvements, and road improvements. Depending on necessity, railroad improvements may also be required. Technical execution must adhere to a hierarchy of standards, prioritizing City of Hudson plans and engineering standards, followed by Norfolk Southern and ODOT Construction and Material Specifications. Specific requirements include the use of ADA-compliant brick red truncated domes for curb ramps and Type 1 fast dry, water-based acrylic paint for pavement markings. Bids must be submitted electronically via Bid Express by December 8, 2026. The contract will be awarded to the lowest and best bidder based on compliance, financial ability, and a minimum of three years of experience in similar projects. The successful contractor must provide a performance bond, payment bonds, and three specific insurance policies. Labor must be compensated according to Summit County prevailing wage rates per Ohio Revised Code Chapter 4115. The deadline for substantial completion of Phase 2, including all punch list items, is April 30, 2027, with liquidated damages of 1,000 dollars per day for delays and 500 dollars per event for non-notification.
City of Hudson

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
American Legion Bridge and I-270 Multimodal Corridor Presolicitation Information Memorandum
Solicitation # BPM059773
The Maryland Department of Transportation State Highway Administration is issuing a Presolicitation Information Memorandum for the American Legion Bridge and I-270 Multimodal Corridor project. This proposed Public-Private Partnership utilizes a Design-Build-Finance-Operate-Maintain structure to implement significant corridor improvements. The technical scope involves adding two new High Occupancy Toll managed lanes in each direction on I-495 from the Virginia border to the I-270 west spur, and converting one existing HOV lane to a HOT lane while adding one new HOT lane in each direction on the I-270 west spur. The project aims to enhance trip reliability, reduce travel times, and improve multimodal options while adhering to the August 2022 federal Record of Decision. The procurement process is intended to follow a best-value determination approach using trade-off analysis, beginning with a Request for Qualifications to establish a shortlist before soliciting final technical and financial proposals. While this is a preliminary memorandum to gather industry input, the framework specifies that the developer will be responsible for all design and construction work, including the provision of performance and payment bonds. Funding for the project is structured to be payable solely from collected toll revenues or appropriations from the Maryland General Assembly. Interested parties must submit a One-on-One Meeting Request Form by December 18, 2026, to engage in market-sounding meetings.

POSTED

about 3 hours ago

DEADLINE

in about 1 year
NAICS: 237310
New
SLED
Downtown Two-Way Conversion and Broadway Improvements
Solicitation # 26-120
The City of Aurora, IL, is soliciting bids for the Downtown Two-Way Conversion and Broadway Improvements project, a major infrastructure initiative located in Kane County. The scope of work covers 1.69 miles of improvements, primarily focusing on converting New York Street and Galena Boulevard from one-way couplets to two-way operations and reducing through lanes on Broadway (IL 25) south of Galena Blvd. Key deliverables include roadway resurfacing, HMA paving, sidewalk reconstruction with decorative elements, traffic signal modifications, signing, striping, and landscaping. The project must adhere to the State of Illinois Standard Specifications for Road and Bridge Construction, District One Standard Traffic Signal Design Details, and 2012 ADA Standards for Accessibility. The contract will be awarded to the lowest responsive and responsible bidder, with evaluations based on performance history, resource adequacy, and the ability to meet timeframes. Bidders must submit via the OpenGov portal by December 2, 2026, and provide a bid guarantee of at least 5% of the total bid. Successful contractors must provide performance and payment bonds for 100% of the contract sum and comply with prevailing wage laws, Business Enterprise Program (BEP) utilization requirements, and apprenticeship goals of 10% for projects over $500,000. Notably, the contract includes an Illinois Non-Appropriation Clause, allowing for cancellation without penalty if funds are not approved, and requires a city-generated Purchase Order before any work begins or payments are issued.
Engineering

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1
Solicitation # 80121
The Lincoln Village Neighborhood Street Rehabilitation Project - Phase 1 is a solicitation issued by the City of Rancho Cordova, California, for pedestrian improvements across numerous designated streets including Lincoln Village Drive, Explorer Drive, Vanguard Drive, and Nebula Way. The scope of work involves furnishing all labor, materials, and equipment for tasks such as vegetation clearing, the removal of existing drop inlets, and construction staking. All work must adhere to the County of Sacramento Standard Construction Specifications (January 2016), 2025 Caltrans Standard Plans and Specifications, and ADA, Title 24, and City of Rancho Cordova standards for sidewalk and ramp improvements. The project has a completion timeline of 145 working days from the issuance of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals using official Public Works Department forms, accompanied by a bid bond or security totaling 10% of the aggregate bid sum. Required documentation includes a Non-Collusion Affidavit, an Experience/Qualifications Statement, and a Debarment and Suspension Certification. Successful contractors must provide Material and Labor Payment and Performance Bonds for 100% of the contract price and comply with California Department of Industrial Relations prevailing wage determinations. Project management requires daily progress reports submitted via the Virtual Project Manager (VPM) website, and the final acceptance of work is subject to the approval of the City Engineer.
City of Rancho Cordova

POSTED

about 5 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Santa Clara Valley Transportation Authority (VTA) is soliciting bids under IFB C25260 for the construction of a pedestrian crosswalk at the Eastridge Transit Center in San Jose, California. The project requires the contractor to provide all labor, materials, equipment, and supervision to install new pedestrian infrastructure, including 215 square feet of concrete sidewalks, 85 linear feet of curb and gutter, five curb ramps, 130 square feet of yellow detectable warning surfaces, and 525 linear feet of thermoplastic striping. The scope also includes the removal of existing concrete sidewalks, bus pad pavement, and fencing, as well as the application of eight tons of hot mix asphalt. Work will be performed within an operating rail yard and adjacent to existing shop facilities, requiring strict adherence to safety protocols to ensure the continuing operations of the light rail system. All construction must comply with Caltrans Standard Plans (2024 Edition) and City of San Jose Standard Details R-12, with specific technical requirements for curb ramp counter slopes and gutter pan slopes. Bidders must submit their proposals electronically by May 5, 2026, including a base bid and optional work items. The contractor is responsible for submitting traffic control plans for engineer approval and maintaining a QC/QA program as part of the project deliverables.

Documents

4
XLSX, High priority: read this firstbid-form
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this firsttechnical-specifications
High
PDF, High priority: read this firstcontract-drawings
High

Read all 4 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Engineering and Program Delivery
Contacts2 people available
OfficeSan Jose, CA, 95134, USA

Interested Companies (19)

Bear Electrical SolutionsAlviso, California
BidamericaSheridan, WY
Bowman & Williams - Civil Engineers and Land SurveyorsSoquel, CA

See All 19 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
General work description: The Santa Clara Valley Transportation Authority (VTA) will be soliciting an Invitation for Bids (IFB) for "Pedestrian Crosswalk-Eastridge Transit Center" (Project). For purposes of this Contract, Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to provide pedestrian crosswalk at Eastridge Transit Center. The Work will be conducted within an operating rail yard and adjacent to and within existing shop facilities. This Work will be subject to restrictions to ensure safety and the continuing operations of the yard and shop and the light rail system.

More opportunities from California → Engineering and Program Delivery

Same awarding agency

NAICS: 238210
New
SLED
Cerone Security Enhancements
Solicitation # C26102
The Santa Clara Valley Transportation Authority is soliciting bids for the Cerone Security Enhancements project, solicitation number C26102, to implement comprehensive security upgrades at the Cerone main entrance. The scope of work includes the installation of 10-foot tall chain link fencing, vehicular swing gates, manual and pedestrian gates, and a suite of electronic security systems comprising CCTV cameras, card readers, and an intercom system. Additionally, the contractor is responsible for all necessary electrical infrastructure, communications integration, and the installation of traffic detector loops for the swing gates. The project is estimated to be valued between 690,000.00 and 935,000.00 dollars. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. Bidders must hold Class A or B and C-10 electrical licenses and comply with various regulatory requirements, including the Davis-Bacon Act, Buy America, and California Labor Code prevailing wage laws. Key deadlines have been adjusted via addenda, with the final bid submission due by December 17, 2026. Performance is subject to strict quality standards, including Caltrans and ASTM specifications, and requires the use of an independent testing agency for materials and installation verification. All materials must be delivered FOB Destination to VTA locations.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 19 hours ago

DEADLINE

in 2 months
View Details
NAICS: 236220
SLED
Pre-Qualification: Guadalupe Division - Guard House
Solicitation # C26146F Pre-Qual
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C26146F, the Guadalupe Division Guard House project. This effort is a mandatory preliminary step to establish a list of qualified bidders for a subsequent Invitation for Bids. The project involves the installation of a pre-fabricated guard house at the Younger Avenue entrance, including a base bid for road expansion, a concrete slab, electrical and data utilities, guard gates, bollards, CCTV, exterior lighting, and accessible walkways. An optional component includes the procurement and installation of the guard house itself along with water and sewer connections. The estimated contract value ranges from 591,000 dollars for the base bid to 1.85 million dollars including Option 1, with an estimated construction duration of 267 calendar days. To be eligible, bidders must hold a California contractor's license with classifications Class B, C-10, C-7, and C-36, though specialty requirements may be met through licensed subcontractors. The pre-qualification process requires the submission of a completed questionnaire, a Statement of Qualification Certification Form, audited financial statements, and notarized bonding information. Evaluation is based on a pass/fail assessment of essential requirements and a scoring system for project experience and interviews, where a minimum score of 55 is required to avoid disqualification. Because the project is federally funded, all materials must comply with Buy America provisions. The response deadline for pre-qualification is November 30, 2026, with the final bid opening anticipated for January 2027.
Commercial and Institutional Building Construction

POSTED

11 days ago

DEADLINE

in 13 days
View Details
NAICS: 811192
SLED
Pre-Qualification: Guadalupe Light Rail Vehicle Wash Improvements
Solicitation # C25134F
The Santa Clara Valley Transportation Authority is soliciting pre-qualifications for Contract C25134F, the Guadalupe Light Rail Vehicle Wash Improvements project. This project involves the removal and replacement of the existing Light Rail Vehicle wash system at Building F of the Guadalupe Division with a new hybrid drive-through and gantry wash system. The scope of work is comprehensive, encompassing civil and trackwork, electrical installations, plumbing, structural work for a new prefabricated canopy, and the installation of industrial equipment including a water reclamation and filtration system. The estimated construction cost for the project is between 4.5 million and 5.5 million dollars. To be eligible for the subsequent Invitation for Bid, bidders must be approved through this pre-qualification process by submitting a completed qualification questionnaire and a Statement of Qualifications. Key eligibility requirements include possessing a California contractor's license with at least 10 years of experience as a Class A or B general contractor. Evaluation is based on essential requirements, organizational performance scoring, and project experience interviews. Bidders must also provide proof of bonding capacity, maintain specific liability and workers compensation insurance, and ensure all entities and subcontractors are registered with the California Department of Industrial Relations. The final deadline for pre-qualification submissions is December 23, 2026, at 2:00 pm PT.
Car Washes

POSTED

12 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
SLED
Pre-Qualification: Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East
Solicitation # C26152F
The Santa Clara Valley Transportation Authority (VTA) is soliciting pre-qualifications for the Overhead Contact System (OCS) Rehabilitation Project Phase 4A – Tasman West/East (Contract C26152F). This project, with an estimated construction cost between 1.7 million and 2.3 million dollars, involves the detailed engineering design, procurement, and installation of new 300 kcmil contact wire, registration insulators, in-span insulators, and surge arresters along Tasman Drive and East Java Drive. Work will be performed in an active light rail operating environment, requiring strict adherence to VTA safety procedures and close coordination to minimize service interruptions, particularly near the agency's only LRV wash facility. To be eligible to submit a sealed bid, firms must be approved through a two-stage pre-qualification process. Applicants must submit a completed qualification questionnaire and a Statement of Qualification Certification Form via the VTA eProcurement portal by December 14, 2026. Minimum requirements include the successful installation of at least 5 miles of OCS for a mainline electrification railroad or urban transit system within the last 10 years, with each contract valued at a minimum of 800,000 dollars. Management and supervisory personnel must also possess equivalent experience. Qualification is determined by a scoring matrix, where scores below 55 result in disqualification, and scores of 72 or higher on two interviews are sufficient for approval. Final contract award will be granted to the lowest responsive and responsible bidder.
Power and Communication Line and Related Structures Construction

POSTED

12 days ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS