Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Pepper 210 Commerce Center

Forecast
forecast_469987f5-7fb2-4a88-84b1-fd2aaf0ad22bState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Highland Avenue and Pepper Avenue, Rialto, CA, 92377

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

T&B PlanningIrvine, CA

Full Description

Show more
The Project would redevelop an approximately 101-acre former aggregate mine that operates as an aggregate stockpiling, production, and sales facility under existing conditions. The Project would provide for the construction and operation of a warehouse distribution center with up to 1.865 million square feet of building floor area. Discretionary approvals required from the Lead Agency (San Bernardino County) include a Land Use Category Change (General Plan Amendment), Zoning District Amendment, Specific Plan, Conditional Use Permit, and Development Agreement.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC) is a competitive Indefinite Delivery Indefinite Quantity (IDIQ) solicitation (FA8137-26-R-0040) for general construction services. The contract has a total aggregate maximum value of 950 million dollars over a ten-year period, consisting of a five-year base period and one five-year option. The scope of work encompasses a broad range of sustainment, maintenance, repair, alteration, renovation, and minor construction projects for real property facilities at Tinker AFB, Oklahoma. Project execution is categorized into three methods: Design-Build, Construction with Limited Design, and Construction Only. The government is utilizing a Highest Technically Rated Offeror (HTRO) source selection process based on a Minimum Technical Threshold Rating (MTTR). Offerors are evaluated across four key sections: relevant construction experience, design experience, certifications/licenses, and staffing. To be eligible for award, offerors must meet specific point thresholds, with 8,190 points required for the Small Business pool and 7,140 points for the Full and Open pool. The solicitation is a partial small business set-aside under NAICS 236210. Key administrative requirements include mandatory registration in the System for Award Management (SAM.gov) and compliance with CMMC Level 1 cybersecurity standards. Performance and payment bonds are required at 100 percent of the original contract price. Proposals must be submitted electronically to the designated MACC Workflow Org Box by November 30, 2026. While the solicitation is active, funds are anticipated to become available in FY27, at which point task orders will be issued.
FA8137 Afsc Pzioc

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 236210
New
SLED
HOR-2026-001-CMR-RFQ
Solicitation # 49965
Horizon/McClellan LLC is seeking a highly qualified Construction Manager at Risk (CMR) for the redevelopment of a 3.33-acre site at 160 William F. McClellan Highway in East Boston. The project involves the construction of an approximately 150,000 square foot, 2-story warehouse with an estimated value of $75,000,000. This facility will serve as a consolidated receiving and distribution center for Marketplace CRDC, LLC, and will include specialized features such as truck docks, refrigeration, freezers, and vehicle chargers for heavy-duty trucks and automobiles. The project must be executed in accordance with M.G.L. Chapter 149A, Massport’s Construction Management At-Risk Procedures dated January 2026, and a Project Labor Agreement. The selection process is a two-phase procurement. Phase I focuses on qualifications, where firms are evaluated on their proposed team, collaborative experience, budget discipline, and expertise in Virtual Design and Construction (VDC) and LEAN construction. Mandatory requirements include DCAMM certification, a surety letter confirming bonding capacity for 110% of the construction estimate, and a signed legal attestation. Shortlisted firms will proceed to Phase II to submit technical and pricing proposals. The project timeline targets a preconstruction services contract in January 2027, the start of construction in Spring 2027, and substantial completion in 2028. Submissions are due by November 25, 2026, via Bid Express.
Horizon/McClellan LLC

POSTED

3 days ago

DEADLINE

in 11 days
View Details
NAICS: 236210
New
Federal
Travis AFB MACC
Solicitation # FA4427SourcesSought
The 60th Contracting Squadron is conducting a sources sought notice to explore the establishment of a Multiple Award Construction Contract (MACC) at Travis Air Force Base, California. This proposed Indefinite-Delivery/Indefinite-Quantity (IDIQ) vehicle will have a total potential value of $100,000,000 over a five-year ordering period, with the possibility of up to five 12-month option periods. The contract will utilize firm-fixed-price task orders, each valued up to $10,000,000, awarded through a competitive process among MACC holders. The scope of work encompasses a wide array of construction tasks, including design-build and progressive design-build projects, renovations, new construction, and the repair or replacement of critical infrastructure such as runways, taxiways, and roadways. Required trades include carpentry, demolition, mechanical, electrical, plumbing, concrete masonry, welding, and paving, with a strong emphasis on full-project design capabilities. The government is specifically seeking capability statements from various small business categories, including 8(a), Women Owned, Veteran Owned, Service-Disabled Veteran Owned, and HUBZone firms, to determine the appropriate level of competition. The anticipated NAICS code is 236220 for Commercial and Institutional Building Construction, with a size standard of $45 million. Interested firms must submit a capability statement of no more than 12 pages to TSgt Stephen Platt via email. This statement must include company identification, socio-economic status, evidence of the ability to manage two to four concurrent projects, past performance summaries, and bonding capacity. This notice is for market research and acquisition planning purposes only and does not constitute a formal solicitation or a commitment to award a contract.
FA4427 60 Cons Lgc

POSTED

4 days ago

DEADLINE

in 26 days
View Details
NAICS: 236210
New
SLED
2027 Airfield Project - Contract 1
Solicitation # MC-0322839
The 2027 Airfield Projects – Contract 1, managed by the Aviation Project Management Group for the Port of Seattle, focuses on the replacement and upgrade of critical infrastructure within the Runway 34L-16R complex and Taxiway T at the Seattle-Tacoma International Airport. The scope of work is divided into AIP Eligible (Bid Schedule A) and Non-AIP Eligible (Bid Schedule B) tasks, encompassing seventeen primary work areas. Key deliverables include the installation of new LED airfield lighting and upgraded Constant Current Regulators, the replacement of water mains and flush fire hydrant pits, the installation of access control infrastructure at an airfield gate, and the surfacing of maintenance roads with asphalt and crushed aggregate. All work must adhere to FAA lighting performance requirements and Port of Seattle standards. Administrative requirements mandate that bids be submitted electronically by December 16, 2026, including a bid guarantee of at least five percent of the total bid. The successful contractor must provide performance and payment bonds for the full contract sum and maintain insurance certificates. Compliance with the Buy American/America certification, 2010 ADA Standards, and Washington State prevailing wage laws is required. The project emphasizes small business outreach for Minority, Women, and Disadvantaged Business Enterprises (MWDBE). Quality control is the contractor's responsibility, while the Resident Project Representative (RPR) oversees inspection and final acceptance. Specific technical standards are enforced for material handling, including strict temperature and humidity controls for epoxy adhesives and detailed labeling requirements for electrical and communication cabling.
Aviation Project Management Group

POSTED

4 days ago

DEADLINE

in about 1 month
View Details

More opportunities from California → San Bernardino County

Same awarding agency

NAICS: 237210
SLED
TTM 20443 Lovemore Ranch
Solicitation # PROJ-2021-00169
Merrell-Johnson Companies, acting on behalf of Lovemore Investments LLC, is seeking approval for Tentative Tract Map No. 20443 to subdivide an 18.49-acre parcel in Joshua Tree, San Bernardino County, into 64 single-family residential lots and two lettered lots for open space and recreational facilities totaling 2.75 acres. The project includes the development of five private internal streets with primary access via Hillview Road. The scope of work encompasses grading, vegetation removal, and the installation of stormwater infrastructure, all of which must comply with the San Bernardino County Development Code, the Countywide Policy Plan 2020, and California Title 24 building energy efficiency standards. The project is subject to rigorous environmental oversight under the California Environmental Quality Act (CEQA), featuring a recirculated Initial Study and Mitigated Negative Declaration to address court-mandated updates to hydrology and stormwater impact assessments. Key requirements include obtaining an Incidental Take Permit from the California Department of Fish and Wildlife, conducting pre-construction surveys for desert tortoises, burrowing owls, and nesting birds, and employing both Native American and paleontological monitors during ground-disturbing activities. Technical compliance is measured by the San Bernardino County Hydrology Manual, requiring post-development peak flows to be no more than 90 percent of pre-development levels. Administrative oversight is managed by the San Bernardino County Land Use Services Department, with a public review period conducted from August 3 to September 2, 2026.
Land Subdivision

POSTED

9 days ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS