San Francisco Gateway Project

Awarded
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Francisco Gateway Project, managed by the San Francisco Planning Department and applicant Prologis L.P., involves the redevelopment of a site in the Bayview neighborhood at 749 Toland Street and 2000 McKinnon Avenue. The scope of work includes the demolition of four existing single-story production, distribution, and repair (PDR) structures totaling 448,000 square feet and the construction of two new three-story PDR buildings. These new structures will provide approximately 1,646,000 gross square feet of enclosed floor area, expanding to 2,160,000 gross square feet when including active roofs. The project is classified under NAICS code 236210 and has been processed under Case No. 2015-012491ENV, with final environmental certification and approval occurring in late 2025 in compliance with the California Environmental Quality Act (CEQA). The development features extensive infrastructure and parking, including 543,500 gross square feet of parking space accommodating 1,125 standard automobile spaces and 116 bicycle spaces. Each building will include 36 loading dock doors on the first level with additional tenant-specific loading on upper floors. Site improvements include 217 on-street parking stalls, new sidewalks ranging from 10 to 18 feet in width, and 14 new curb cuts. Additional streetscape enhancements consist of street trees, mid-block bulbouts with planters, improved vehicular travel lanes, a new curb and gutter system, and localized roadway resurfacing. Primary administrative oversight is provided by Senior Planner Elizabeth White and the San Francisco Planning Department.

General Info

Demolish four PDR buildings, construct two new three-story PDR buildings with 2.16M sq ft total, parking, loading docks, and streetscape improvements in Bayview, San Francisco.

Agency

California → City and County of San Francisco

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

749 Toland Street/2000 McKinnon Avenue, San Francisco, CA

Set-Aside

NONE

Documents

(2)

2015-012491ENV San Francisco Gateway Project Notice of Determination

PDFnotice-of-determination

2015-012491ENV San Francisco Gateway Project Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts2 people available
OfficeN/A
Organization / Agency
California → City and County of San Francisco
Office AddressN/A
Contacts
Elizabeth WhiteSenior Planner
Courtney BellProject Applicant

Full Description

Show more
The project site is currently occupied by four single-story structures totaling approximately 448,000 square feet of production, distribution, and repair (PDR) space. The project would demolish the existing PDR buildings onsite and construct two new multi-story PDR buildings that would provide new PDR space in the industrial area of San Francisco's Bayview neighborhood. The two three-story buildings would total approximately 1,646,000 gross square feet of enclosed floor area, or 2,160,000 gross square feet including active roofs. The project would construct new sidewalks along the site's perimeter, including Selby Street, and would create seven new curb cuts for access to each new building (14 in total). The project also would include a total of approximately 543,500 gross square feet of parking, on the first story and an active roof of each building. Approximately 1,125 parking spaces for standard automobiles would be provided, and each building would include 36 loading dock doors at level 1 with additional tenant-specific loading on the upper levels. The Project would provide 116 bicycle parking spaces in total: 100 Class 1 and 16 Class 2 spaces. Proposed on-street parking would consist of 217 diagonal and parallel striped parking stalls. In addition to sidewalks from between 10 and 16 feet wide (18-feet wide in two locations), the project would also provide streetscape improvements to the streets immediately adjacent to the project site, including street trees, mid-block bulbouts with planters, driveways and associated curb cuts, improved vehicular travel lanes and a curb and gutter system, and resurfacing the roadway in several places.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
Federal
Leavenworth VA Decommissioning
Solicitation # 36C77026R0015
The Department of Veterans Affairs, NCO-15 CMOP division, is soliciting a construction contract for the decommissioning of the Leavenworth VA CMOP facility located at 5000 S 13th St, Leavenworth, KS. This project is a total set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSB) with an estimated construction magnitude between $500,000 and $1,000,000. The scope of work involves the disassembly, demolition, and disposal of Automated Prescription Fulfillment System (APFS) equipment, conveyors, and electrical systems, as well as general building repairs and the decommissioning of a central vacuum system. A key requirement includes providing 5,000 to 10,000 square feet of off-site storage near the Shawnee CMOP to facilitate federal equipment excessing procedures. The contract utilizes a Best Value Tradeoff source selection process, where non-price factors—including technical approach, construction experience, and staff qualifications—are significantly more important than price. The total performance period is 365 calendar days, though the government intends for the actual decommissioning to be completed within 60 days of the Notice to Proceed. Contractors must adhere to strict GSA guidelines for inventory and photography, as well as manufacturer standards for the packaging and palletization of electronic and robotic components to prevent damage. The response deadline is September 23, 2026, at 17:00 Central.
National Cmop Office (36C770)

POSTED

4 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS