Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Project will perform the following: 1].Replace 1-each 15.0-Ton Package A/C unit and 1-each 2.5 Ton split type A/C unit complete with spring vibration isolators and condensate drain lines, programmable thermostat, temperature sensors and all ship loose components, 2].Replace affected supply/return exterior ducting/cladding and flexible duct connector 3.] Remove and install 1-each VAV 4.] Remove and Install new Built-Up Roof system (BUR) including wood nailer, cant strips, insulation, plies, asphalt primer and smooth surface. Apply elastomeric coating to newly installed Built up Roofing. Also 1] Remove existing 500KW Generator including ATS, cables, hardwares and other accessories; 2] Cut / break / remove existing CMU wall for generator removal / installation access and re-construct after installation work completed; 3] Provide and install new 600KW diesel engine generator including ATS, cables, hardwares and other accessories; 4] Install 1-each new 350 gallons above ground diesel fuel storage tank, 1-each fuel pump (1-hp) complete with corrosion resistant pipings approximately 100-lf, support / brace, and hangers and; 5] Re-painting of restored CMU wall.