Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Phase 2 Polk Building Renovations

Closed
PSUT-26-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for the comprehensive interior modernization of Building 262, with potential options for Buildings 261 and 263. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces through repainting and the removal of vinyl wall coverings. Technical upgrades involve installing raised flooring, updating electrical distribution with simple dimming controls and new ceiling fans, replacing variable air volume systems, and correcting plumbing deficiencies. The contractor is also responsible for providing new signage and managing the movement and protection of all loose furniture. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the Notice to Proceed. Award will be determined using the best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience, with minimum ratings of Satisfactory and Acceptable required, respectively. The contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to strict quality control, safety, and ADA accessibility standards. Proposals must be submitted electronically to the Contracting Officer by November 9, 2026, and must include a detailed bid schedule in Excel and technical documentation in PDF format.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project is estimated between 10 million and 25 million dollars with a performance period of 730 days after award. The comprehensive scope of work includes selective demolition, building envelope repairs, new roofing with a 20-year warranty, and exterior wall system updates. Interior improvements consist of reconfiguration, new finishes, epoxy mortar flooring, and the installation of a full NFPA-compliant fire suppression system. Infrastructure upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires site improvements including paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract is divided into two primary exhibit line items: ELIN 0001 for building renovation and ELIN 0002 for paving work. Award will be based on the lowest price, and bidders must propose on all line items to avoid rejection. Performance is subject to the Davis-Bacon Act and Buy American requirements. Bonding requirements are tiered, with proposals exceeding 150,000 dollars requiring bid, payment, and performance bonds. Quality control is managed through a three-phase process requiring a government-accepted QC Plan and adherence to various ASTM and NFPA standards. Administrative requirements include monthly invoicing via Wide Area Work Flow using NAVFAC Form 7300/30 and the submission of detailed monthly work-hour and safety reports.
Bristol Alliance of Companies

POSTED

about 6 hours ago

DEADLINE

in 26 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, focuses on basin improvements in California, specifically within the Riverside and Los Angeles project areas. The solicitation is designated as a set-aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The response deadline for this opportunity is November 4, 2026. A critical component of this contract is the strict adherence to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements, which are expanded from State Water Resources Control Board standards to secure project financing. To avoid being deemed non-responsive, bidders must provide proof of specific actions within their bid package, including posting solicitations in an online publication for 30 consecutive calendar days, a print newspaper posting for at least one day, and documented utilization of the Small Business Administration and Minority Business Development Agency. While outreach documentation such as call logs or emails may be submitted up to three business days after the bid closing, failure to meet the primary posting and agency utilization requirements prior to the opening date will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 6 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, mechanical and electrical utilities, and an underground stormwater retention system. An additional option for the P1016 facility includes the construction of a 17,978 square foot laboratory and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 6 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected dormitory rooms, vanity areas, hallways, offices, and conference rooms across the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to Small Businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone firms. Award will be based on best value, with evaluation weights assigned to price (60 percent), quality (20 percent), past performance (10 percent), and schedule (10 percent). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a W9, a completed vendor questionnaire, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific Executive Orders regarding minimum wage and paid sick leave. Contractors must comply with OSHA safety regulations, NFPA-101 life safety codes, EPA regulations, and all applicable local and state building codes. Insurance requirements include automobile liability coverage of 200,000 dollars per person and 500,000 dollars per occurrence, with Adams and Associates, Inc. named as an additional insured. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 6 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
The Springdale Job Corps Center, operated by Career Systems Development Corporation for the U.S. Department of Labor, is seeking proposals for the interior renovation and repair of the North Wing dormitory in Troutdale, Oregon. The project focuses on restoring water-damaged areas, including residential rooms, bathrooms, common areas, and mechanical rooms, to return them to safe residential use. Key deliverables include the installation of drywall for approximately 300 square feet of floor area in mechanical rooms, the restoration of walls and ceilings, and the testing of restored mechanical, plumbing, electrical, fire/life-safety, and security systems. The contractor must provide a minimum one-year workmanship warranty and adhere to Center standards. This solicitation is a small business set-aside under NAICS 236220 and is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100, Modification 1. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of the award. Proposals must include detailed relevant experience, a comprehensive description of the proposed work and phasing, and itemized pricing that remains firm for 60 days. The project timeline is scheduled for completion between February 1st and March 31st, 2024, with a response deadline for the solicitation set for November 20, 2026.
Career Systems Development Corporation

POSTED

about 6 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The City of Pembroke Pines is soliciting bids under solicitation number PSUT-26-06 for turnkey construction services for the Phase 2 Polk Building Renovations located at 8200 South Palm Drive. This final project phase aims to unify the Utilities Administration, GIS Division, and the Customer Service and Billing Department into a single location. The scope of work includes comprehensive mechanical installations with integration into the City's Trane Building Management System, plumbing for overhead lines and bathroom fixtures, and the framing and finishing of interior walls. Notably, the installation of the lift station is excluded from this scope. The estimated project cost is 4,729,608 dollars, and the contract will be awarded to the most responsive and responsible bidder. Bids must be submitted via the OpenGov portal by the October 2026 deadline, with submissions via mail, email, or fax strictly prohibited. The City provides a 2.5 percent preference for Veteran Owned Small Businesses and requires DBE certification from Broward County's Office of Economic and Small Business Development. Awardees must provide payment and performance bonds totaling 100 percent of the contract price and adhere to prevailing wage requirements. All materials must be new and of the highest quality, delivered F.O.B. destination in original packaging. Payment processing is managed through the PaymentWorks platform. Primary points of contact for this solicitation are Giraldo Hernandez, Assistant Public Services Director, and Jamie Chen, Procurement Specialist.

General Info

Bids for turnkey construction services for Phase 2 Polk Building renovations in Pembroke Pines.

Documents

32

22-42_WS_Plan-C-2 Concrete Sewer Layout and Utility Notes

PDF, High priority: read this first1 page · sow
High

Construction Agreement - City of Pembroke Pines

PDF, High priority: read this first34 pages · contract-document
High

Contractual Services Agreement - City of Pembroke Pines

PDF, High priority: read this first32 pages · contract-document
High

Davis-Bacon Wage Determination FL20250197 for Broward County, FL

PDF, High priority: read this first7 pages · wage-determination
High

Engineering Design Services Agreement - City of Pembroke Pines

PDF, High priority: read this first25 pages · contract-document
High

HUD Section 3 Implementation Plan and Forms

PDF, High priority: read this first8 pages · sow
High

IFB # PSUT-26-06 Phase 2 Polk Building Renovations

PDF, High priority: read this firstifb
High

IFB # PSUT-26-06 Phase 2 Polk Building Renovations

PDF, High priority: read this first59 pages · ifb
High

IFB # PSUT-26-06 Phase 2 Polk Building Renovations

PDF, High priority: read this first51 pages · ifb
High

IFB PSUT-26-06 Phase 2 Polk Building Renovations

PDF, High priority: read this first59 pages · ifb
High

IFB # PSUT-26-06: Phase 2 Polk Building Renovations

PDF, High priority: read this firstifb
High

IFB # PSUT-26-06: Phase 2 Polk Building Renovations

PDF, High priority: read this first59 pages · ifb
High

IFB # PSUT-26-06: Phase 2 Polk Building Renovations

PDF, High priority: read this firstifb
High

Internal Guidance for Davis-Bacon Wage Decisions

DOCX, High priority: read this first5 pages · wage-determination
High

Polk Building Access Control System Drawings and Notes

PDF, High priority: read this first5 pages · specifications
High

Polk Building Fire Sprinkler Performance Specification FS1.1-FS2.0

PDF, High priority: read this first3 pages · specifications
High

Polk Building Landscape Irrigation Schedule and General Notes

PDF, High priority: read this first5 pages · specifications
High

Polk Building Renovation Phase 2 Construction Documents

PDF, High priority: read this first24 pages · specifications
High

Polk Building Renovation Phase 2 Technical Specifications July 21, 2026

PDF, High priority: read this first321 pages · specifications
High

Polk Building Renovation Site Engineering Plans

PDF, High priority: read this firstspecifications
High

Polk Mechanical Cleaning and Service Notes

PDF, High priority: read this first7 pages · specifications
High

Polk Plumbing Fixture Connection Schedule and Notes

PDF, High priority: read this first5 pages · specifications
High

SEC-001 BT Polk Building Low Voltage Cable and Access Control Notes

PDF, High priority: read this first1 page · specifications
High

Access Control System Compliance and Hardware Specifications - SEC-302

PDF, Low priority1 page · specifications
Low

HUD Davis-Bacon and Labor Standards Contractor Guide Addendum

PDF, Low priority21 pages · other
Low

LNL-3300 Intelligent System Controller Product Cut Sheets

PDF, Low priority15 pages · specifications
Low

POLK BUILDING ACCESS CONTROL SYSTEM Wiring Diagram F-33025-01

PDF, Low priority1 page · specifications
Low

Polk Electrical Specifications

PDF, Low priority11 pages · specifications
Low

Sample Insurance Certificate for City of Pembroke Pines

PDF, Low priority1 page · insurance-certificate
Low

SEC-000 Polk Building Access Control System Drawings

PDF, Low priority1 page · specifications
Low

SEC-101 Polk Building Access Control System Plan

PDF, Low priority1 page · specifications
Low

Standard Release of Lien - City of Pembroke Pines

PDF, Low priority1 page · release-of-lien
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Sep 29, 2026 to Sep 8, 2026.

Deadline changed

Response deadline changed from Sep 8, 2026 to Sep 15, 2026.

Deadline changed

Response deadline changed from Sep 15, 2026 to Oct 6, 2026.

Deadline changed

Response deadline changed from Oct 6, 2026 to Oct 13, 2026.

Deadline changed

Response deadline changed from Oct 13, 2026 to Oct 20, 2026.

Deadline changed

Response deadline time changed from 6:00 PM UTC to 6:30 PM UTC on Oct 20, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Utilities
Contacts2 people available
OfficePembroke Pines, FL, 33025, USA
Organization / AgencyFlorida → Utilities
Office AddressPembroke Pines, FL, 33025, USA
Contacts
Giraldo HernandezAsst. Public Services Director
Jamie ChenProcurement Specialist

Interested Companies (109)

Heica ConstructionMiramar, FL
ClimatixMIAMI, FL
Mills Electric ServiceFort Lauderdale, FL

See All 109 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Pembroke Pines, Florida, ranked as the eleventh largest city among the state's four hundred plus municipalities and the second largest in Broward County, maintains a welcoming small-town ambiance that resonates with its residents. Located conveniently in southwest Broward County, the city provides seamless access to major highways, employment centers, entertainment venues, parks, golf courses, and a diverse array of dining and shopping options. With a population of approximately 170,000 residents spread across 32.68 square miles, Pembroke Pines is renowned as one of the best cities to live in America. The city boasts 28 superior parks, lush landscaping, and a distinctive South Florida charm that contributes to its natural beauty. Notably recognized as 2024's Best Place to Raise a Family in Florida, and 2024's Best City of Hispanic Entrepreneurs by WalletHub, Pembroke Pines also earned a place as the on Money Magazine's esteemed Best Places to Live list in 2014, as the sole Florida representative, ranking in at #32 in the nation. Incorporated in 1960, Pembroke Pines is celebrated as a safe and desirable community, having received accolades such as the All-America City designation. The city's commitment to arts and culture, exceptional schools, diverse population, numerous parks, and forward-thinking approach in an ever-evolving world make it a standout destination. Pembroke Pines is also the home to the largest municipal-run charter school system in the nation, serving over 6,000 students across five separate campuses. The City's award-winning charter school system is located in the Broward County School District, which is the sixth largest school district in the nation.

More opportunities from Florida → Utilities

Same awarding agency

NAICS: 237110
SLED
Replacement of Water Service Lines (Age and/or Emergency)
Solicitation # 26-T01417
Hernando County Utilities is soliciting bids for a term contract under solicitation number 26-T01417 for the replacement of water service lines due to age or emergency. The project requires an experienced and licensed underground and excavation contractor to furnish and install 1-inch and 2-inch long side and short side water services using open cut methods. The scope of work includes the installation of corporation stops, service tubing, tracer wire, and curb stops, as well as the abandonment of existing lines. Contractors are responsible for full site restoration, including saw cutting, lime rock backfill, asphalt restoration using type SP 12.5, and sod replacement. All work must adhere to HCUD construction specifications, DPW Facility Design Guidelines, and FDOT standards. Bids are due by November 9, 2026, via the County eProcurement Portal, with a mandatory pre-bid conference held on October 14, 2026. The contract will be awarded to the lowest responsive and responsible bidder on an all-or-none total offer basis, with a local preference for businesses located within Hernando County. Key requirements include a minimum of 5 million dollars in excess or umbrella liability insurance, compliance with OSHA and FDOT safety standards, and the provision of performance and payment bonds for projects valued at 250,000 dollars or more. Payment is processed via ACH within 45 days following the submission of invoices and passing density tests for roadway restoration.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 12 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS