Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Pine Creek Wildlife Area Hazardous Fuel Reduction Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pine Creek Wildlife Area Hazardous Fuel Reduction Project, managed by the California Department of Fish and Wildlife, focuses on reducing detrimental wildfire impacts through strategic fuel reduction treatments. Located in Modoc County near Alturas, the project involves the removal of juniper across approximately 250 acres, specifically targeting areas within meadows and within 200 feet of streams. Additionally, prescriptive and cultural fire treatments will be implemented across most of the property at various intervals. The project is governed by CEQA Guidelines Sections 15304 and 15308, ensuring that activities do not involve construction or the removal of healthy, mature, scenic trees. Performance standards mandate that the work must not result in environmental degradation, significant erosion, sedimentation of surface waters, or the harming of rare, endangered, or threatened species. Teresa Spade serves as the primary environmental scientist and lead agency contact for the project.

General Info

CDFW fuel reduction project in Modoc County involving juniper removal and prescribed burns.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

Place of Performance

Pine Creek Boulevard at Pine Creek Wildlife Area, Alturas, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Teresa SpadeEnvironmental Scientist

Full Description

Show more
The project consists of fuel reduction treatments to reduce the potential for detrimental wildfire impacts. The juniper removal component of the project area, comprising areas in meadows and within 200 feet of streams, is ~250 acres in size. The prescriptive and cultural fire component of the project will cover most of the property at various times.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning contracts in the McAllister Creek area. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the contractor to identify and retain desirable crop trees while removing competing vegetation and shrubs. Key performance standards include strict slash management, where debris must be cleared from roadways, trails, and water sources, and pulled back four feet from ditches and streams. Stumps must be completely severed and generally maintain a height of less than five inches. Bids are due by 4:00 PM on November 17, 2026, and must be physically delivered to the mailbox at the Mt Tolman Complex; electronic submissions are not permitted. A complete bid packet must include a detailed work plan, a bid evaluation form, TERO compliance and utilization forms, proof of contractor liability insurance, and a signed debarment certification. Award decisions are not based solely on the lowest price, and the Tribe reserves the right to reject any bid. Contractors must comply with the Tribal Employment Rights Ordinance (TERO) and the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. A TERO contract fee of 5% applies to contracts of $5,000 or more, though TERO Title 10 certified contractors may avoid these fees. Payment is based on a per-acre bid price for accepted acreage, with 20% of each payment withheld until final acceptance. Partial payments are generally restricted to units larger than 10 acres unless weather shutdowns occur. Damage to leave trees will result in financial deductions of $3 per tree.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 11 days
View Details
NAICS: 115310
New
International
BR28TBP001 - Brushing on the Sunshine Coast
Solicitation # BR28TBP001
Solicitation BR28TBP001, issued by the BC Timber Sales Branch of the Province of British Columbia, is for vegetation management services specifically focused on brushing on the Sunshine Coast. The scope of work involves manual cutting and girdling of target species within designated treatment units. Key performance standards require that target species be cut completely through without hinges, with stump heights and angles not exceeding 30 centimeters and 30 degrees respectively. Girdling must involve a continuous visible ring of at least 1.5 cm in width. In areas with low-lying brush, contractors must create crop circles by cutting brush to a height of 30 cm within a 1 meter radius of crop trees. The contract is awarded to the lowest priced compliant tender based on the total bid price. Quality is verified by a Ministry Representative using 50 square meter inspection plots; a treatment unit must have at least 90 percent satisfactory plots to qualify for payment. The work is designated as a Multi Employer Workplace, requiring the Prime Contractor to ensure strict compliance with the Workers Compensation Act and Occupational Health and Safety Regulations, including the management of safety meetings, workplace inspections, and emergency response plans. The project covers several blocks including Lois Lake, Mt Elphinstone, Haslam Lake, McNair Creek, and Brooks Lake, with access varying between 4x4 and helicopter.
BC Timber Sales Branch

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS