Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Olympic Heights - Old Greenwood Fuel Reduction Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Truckee Fire Protection District

Place of Performance

Fairway Drive and Union Mills Road, Truckee, CA, 96161

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Truckee Fire Protection District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Truckee Fire Protection District
Office AddressN/A
Contacts

Full Description

Show more
The Olympic Heights / Old Greenwood Fuelbreak project is a high-priority Community Wildfire Protection Plan Project (CWPP) funded by “Measure T” that will be implemented by The Truckee Fire Protection District (TFPD). The project includes implementation of forest fuels reduction activities in the form of manual and mechanical thinning, mastication, and tracked chipping on an approximately 230-acre footprint. The project area is located on undeveloped lots owned by Truckee Donner Land Trust and Tahoe Club Company LLC within and adjacent to Interstate 80 and the Old Greenwood and Olympic Heights subdivisions. The project interfaces with smaller developed lots with homes and aims to improve defensible space for over 80 small private parcels that interface with the project area. The project is an integral part of the TFPD’s landscape fuel reduction strategy aimed at protecting the Truckee community and Wildland Urban Interface from future catastrophic wildfire events. This fuel reduction treatment is strategically located in order to moderate the movement of wildfire, provide safer egress for evacuating citizens, provide safer ingress for resources related to suppression activities, and ultimately facilitate in the protection of life and property for surrounding communities. The prescription includes thinning from below of small diameter conifers less than 16” DBH and shrubs to achieve adequate vertical and horizontal spacing. A large majority of trees needing removal are less than 10” DBH. Post treatment conditions should result in increased canopy base height and quadratic mean diameter, with the largest most vigorous trees retained in a well-spaced arrangement. In order of retention, species preference would be Sugar Pine/Western White Pine, Jeffrey Pine/Ponderosa Pine, Lodgepole Pine, White Fir.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning contracts in the McAllister Creek area. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the contractor to identify and retain desirable crop trees while removing competing vegetation and shrubs. Key performance standards include strict slash management, where debris must be cleared from roadways, trails, and water sources, and pulled back four feet from ditches and streams. Stumps must be completely severed and generally maintain a height of less than five inches. Bids are due by 4:00 PM on November 17, 2026, and must be physically delivered to the mailbox at the Mt Tolman Complex; electronic submissions are not permitted. A complete bid packet must include a detailed work plan, a bid evaluation form, TERO compliance and utilization forms, proof of contractor liability insurance, and a signed debarment certification. Award decisions are not based solely on the lowest price, and the Tribe reserves the right to reject any bid. Contractors must comply with the Tribal Employment Rights Ordinance (TERO) and the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. A TERO contract fee of 5% applies to contracts of $5,000 or more, though TERO Title 10 certified contractors may avoid these fees. Payment is based on a per-acre bid price for accepted acreage, with 20% of each payment withheld until final acceptance. Partial payments are generally restricted to units larger than 10 acres unless weather shutdowns occur. Damage to leave trees will result in financial deductions of $3 per tree.
Confederated Tribes of the Colville Reservation

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details
NAICS: 115310
New
International
BR28TBP001 - Brushing on the Sunshine Coast
Solicitation # BR28TBP001
Solicitation BR28TBP001, issued by the BC Timber Sales Branch of the Province of British Columbia, is for vegetation management services specifically focused on brushing on the Sunshine Coast. The scope of work involves manual cutting and girdling of target species within designated treatment units. Key performance standards require that target species be cut completely through without hinges, with stump heights and angles not exceeding 30 centimeters and 30 degrees respectively. Girdling must involve a continuous visible ring of at least 1.5 cm in width. In areas with low-lying brush, contractors must create crop circles by cutting brush to a height of 30 cm within a 1 meter radius of crop trees. The contract is awarded to the lowest priced compliant tender based on the total bid price. Quality is verified by a Ministry Representative using 50 square meter inspection plots; a treatment unit must have at least 90 percent satisfactory plots to qualify for payment. The work is designated as a Multi Employer Workplace, requiring the Prime Contractor to ensure strict compliance with the Workers Compensation Act and Occupational Health and Safety Regulations, including the management of safety meetings, workplace inspections, and emergency response plans. The project covers several blocks including Lois Lake, Mt Elphinstone, Haslam Lake, McNair Creek, and Brooks Lake, with access varying between 4x4 and helicopter.
BC Timber Sales Branch

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS