Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Eucalyptus Removal Restoration Project at Morro Dunes Ecological Reserve (Project)

Forecast
2081(a)-25-016-RPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Debaki SarkarEnvironmental Scientist
Mark LaRueDeputy Director of Planning and Building

Full Description

Show more
CDFW is issuing a California Endangered Species Act (CESA) permit pursuant to Fish and Game Code section 2081, subdivision (a) to the County of San Luis Obispo (Permit No. 2081(a)-25-016-RP) for a project to remove invasive eucalyptus (Eucalyptus globulus) and restore approximately 0.84 acres of occupied Morro manzanita (Arctostaphylos morroensis) habitat that has been degraded by dense tree growth and accumulated biomass. The objective of the Project is to restore native chaparral habitat, promote long-term persistence of Morro manzanita, and reduce wildfire risk within the Pecho Unit and surrounding reserve lands. Approximately 28 mature eucalyptus trees and associated saplings and stumps across a 2.75-acre work area will be felled and removed using low-impact forestry equipment. Two non-native pine trees may also be removed. Felled material will be chipped, hauled off-site, or, if conditions allow, disposed of through controlled pile burning in coordination with the California Department of Forestry and Fire Protection. Morro manzanita individuals will be protected and avoided to the greatest extent feasible through pre-activity biological surveys, flagging of plants, and establishment of no disturbance buffers around occupied areas. Erosion control measures such as coir logs will be installed to stabilize any disturbed soils, and invasive species management will target eucalyptus resprouts and perennial veldt grass (Ehrharta calycina) using targeted herbicide application that will be applied quarterly if necessary. Following tree removal activities, the site will rely primarily on passive revegetation from the existing Morro manzanita seed bank and adjacent native stands.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning contracts in the McAllister Creek area. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the contractor to identify and retain desirable crop trees while removing competing vegetation and shrubs. Key performance standards include strict slash management, where debris must be cleared from roadways, trails, and water sources, and pulled back four feet from ditches and streams. Stumps must be completely severed and generally maintain a height of less than five inches. Bids are due by 4:00 PM on November 17, 2026, and must be physically delivered to the mailbox at the Mt Tolman Complex; electronic submissions are not permitted. A complete bid packet must include a detailed work plan, a bid evaluation form, TERO compliance and utilization forms, proof of contractor liability insurance, and a signed debarment certification. Award decisions are not based solely on the lowest price, and the Tribe reserves the right to reject any bid. Contractors must comply with the Tribal Employment Rights Ordinance (TERO) and the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. A TERO contract fee of 5% applies to contracts of $5,000 or more, though TERO Title 10 certified contractors may avoid these fees. Payment is based on a per-acre bid price for accepted acreage, with 20% of each payment withheld until final acceptance. Partial payments are generally restricted to units larger than 10 acres unless weather shutdowns occur. Damage to leave trees will result in financial deductions of $3 per tree.
Confederated Tribes of the Colville Reservation

POSTED

about 17 hours ago

DEADLINE

in 11 days
View Details
NAICS: 115310
New
International
BR28TBP001 - Brushing on the Sunshine Coast
Solicitation # BR28TBP001
Solicitation BR28TBP001, issued by the BC Timber Sales Branch of the Province of British Columbia, is for vegetation management services specifically focused on brushing on the Sunshine Coast. The scope of work involves manual cutting and girdling of target species within designated treatment units. Key performance standards require that target species be cut completely through without hinges, with stump heights and angles not exceeding 30 centimeters and 30 degrees respectively. Girdling must involve a continuous visible ring of at least 1.5 cm in width. In areas with low-lying brush, contractors must create crop circles by cutting brush to a height of 30 cm within a 1 meter radius of crop trees. The contract is awarded to the lowest priced compliant tender based on the total bid price. Quality is verified by a Ministry Representative using 50 square meter inspection plots; a treatment unit must have at least 90 percent satisfactory plots to qualify for payment. The work is designated as a Multi Employer Workplace, requiring the Prime Contractor to ensure strict compliance with the Workers Compensation Act and Occupational Health and Safety Regulations, including the management of safety meetings, workplace inspections, and emergency response plans. The project covers several blocks including Lois Lake, Mt Elphinstone, Haslam Lake, McNair Creek, and Brooks Lake, with access varying between 4x4 and helicopter.
BC Timber Sales Branch

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS