Lower Manzanita Phase 1

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Lower Manzanita Phase 1 project is a fuels reduction initiative located in Markleeville, California, within Alpine County. The project encompasses approximately 30 acres across two private landowner parcels, specifically the Boyde property on Diamond Valley Road and the Denio property on Bryan Way. The primary objective is to mitigate wildfire hazards by reducing fuel loading and altering fuel arrangement to decrease flame length, intensity, and rate of spread. The treatment area is characterized by native sagebrush habitat and fire-damaged conifers. To achieve the desired post-treatment conditions, where projected flame lengths are limited to 2-4 feet, the contractor will perform mechanical mastication on 70% of the sagebrush while leaving 30% in a discontinuous mosaic to maintain habitat. Additional tasks include chipping woody material to retain soil moisture, hauling materials to designated sites, improving and restoring access, and limbing remaining trees to a minimum height of 10 feet. Operational execution is subject to strict environmental and safety constraints. Equipment operations are restricted to weekdays between 7:00 am and 5:00 pm, and no machinery may be used on slopes exceeding 20% or in areas with saturated soils. To protect sensitive resources, the contractor must adhere to specific protocols regarding Environmentally Sensitive Areas (ESA) and Cultural Resource (CR) buffer zones, which include prohibitions on vehicle access, pile burning, and mechanical thinning in designated zones. Within CR avoidance areas, activities are limited to hand thinning, and any new discoveries require an immediate work stoppage and notification of a qualified specialist. Furthermore, the contractor is responsible for implementing safety measures for chainsaw and mastication equipment use, maintaining fuel containment at refueling sites to prevent spills, and ensuring compliance with all relevant air quality permits.

General Info

Mechanical mastication and fuel reduction on 30 acres in Markleeville to mitigate wildfire hazards.

Agency

California → Alpine County

Place of Performance

Bryan Way and Diamond Valley Road, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Alpine County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Alpine County
Office AddressN/A
Contacts
Samuel BoothCommunity Development Director

Full Description

Show more
The project is located within the community of Markleeville, California. The project area is comprised of an ~30 acre treatment area consisting of two private landowner parcels. Parcel 001-080-097 (Boyde) consists of 2.0 acres, parcel 002-230-018 (Denio) consists of 20.0 acres in Markleevillage of eastern Alpine County. The Lower Manzanita Denio property is located at 41 Bryan Way, and the Boyde property is located at 457 Diamond Valley Road. The project areas are dominated by native sagebrush habitat of California Wildlife Habitat Relationship (CWHR) size class varies, and fire damaged conifers that range from 4-14” DBH. The proposed project will reduce the continuity of sagebrush and hazard trees in an effort to reduce hazardous fuel loading and arrangement such that the flame length, intensity, rate of spread, and duration of potential wildfire is reduced. The proposed project will 1) Utilize mechanical mastication to reduce the extent of sagebrush on site, targeting 70% of the sage for mastication, 2) leave remaining sagebrush in a discontinuous, mosaic fashion 30% for habitat which will not contribute to horizontal or vertical fuels, 3) Chipping/mulch of woody material in the masticated zones to retain soil moisture and aid in fire resilience. 4) Hauling of materials to a designated spot on project sites and access improvement/restoration. Limb remaining trees to a minimum height of 10 feet as measured from the lowest live green limb to the top of the surface fuels. The desired, post treatment stand conditions will not contribute to initiating or sustaining a crown fire and will have projected flame lengths of less than 2-4 feet in the surface fuels, with increased resilience to wildfire. The resulting stand would appear well thinned with the primary carrier of the fire being leaves and/or grasses. The proposed action will effectively reduce hazardous fuels within the project area.

Similar Contracts

Same NAICS industry code

NAICS: 115310
New
SLED
San Poil Forest, McAllister Creek PCT Highway 21 Blocks 2027
Solicitation # McAllister-Creek-PCT-Highway-21-Blocks-2027.pdf
The Confederated Tribes of the Colville Reservation, through San Poil Forestry, is soliciting bids for two Pre-Commercial Thinning contracts in the McAllister Creek area. The project encompasses a total of 23.77 acres, divided between Unit SP-15-PCT-27 (10.33 acres) and Unit SP-16-PCT-27 (13.44 acres). The scope of work requires the contractor to identify and retain desirable crop trees while removing competing vegetation and shrubs. Key performance standards include strict slash management, where debris must be cleared from roadways, trails, and water sources, and pulled back four feet from ditches and streams. Stumps must be completely severed and generally maintain a height of less than five inches. Bids are due by 4:00 PM on November 17, 2026, and must be physically delivered to the mailbox at the Mt Tolman Complex; electronic submissions are not permitted. A complete bid packet must include a detailed work plan, a bid evaluation form, TERO compliance and utilization forms, proof of contractor liability insurance, and a signed debarment certification. Award decisions are not based solely on the lowest price, and the Tribe reserves the right to reject any bid. Contractors must comply with the Tribal Employment Rights Ordinance (TERO) and the Occupational Safety and Health Act of the Confederated Tribes of the Colville Reservation as administered by TOSHA. A TERO contract fee of 5% applies to contracts of $5,000 or more, though TERO Title 10 certified contractors may avoid these fees. Payment is based on a per-acre bid price for accepted acreage, with 20% of each payment withheld until final acceptance. Partial payments are generally restricted to units larger than 10 acres unless weather shutdowns occur. Damage to leave trees will result in financial deductions of $3 per tree.
Confederated Tribes of the Colville Reservation

POSTED

about 16 hours ago

DEADLINE

in 11 days
View Details
NAICS: 115310
New
International
BR28TBP001 - Brushing on the Sunshine Coast
Solicitation # BR28TBP001
Solicitation BR28TBP001, issued by the BC Timber Sales Branch of the Province of British Columbia, is for vegetation management services specifically focused on brushing on the Sunshine Coast. The scope of work involves manual cutting and girdling of target species within designated treatment units. Key performance standards require that target species be cut completely through without hinges, with stump heights and angles not exceeding 30 centimeters and 30 degrees respectively. Girdling must involve a continuous visible ring of at least 1.5 cm in width. In areas with low-lying brush, contractors must create crop circles by cutting brush to a height of 30 cm within a 1 meter radius of crop trees. The contract is awarded to the lowest priced compliant tender based on the total bid price. Quality is verified by a Ministry Representative using 50 square meter inspection plots; a treatment unit must have at least 90 percent satisfactory plots to qualify for payment. The work is designated as a Multi Employer Workplace, requiring the Prime Contractor to ensure strict compliance with the Workers Compensation Act and Occupational Health and Safety Regulations, including the management of safety meetings, workplace inspections, and emergency response plans. The project covers several blocks including Lois Lake, Mt Elphinstone, Haslam Lake, McNair Creek, and Brooks Lake, with access varying between 4x4 and helicopter.
BC Timber Sales Branch

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS