Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on June 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Piping and Valving Supply (Material Supplier)

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423730
SLED
ANNUAL REQUIREMENTS CONTRACT FORFOR AIR CONDITIONING PARTS AND SUPPLIES COUNTYWIDE
Solicitation # 608015-26
Clark County, Nevada, is soliciting bids for an annual requirements contract for air conditioning parts and supplies to be used countywide under solicitation number 608015-26. The contract is divided into 17 distinct packages based on manufacturers and product types, including specialized lines from Robert Shaw, Copeland, Grundfos, Bell and Gossett, Emerson, US Motors, Magnetik, Reznor, Raypak, Rapid Locking System, Ambro Controls, Gentech Evergreen, and Diversitech. The total annual estimated spend across all packages is 530,000 dollars. Required deliverables include a wide range of HVAC components such as reversible motors, controllers, thermostats, brazing kits, and maintenance supplies like coil cleaners and vacuum pump oil. Bids must be submitted by September 17, 2026, at 3:00 PM PT. A non-mandatory pre-bid conference was scheduled for September 8, 2026, and the bid opening will be held via WebEx on September 17, 2026. Bidders must adhere to strict substitution rules, providing the exact product for items marked as no substitute and providing the manufacturer and part number for items marked as or equal. The primary point of contact for this procurement is Cain Gomez within the Purchasing and Contracts department. Submissions must include representative contact information, local facility details, and specific unit pricing for each line item.
Nevada Government Marketplace

POSTED

12 days ago

DEADLINE

in 5 days

AI Contract Overview

Show more

Cobb County is seeking qualified suppliers to provide UL and FM-listed fire-rated piping, isolation valves, check valves, and backflow preventers for a fire pump system under a subcontract arrangement. The required materials must meet stringent industry certifications to ensure compliance with fire safety standards and system integrity. The solicitation is open for responses until July 23, 2026, with no specified set-aside preferences or small business limitations indicated. The North American Industry Classification System code 423730 applies, identifying the scope as wholesale trade of hardware, plumbing, and heating equipment. All components must be delivered and installed at the designated project location in Georgia, though specific city or address details are not provided. Interested parties should review the full solicitation via the official Georgia Department of Administrative Services portal to understand technical specifications, quantity requirements, delivery schedules, warranty terms, and certification documentation expectations.

General Info

Cobb County seeks UL/FM-listed fire-rated piping and valves for fire pump system by July 23, 2026, in Georgia.

Agency

Georgia → Cobb CountyView Agency

NAICS

423730 - Warm Air Heating and Air-Conditioning Equipment and Supplies Merchant WholesalersView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-77050-NONST-2026-000000092.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

26-6995 - Juvenile Court Fire Pump Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Cobb County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → Cobb County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of UL/FM-listed fire-rated piping, isolation valves, check valves, and backflow preventers for fire pump system.

More opportunities from Georgia → Cobb County

Same awarding agency

NAICS: 237310
New
SLED
Notice of Intent to Advertise - Design Build Services for the Chattahoochee River Trail Project
Solicitation # PE-77050-NONST-2027-000000105
The Cobb County Department of Transportation is soliciting Design-Build services for Phase II of the Chattahoochee River Trail Project, identified as PI No. 0019617 and Project No. B2432. Located in Mableton, Georgia, the project involves the design, permitting, and construction of approximately 1.3 miles of a shared-use bike and pedestrian path. Key infrastructure elements include a 10 to 17-foot wide path with intermittent modal separation, a bridge over an unnamed creek, boardwalks over wetlands and environmentally sensitive areas, and the implementation of nature-based stormwater Best Management Practices. The project is classified as a Category 1 Design-Build project and will follow Georgia Department of Transportation processes. The procurement process utilizes a two-phase Best Value Bid selection method. In the first phase, the selection committee will evaluate Statements of Qualifications to identify up to five finalists based on project management experience, key personnel qualifications, and a minimum of ten years of relevant firm experience. These finalists will then proceed to the second phase, where they will submit technical and price proposals. The final award will be granted to the Design-Builder with the highest combined score. The response deadline for the pre-solicitation phase is January 15, 2027, with the project following a tentative schedule through April 2027.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS