Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Piping Installation – 3" SDR-21 PVC Pipe

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract entails the installation of 2,620 linear feet of 3-inch SDR-21 PVC pipe for the replacement of an existing waterline, ensuring compliance with industry standards for durability and pressure handling. The scope includes full pressure testing and comprehensive leak detection procedures to verify system integrity before final acceptance. All work must be performed in accordance with applicable codes and best practices for potable water infrastructure. The project is situated in Potter County, Pennsylvania, with all materials and labor required to be delivered and completed on-site. This subcontract opportunity is open for bidding with a response deadline of July 28, 2026, and is classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction. The solicitation is issued by Potter County in Pennsylvania, and interested parties must submit proposals through the designated Pennsylvania bidding portal by the stated deadline. There is no specified set-aside classification, meaning the contract is open to all qualified subcontractors regardless of business size or demographic status.

General Info

Install 2,620 linear feet of 3-inch PVC waterline in Potter County, PA, with pressure testing by July 28, 2026.

Agency

Pennsylvania → Potter CountyView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Potter County, PA, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyPennsylvania → Potter County
ContactsNo contacts available
OfficeN/A
Organization / Agency
Pennsylvania → Potter County
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of 2,620 linear feet of 3-inch SDR-21 PVC pipe for waterline replacement, including pressure testing and leak detection.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
SLED
Emerson St. Sinkhole RepairThe contract pertains to the repair of a stormwater drainage issue along Emerson Street involving the replacement of a disconnected section of pipe that formerly linked to the main King County stormwater line beneath the roadway. Work includes excavation to access the damaged segment, removal of the old infrastructure, installation of a new pipe section, and the creation of a secure connection to the main line. Additional tasks involve backfilling the trench and repaving the affected asphalt surface to restore the street to its original condition. Given the location on a busy arterial road, the project necessitates extensive traffic management measures, including lane closures and controls, to maintain public safety and minimize disruption during construction. The contracting entity is the Port of Seattle, specifically through its Waterfront Project Management division, with the work classified under NAICS code 237110 for sewer and water infrastructure. The solicitation was posted in July 2026 and is currently in forecast status, indicating it is an upcoming opportunity for contractors to prepare bids. Primary contact for inquiries is Marilynn Montenegro, with Brandon Klett serving as the project manager. The exact location of the work is on Emerson Street, though specific city and state details are not provided in the data. All communication and formal inquiries should be directed through the provided contact details for the Port of Seattle.
Waterfront Project Management

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
SLED
1947 Watermain - North Bound Airport Expressway PreservationThe Port of Seattle’s Aviation Project Management Group is preparing to restore the integrity of a 1947 water main located along the northbound Airport Expressway using cured-in-place pipe (CIPP) technology under a Design-Bid-Build procurement model. This project aims to rehabilitate the aging infrastructure without full excavation, leveraging CIPP to create a durable, seamless liner within the existing pipe, thereby extending its service life and maintaining water system reliability. The work is classified under NAICS code 237110, indicating it falls under utility system construction, and will be executed to meet current engineering and safety standards for municipal water infrastructure. Moraa Omwega serves as the primary point of contact for the solicitation, with Ray Moreno listed as the Project Manager, both reachable through the Port of Seattle’s official channels. The anticipated timeline for the bid process begins with a posting date of July 26, 2026, suggesting that the formal solicitation and bid submission phases are expected to commence in late 2026. The project will be performed at the specified location along the Airport Expressway, though exact geographic details such as city, state, or zip code are not provided in the available data. Interested parties are encouraged to monitor the designated UI link for official documentation, schedule updates, and compliance requirements as they become available.
Aviation Project Management Group

POSTED

about 4 hours ago

DEADLINE

N/A
View Details
NAICS: 237110
New
International
Greater Mandeville Water Supply Improvement Project- Pepper/Goshen Distribution Network- Old Pepper Well to Old Pepper Main Road, Manchester/St. ElizabethThe National Water Commission of Jamaica is soliciting bids for the supply and delivery of 1 kilometer of 250mm nominal diameter ductile iron pipes along with all necessary associated fittings for the Greater Mandeville Water Supply Improvement Project. The work is focused on the Pepper/Goshen Distribution Network, specifically extending from the Old Pepper Well to the Old Pepper Main Road in Manchester and St. Elizabeth. Bidders must ensure compliance with all technical and quality specifications for the pipes and fittings, as the project aims to enhance water infrastructure reliability in the region. The solicitation is open to qualified suppliers and contractors who can meet the required delivery and installation standards. The solicitation, identified by number 1618/1423, was posted on July 24, 2026, and responses must be submitted no later than August 19, 2026, at 4:00 PM. The contract does not specify a set-aside designation and is classified under the government of Jamaica’s broader water infrastructure program. All correspondence and submissions should be directed through the official ePPS portal, with no physical office address or point of contact listed. The place of performance is confined to the designated路段 in Manchester and St. Elizabeth, and bidders are expected to account for logistics, handling, and timely delivery to meet project timelines and operational requirements.
National Water Commission

POSTED

2 days ago

DEADLINE

in 24 days
View Details

More opportunities from Pennsylvania → Potter County

Same awarding agency

NAICS: 238990
SLED
Contingency Work ManagementThis contract under the title Contingency Work Management authorizes the execution of undefined or unforeseen tasks that arise unexpectedly during project operations, particularly those requiring rapid response such as emergency repairs or unplanned design modifications. It operates under a contingency allowance, allowing for flexible allocation of funds to address urgent needs without the delays typically associated with formal change orders, while still maintaining structured change order management protocols to ensure accountability and documentation. The work is scoped to support dynamic project requirements in Potter County, Pennsylvania, with performance expected on-site within the county location. The contract is classified as a subcontract with NAICS code 238990, indicating it relates to other specialty trade contractors, and was posted on June 26, 2026, with a required response deadline of July 28, 2026. There is no solicitation number provided, and no specific set-aside type or organization type is identified, leaving the competition open to eligible subcontractors who can demonstrate capability to respond swiftly and efficiently to emerging work demands. All activities are tied to the administrative oversight of Potter County, Pennsylvania, and interested parties must submit proposals through the official Pennsylvania bidding portal linked in the contract data.
All Other Specialty Trade Contractors

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details
NAICS: 238220
SLED
Instrumentation & Controls InstallationThe contract titled Instrumentation & Controls Installation involves the full lifecycle support of instrumentation systems for mechanical systems, encompassing supply, installation, wiring, termination, configuration, calibration, and integration of sensors, transmitters, and controllers. This work is critical to ensuring accurate monitoring and control of mechanical operations and requires technically qualified personnel capable of meeting industry standards for precision and reliability. The contract is structured as a subcontract under NAICS code 238220, indicating classification within specialty trade contracting for electrical and related installations, and is issued by Potter County in Pennsylvania with a place of performance located within Potter County. The solicitation was posted on June 26, 2026, and responses are due by July 28, 2026, at 6:00 PM. While the solicitation number is not provided and no set-aside type is specified, bidders must prepare proposals tailored to the technical scope and performance requirements outlined by the agency, ensuring compliance with all applicable standards for instrumentation systems. The contract does not include details regarding payment terms, duration, or specific deliverables beyond the scope of work described, and all necessary coordination and logistics are assumed to be managed by the subcontractor. Proposals should demonstrate experience in similar instrumentation projects and the capacity to complete installation and integration in a field environment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details
NAICS: 237110
SLED
Wetmore Run Well DevelopmentThe Galeton Borough Authority is soliciting bids for the Wetmore Run Well Development project, which involves bringing two pre-drilled and cased water wells online, installing connecting piping to existing treatment facilities, adding new electrical service entrances and emergency generators, upgrading the current treatment infrastructure, and connecting to the municipal potable water distribution system. Bids must be submitted by 2:00 PM local time on Tuesday, July 28, 2026, either electronically through PennBid.net or via hard copy delivered to 24 West Main Street, Galeton, PA 16922, and will be publicly opened immediately after that time at the same location. The project is divided into three prime contract packages: 2026-W1 for General/Mechanical work, 2026-W2 for Waterline Replacement, and 2026-W3 for Electrical/Controls/Instrumentation. Bidding documents are available free of charge on PennBid.net or at Century Engineering’s office in State College, PA, during regular business hours, with an optional paid option for mailed copies at $250, which is non-refundable. A non-mandatory pre-bid conference is scheduled for July 7, 2026, at the Authority’s offices. Each bid must include a certified check or bid bond equal to ten percent of the total bid amount, along with a completed Non-Collusion Affidavit and other required documentation. Bids may be held for up to 60 days for review and bidder qualification verification, and the Authority reserves the right to reject any bids, waive irregularities, or negotiate terms. Federal Davis-Bacon prevailing wage rates apply as the project is funded by federal assistance.
Water and Sewer Line and Related Structures Construction

POSTED

about 1 month ago

DEADLINE

in 2 days
View Details