Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on September 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PKAA, DRUM Little Long North Project

Closed
DQ1-PKAA-2027000058-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 8 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The DRUM Little Long North Project, solicitation DQ1 PKAA 2027*0058, is a construction effort managed by the Colorado Department of Natural Resources, Division of Reclamation, Mining and Safety. The project involves safeguarding 35 mine features, including adits and shafts, through various closure methods such as bat grates, polyurethane foam backfill, and bulkheads. Work is located on federal lands managed by the Bureau of Land Management in Montrose and San Miguel counties. The construction window is scheduled from October 5 to November 30, 2026, with a total performance period of 56 calendar days following the Notice to Proceed, which includes 10 days for mobilization. The contract will be awarded to the low responsive and responsible bidder based on the base bid plus additive alternates. Bidders must demonstrate experience with at least two similar mine safety closure projects and provide a comprehensive list of equipment to be used. Key requirements include adherence to Davis-Bacon Act wage rates, Build America, Buy America preferences, and strict safety protocols regarding radiation hazards and fire restrictions. Contractors must also maintain SAM registration and provide performance and labor bonds if the bid exceeds 150,000 dollars. The final bid submission deadline is September 16, 2026, at 4:00 p.m. MT via the Colorado VSS portal.

General Info

Colorado DNR construction project to secure 35 mine features in Montrose and San Miguel.

Documents

15

Abandoned Uranium Mine Site Work Safety Procedures (Revised 7/1/2024)

PDF, High priority: read this firstspecifications
High

Am#2 DRUM Little Long North Feature Work List

PDF, High priority: read this firstamendment
High

Amendment No. 1 - DQ1 PKAA 2027*0058 (DRUM Little Long Project)

PDF, High priority: read this firstamendment
High

Amendment No. 2 DQ1 PKAA 2027*0058 - DRUM Little Long North

PDF, High priority: read this firstamendment
High

DQ1 PKAA 2027*0058 - DRUM Little Long North Bid Schedule

PDF, High priority: read this firstspecifications
High

DQ1 PKAA 2027*0058 - DRUM Little Long North Project Special Conditions

PDF, High priority: read this firstrfq
High

DQ1 PKAA 2027*0058 - DRUM Little Long North Revised Bid Schedule

PDF, High priority: read this firstamendment
High

DRUM Little Long North Feature Work List

PDF, High priority: read this firstspecifications
High

DRUM Little Long North Helicopter Staging Area Map

PDF, High priority: read this firstspecifications
High

DRUM Little Long North SHEAP

PDF, High priority: read this firstspecifications
High

General Decision Number: C020260003 - Colorado Heavy Construction

PDF, High priority: read this firstwage-determination
High

Model Construction Agreement with Federal Provisions - Colorado

PDF, High priority: read this firstcontract-document
High

DQ1 PKAA 2027*0058 - DRUM Little Long North Pre-bid Attendance

PDF, Low priorityother
Low

Fire Prevention Order COS01-26-01 - Stage 1 Fire Restrictions

PDF, Low priorityspecial-notice
Low

List of Equipment Offered form

DOCX, Low priorityform
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → DNR - Division Of Reclamation Mining & Safety
Contacts2 people available
OfficeCO, USA
Office AddressCO, USA
Contacts
Teresa DonaldsonBuyer
DonaldsonRequester

Full Description

Show more
8/10/26 DQ1 PKAA 2027*0058 posted to VSS. See attachments tab for links to all related documents. 8/11/26 DQ Amendment 1 (A#1) posted to VSS to update link in Special Conditions. See attachments tab for link. 9/9/26 DQ Amendment 2 (Am#2) posted to VSS. See attachments tab for links to all related documents.

More opportunities from Colorado → DNR - Division Of Reclamation Mining & Safety

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS