Plasencia Elementary School Playground and Campus Exterior Upgrades

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Plasencia Elementary School Playground and Campus Exterior Upgrades project, managed by the Los Angeles Unified School District, involves comprehensive improvements to the 5.6-acre campus in the Echo Park neighborhood of Los Angeles. With an approved budget of 10,074,344 dollars, the scope of work includes replacing approximately 38,000 square feet of paving in two main and two kindergarten playgrounds with new asphalt featuring solar reflective coating. Additional campus enhancements include greening and landscaping, the installation of privacy fencing, exterior building painting, and critical infrastructure upgrades such as underground utilities and accessibility improvements. The project must adhere to all state, federal, and local regulations, including the California Environmental Quality Act and the December 2023 Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects. Key operational requirements include mandatory soil sampling and testing prior to demolition, strict compliance with South Coast Air Quality Management District Rule 1466 for soil import and export, and the immediate cessation of work upon the discovery of subsurface resources or contaminants. Furthermore, the contractor must maximize construction waste recycling and obtain written approval from the school principal for tree removal, which may require nesting bird surveys if performed between February 1 and August 31.

General Info

LAUSD project for Plasencia Elementary campus upgrades and playgrounds with a 10 million budget.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles Unified School District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Christy WongCEQA Project Manager

Full Description

Show more
The Project will replace approximately 38,000 square feet of paving in two main playgrounds and two kindergarten playgrounds with new asphalt paving with solar reflective coating. The scope of work also includes greening and landscaping throughout the Campus, along with privacy fencing and exterior painting of buildings as needed. Additionally, the Project will provide infrastructure upgrades including underground utilities and accessibility upgrades (Figure 1). The Los Angeles Unified School District Board of Education approved the Project's budget of $10,074,344 on February 29, 2024. The Project will be implemented pursuant to all applicable State, federal, and local regulations, and all applicable LAUSD specifications, standards, and/or guidelines, including those in compliance with the California Environmental Quality Act (CEQA) and the updated Standard Conditions of Approval for District Construction, Upgrade, and Improvements Projects (SCs) as adopted by the Board of Education in December 2023. LAUSD’s SCs, design guidelines, and best management practices are designed to be incorporated into the Project design in order to avoid or limit potential adverse impacts associated with the District’s projects. The beneficiaries of the Project include Plasencia ES students, faculty, staff, families, school supporters, and the community at large who may request access to the playground pursuant to the Civic Center Act (CA Ed. Code Sections 38130 -38139).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9801 - Madison LakeWay - SkyLine Improvements
Solicitation # 9801
Contract 9801 for the Madison LakeWay – SkyLine Improvements is a solicitation by the City of Madison for the construction of a half-mile linear parkway along the shoreline of Lake Monona adjacent to John Nolen Drive. The project scope is divided into a Base Bid, covering the installation of north and south pile-supported timber-framed boardwalks, pedestrian-scale lighting, enhanced paths, bicycle amenities, wayfinding signage, and extensive landscaping, and an Alternate Bid Item for the construction of the SkyLine Pier. The project also requires significant traffic control, including the implementation of vehicular and bicycle detours and the installation of curb, gutter, and colored concrete medians. The contract will be awarded to the lowest bidder based on unit prices and a grand total. Bidders must provide a bid bond of at least 5 percent of the bid and comply with strict Small Business Enterprise (SBE) participation goals and reporting requirements. Additionally, contractors must adhere to Best Value Contracting apprenticeship standards and non-discrimination policies. Technical requirements include the use of a Wisconsin-registered Professional Engineer for precast and connection designs, adherence to ADA guidelines for signage, and the provision of site mock-ups for masonry, metal, and wood elements. Construction must commence within seven calendar days of receiving a written notice to proceed.
City of Madison

POSTED

about 1 hour ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine
Solicitation # W912WJ27BA003
Solicitation W912WJ27BA003 is a 100 percent small business set-aside for the maintenance and advance maintenance dredging of the Isle au Haut Thoroughfare Federal Navigation Project in Maine. The project involves mechanically dredging approximately 3,355 cubic yards of highly compacted coarse sand, gravel, cobbles, and small boulders from a 1,200-foot long channel to a depth of -7 feet Mean Lower Low Water, with an additional one-foot allowable overdepth for a maximum depth of -8 feet. All dredged material will be transported and placed at the Flake Island Disposal Site to enhance juvenile lobster and cod habitats. The estimated price range for this effort is between 1,000,000 and 3,000,000 dollars. Performance is strictly governed by an environmental window from September 15, 2026, to March 15, 2027, with all dredging and disposal activities required to be completed by March 1, 2027. The mandatory performance period is 120 calendar days after the receipt of the Notice to Proceed. Award is based on a sealed bidding process under NAICS 237990, requiring performance and payment bonds. Contractors must utilize the Procurement Integrity Enterprise Environment for submissions and adhere to a three-phase quality control process, including preparatory, initial, and follow-up inspections, with all documentation managed via a Construction Management Platform.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, estimated between $1 million and $5 million, involves repairing and extending a seawall damaged by Hurricane Ian. The scope of work includes selective demolition, the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the addition of a structural FRP composite sheet pile wall extension to the east, and various civil works such as excavation, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. Award selection will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, schedule, management approach, safety, project experience, key personnel experience, and past performance—are combined to be significantly more important than price. Due to the sensitive location, the contractor must adhere to strict environmental protection procedures to protect marine mammals, sea turtles, and endangered species, and must comply with the Marine Mammal Protection Act and the Endangered Species Act. Key personnel requirements include a Project Manager, Job Site Superintendent, Quality Control Manager, and Safety Manager. Invoicing is processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a signed cover letter from the Contracting Officer's Representative.
Dsc Contracting Services Division

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Los Angeles Unified School District

Same awarding agency

NAICS: 236220
New
SLED
Best Value - 2710066 - Los Angeles High School - Wellness Clinic
Solicitation # 2710066
The Los Angeles Unified School District is soliciting bids for the construction of a new 6,000 square foot Wellness Center at Los Angeles High School, located at 4650 West Olympic Blvd. The project scope includes the creation of a facility for medical, dental, and mental health services, the removal of seven existing relocatable buildings, site improvements such as parking and landscaping, and the restoration of a natural grass play field. The project is divided into four construction phases with a total duration of 730 calendar days, including mobilization and closeout periods. The prime contractor must hold a Class B General Building Contractor license and adhere to the District's Project Stabilization Agreement and prevailing wage requirements. The contract is awarded using a Best Value methodology, where the lowest cost per quality point determines the winner. The procurement process consists of two steps: an initial evaluation of Statements of Qualifications based on a 1,000-point scale—weighting management competency, relevant experience, and past performance most heavily—followed by a price bid submission for shortlisted firms. The District's contract bond estimate is 18,934,000.00, and contractor-caused compensable delays are penalized at 1,500.00 per calendar day. All submissions must be uploaded in PDF format via the Ariba Business Network, adhering to a 50-page limit and a strict Cone of Silence regarding communications with district officials.
Commercial and Institutional Building Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS