Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Florida was posted on May 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Polk Parkway 570B SR 60 Water and Wastewater Line Relocation

Closed
26-16State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is seeking MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the construction of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and necessary drainage, underdrain, inlet, pipe, tie-in, and downspout work. Additionally, the project requires limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor, as well as the planting of six native trees and approximately 345 native plants. The goal is to treat approximately 1.7 acres of impervious surface within a 3.3-acre drainage area, concluding with final stabilization, cleanup, and restoration. This solicitation is open to various small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, disadvantaged, woman-owned, and minority-owned businesses. To accommodate the project scale, these entities are encouraged to form consortiums if individual bid items are too large for a single firm to handle. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties should contact Jonah Leith or Jennifer Wilson for further details and must provide a response indicating their intent to bid.
Harbel, Inc.

POSTED

about 12 hours ago

DEADLINE

in 4 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins and associated pipe fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, and surface restoration, alongside the excavation of cobbles and large boulders. This solicitation, posted on September 11, 2026, with a response deadline of September 29, 2026, is open to small businesses, including certified service-disabled veteran-owned, minority, and women-owned enterprises. The prime contractor, J.W. Fowler, is actively seeking subcontractor pricing and offering support to M/W/DBE firms regarding bonding, insurance, and equipment procurement to maximize participation.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract involves the relocation of water and wastewater utilities in Bartow, Florida, necessitated by the construction of the Polk Parkway extension near SR 60. The City of Bartow, under the direction of FDOT, is responsible for this utility relocation to accommodate the roadway project. This solicitation, titled "Polk Parkway 570B SR 60 Water and Wastewater Line Relocation," was posted on May 27, 2026, with a response deadline of July 1, 2026. The project is managed by the Public Works agency in Bartow, targeting contractors capable of performing these utility adjustments in coordination with the highway extension. Points of contact for this contract include Corbett Watson, the Assistant Director of Public Works, and Evan Markewich, the Senior Procurement Analyst, both reachable via provided email and phone numbers. The scope of work likely entails detailed utility mapping, deconstruction, and reconstruction to ensure uninterrupted water and wastewater services while supporting FDOT's infrastructure improvements. This solicitation is publicly listed and open for qualified bids by the stated deadline.

General Info

Relocate water and wastewater utilities in Bartow for Polk Parkway SR 60 extension, bid by July 1, 2026.

Agency

Florida → Public WorksView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

FL, USA

Set-Aside

NONE

Documents

(3)

Polk Parkway 570B SR 60 Water and Wastewater Line Relocation Appendix - Supplemental Information

PDFsow

SR-570B Phase II SR60 Utility Relocates - Specifications and Bid Form

PDFspecifications

ITB Polk Parkway 570B SR 60 Water and Wastewater Line Relocation

PDFitb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Public Works
Contacts2 people available
OfficeBartow, FL, 33831-1069, USA
Organization / Agency
Florida → Public Works
View Agency Profile
Office AddressBartow, FL, 33831-1069, USA
Contacts
Corbett WatsonAssistant Director of Public Works
Evan MarkewichSenior Procurement Analyst

Full Description

Show more
FDOT is requiring the City of Bartow to relocate water and wastewater utilities due the construction of the Polk Parkway extension in the area of SR60 in Bartow Florida.

More opportunities from Florida → Public Works

Same awarding agency

NAICS: 541330
New
SLED
Professional Water Management Consulting Engineering Services for Commercial Irrigation Monitoring, Technical Support, and CUP Compliance
Solicitation # 20260236
The City of Port St. Lucie is seeking a qualified consulting engineering firm to provide professional water management services for 50 commercial irrigation sites. The scope of work focuses on irrigation monitoring, technical support, and ensuring compliance with Consumptive Use Permits (CUP) and Florida Statute 373.62(7) variance requirements. The selected consultant will be responsible for 24/7/365 monitoring of 1,444 zones using Rain Bird Maxicom II and Baseline central control systems, providing the necessary software to the City free of charge, and conducting annual smart site inspections with reports due to the South Florida Water Management District by February 1 each year. All services must adhere to the City of Port St. Lucie Public Works Irrigation Standards 328400. The contract is for an initial term of three years with one optional two-year renewal. To be eligible, the firm must employ a Florida licensed Professional Engineer and a licensed Irrigation Contractor, both with at least five years of experience. Additional staffing requirements include a Certified Landscape Irrigation Auditor, a training expert with a degree from a U.S. accredited institution, and personnel proficient in CRBasic programming. The procurement is conducted under the Consultants’ Competitive Negotiation Act, utilizing a best-value analysis that weights qualifications and experience at 70 percent and methodology at 30 percent, followed by an oral presentation. Invoices are submitted monthly and paid in accordance with Florida’s Prompt Payment Act.
Engineering Services

POSTED

2 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS