Pond Modernization Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Pond Modernization Project at California State University, Sonoma in Rohnert Park involves a comprehensive upgrade to the campus's backup fire water and reclaimed water infrastructure. The work includes temporarily dewatering both ponds to facilitate sediment removal, relining the pond structures, and repairing the existing piping system connecting the two bodies of water. To enhance system performance and environmental conditions, new aeration, filtration, and pumping systems will be installed, aimed at increasing oxygen levels in the ponds and ensuring reliable water supply for emergency and reuse purposes. The project is designed to modernize aging infrastructure, improve water quality, and support long-term operational resilience. The initiative is managed by the university's administration, with Dana Twedell, Associate Vice President, serving as the primary point of contact. The project was posted on June 30, 2025, as a forecast notice under the agency's oversight in California, though specific procurement details such as solicitation number, NAICS code, or set-aside type have not been designated at this stage. All work is to be performed at the specified location in Rohnert Park, and interested parties can find additional information through the provided web link.
General Info
Agency
NAICS
Place of Performance
Rohnert Park, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
