Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on July 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

POTTLE LAKE TREATMENT PLANT MEMBRANE TANK RELINING

Closed
CBRM-P07-2026International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Project FDC-214-102565.1 involves the demolition of an existing concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County, Pennsylvania. Managed by the Pennsylvania Department of Conservation and Natural Resources, the scope of work encompasses site preparation, including the installation and removal of erosion and sediment control measures and the implementation of a traffic control plan. Technical requirements include stripping and stockpiling topsoil, surface water control, dewatering subgrades, excavation, and the placement of select fill. The project concludes with site restoration, including topsoil application and seeding in all disturbed areas. All work must adhere to specific ASTM International standards for soil analysis and compaction, and the contractor is required to provide a complete set of as-built drawings upon completion. The contract will be awarded to the lowest responsible and responsive bidder, with an engineer's estimate exceeding 1 million dollars. Bidders must meet mandatory participation goals of 19 percent for Small Disadvantaged Businesses and 3 percent for Veteran Business Enterprises. Required securities include a bid guaranty, a 100 percent performance bond, a 100 percent material and labor payment bond, and a 50 percent maintenance bond. Contractors must comply with extensive Pennsylvania state labor laws, including the Prevailing Wage Act and the Construction Workplace Misclassification Act. Payments are processed via Automated Clearing House, and the contractor is responsible for engaging an independent testing laboratory for quality control services, subject to oversight by the Department's quality assurance program.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 11 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 11 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Cape Breton Regional Municipality is undertaking the relining of a second primary membrane tank at the Pottle Lake Water Treatment Plant in North Sydney, NS, as part of ongoing infrastructure maintenance. The tank to be relined has approximate interior dimensions of 4840mm in height, 3780mm in length, and 900mm in width. This follows the 2021 relining of the two secondary membrane tanks and the winter 2026 relining of primary membrane tank #1. The schedule for relining the final primary membrane tank remains unconfirmed. The solicitation number for this project is CBRM-P07-2026, posted on July 8, 2026, with a response deadline of July 23, 2026. All tender documents and amendments must be obtained through the Nova Scotia Procurement Portal, as CanadaBuys may not reflect the most current information. The contracting authority is the Cape Breton Regional Municipality, with inquiries directed to [email hidden]. Third-party platform registration or fees may be required to access documents or submit responses.

General Info

CBRM to relin second primary membrane tank at Pottle Lake Plant, tender CBRM-P07-2026, deadline July 23, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Cape Breton Regional Municipality
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
PurchasingContracting Authority

Full Description

Show more
The Pottle Lake Water Treatment Plant in North Sydney, NS, has two (2) secondary membrane tanks and four (4) primary membrane tanks. The secondary tanks were relined in 2021 and the primary membrane tank #1 was relined in the winter of 2026. CBRM is now proceeding with relining of a second primary membrane tank as part of ongoing maintenance of the water treatment plant. The approximate existing interior dimensions of the tank are 4840mm high, 3780mm long and 900mm wide. The schedule to reline the last two (2) primary membrane tanks has not yet been confirmed. Cost of acquiring documents: Not Applicable Terms of payment for acquiring documents: Not Applicable Tender notices on CanadaBuys published for Nova Scotia Public Sector Entities may not reflect amendments. For tender documents and up-to-date addenda, refer to the Nova Scotia Procurement Portal: https://procurement-portal.novascotia.ca/tenders/CBRM-P07-2026 For additional detail on contract duration, refer to the tender documents. Note that in some cases, third-party hosting platform registration and/or fees may be required to review related documents, or to submit tender responses.

More opportunities from Government of Canada → Cape Breton Regional Municipality

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS