Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on August 8, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Power Pole Replacements at the Hollyburn Mountain

Closed
ISED-211751International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
115kV Transmission Line 1266 Rebuild Stanton North Substation to Dead-End Structure 79
Solicitation # 26-012
Nebraska Public Power District is soliciting sealed bids for Contract No. 26-012 to rebuild approximately 4.05 miles of the 115kV transmission line 1266, extending from the Stanton North substation to Dead-End Structure 79. The scope of work includes the installation of 28 wood H-Frame tangent structures and one steel monopole dead-end on a drilled pier. Additionally, the project requires upgrading existing conductors and shield wires to 954 45/7 ASCR Rail conductor and 7/16 inch EHS steel shield wire, as well as the installation of .551 diameter fiber optic ground wire from Structure 107 to Dead-End Structure 79. The contractor is responsible for providing all necessary labor, supervision, tools, equipment, and miscellaneous materials. The contract will be awarded to the responsible bidder offering the lowest cost and best bid, with evaluation factors including price, technical conformance, schedule, qualifications, and performance history. Bids must be submitted in sealed hard copy form to the Procurement Department in Columbus, Nebraska, by December 2, 2026, at 2:00 PM. Required submission documents include the proposal page, price quotation table, bid security, and a W-9 form. The contractor must maintain comprehensive insurance, including workers compensation and commercial general liability, and provide a contract performance bond. A non-mandatory pre-bid teleconference and site visit are scheduled for November 23, 2026.
Nebraska Public Power District

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
W072 Endist Chicago

POSTED

1 day ago

DEADLINE

in 8 days

AI Contract Overview

Show more

Innovation, Science and Economic Development Canada requires a contractor to replace 11 aging and decaying power poles and associated hardware at a property on Hollyburn Mountain in West Vancouver. The contractor is responsible for providing all labor, equipment, and materials, specifically replacing the designated poles with cedar poles and transferring existing wires to the new structures. All work must be completed by March 31, 2026, with on-site construction permitted Monday through Friday from 7:30 a.m. to 5:30 p.m. The contractor must manage all permits, licenses, and safety protocols in accordance with the Canada Labour Code, including the provision of a company safety plan. Key operational requirements include maintaining public traffic safety, removing all debris daily, and providing 48 hours notice before entering the site. Any modifications to the work schedule or technical scope require a formal Change Order approved by the Project Authority. The contractor is also expected to maintain high availability, responding to inquiries within 24 hours and attending meetings within 48 hours of a request.

General Info

Contractor to replace 11 power poles in West Vancouver by March 31, 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Department of Industry
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Funto OyeboluPoint of Contact

Full Description

Show more
1. Project Title Hollyburn Mountain - Power Pole Replacements 2. Background Innovation, Science & Economic Development Canada (ISED) maintains a property on Hollyburn Mountain, West Vancouver which is served by BC Hydro via private power line connection. The existing power poles are aging and will require maintenance and replacement 3. Project Requirements/Objectives The Contractor will be responsible for supplying all labour, equipment, materials, and tools to complete the scope of work identified in section 4.0 below. 4. Scope of Work/Tasks The work consists of replacement of 11 power poles along the power line path. 11 poles are subject to aging and decay. Poles 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12 require replacement along with the associated hardware. Figure 1 – Powerline Path See attached documents for picture. 5. Deliverables/Timelines Replace poles 1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12 in place with cedar pole, replace existing hardware and insulators with new. Transfer existing wires to new pole. All work is to be completed by March 31, 2026 6. Project Constraints 6.1 Suspension of Work Notwithstanding any wording specified in clause GC7.2 (2018-06-21) Suspension of Work under SACC R2870D, in the event of a work suspension, the Contractor shall update the work schedule with the assistance and approval of the Project Authority. 6.2 Schedule/Timeline The Contractor must complete all the work on or before the date specified in Appendix B Bid and Acceptance Form of the ITT. Construction is permitted on-site Monday-Friday between the hours of 7:30 a.m. and 5:30 p.m. 7.0 Work Location There is no address posted in front of the building (Lot 12, Block B, District Lot 1123, Plan 2486). The GPS coordinates are: LAT: 49.364083 LON: -123.186194 on the ITT .] See attached documents for location pictures. 8.0 Official Languages All correspondence with the Project Authority and deliverables are to be provided in English. 9.0 Travel No travel is associated to this contract. 10. Security There are no security requirements associated to this contract. 11. Intellectual Property There is no Intellectual Property associated to this contract. 12. Project Details 12.1. Protection of Public Traffic The Contractor must: Provide and maintain access roads, sidewalk crossings, ramps and construction runways as may be required for access to work. Provide and maintain competent signal flag operators, traffic signals, barricades and flares or lanterns as required to perform work and protect public. Place equipment in position to present minimum of interference and hazard to travelling public. Keep equipment units as close together as working conditions permit and preferably on same side of travelled way. Not leave equipment on travelled way overnight. Not close any lanes of road without approval of the Project Authority. Before re-routing traffic erect suitable signs and devices in accordance with applicable codes. Maintain access to property including overhead clearances for use by emergency response vehicles. 12.2. Liabilities The Contractor shall assume responsibility for any accident or damage caused by its employees and/or equipment to STS property or personnel as a result of the Contractor’s activities. The Contractor shall assume responsibility for the security of its equipment and materials during and after working hours. STS shall not be liable for any vandalism, theft or loss. The Contractor shall be responsible for making whatever representations are necessary to the pertinent organizations in order to carry out the Work. The costs incurred in obtaining these documents shall be the responsibility of the Contractor. The Contractor is responsible for notifying the Project Authority of any on-site activity and obtaining approval to gain access 48 hours before entering the site. 12.3 Health and Safety Program The Contractor will be responsible to take all necessary steps to protect the workers from harm in accordance with revised statutes of the current Canada Labour Code. Emergency procedures including fire, health and safety requirements applicable to work taking place are the responsibility of the Contractor. Adherence to health and safety measures are mandatory for all on-site personnel and all site visitors. All Contractor employees and all site visitors shall have the appropriate safety equipment and training. The Contractor must also be prepared to provide a copy of their company safety plan. 12.4. Contract and Schedule Changes The Project Authority is responsible for approving any modifications to the work schedule or to the technical content of the Work. The Contractor will not implement any changes to the Work in the Contract before the Project Authority has authorized a Change Order. The Change Order will specify the nature of the change, the time frame in which it must be carried out and any additional cost associated to the change. A copy of the approved Change Order will be provided to the Contractor and to the Project Authority by the Contracting Authority. 12.5. Materials Unless otherwise specified, the Contractor must supply, deliver and install all materials required for project execution. All materials to be new with manufacturer’s seal intact and labeled. The Contractor shall be responsible for having its materials delivered to the Hollyburn Mountain facility, then transporting the said materials from there to the work site. 12.6. Removal of Debris Contractor shall remove from the work site at the end of each work shift or as instructed by the Project Authority all rubbish or debris generated from the work activity. Contractor will be responsible to clean the area and any other space that has been affected by his activity. 12.7. Training Assign trained, qualified labour. Ensure that all resources assigned to projects have the training, certificates or licenses of qualification require by law prior to performing any work. 12.8. Permits, Licenses and Certificates All permits, licenses and certificates of approval required for the Work to be completed under federal, provincial or municipal legislation shall be obtained by contractor prior or after project completion whatever the case might be; the contractor shall be responsible for any charges imposed by such regulation or legislation. Upon request, Project Authority might ask for a copy of such permit, license or certificate. 12.9. Service Availability Ensure that labour is capable and available to perform the work according to the schedule agreed upon by the Contractor and the STS within 2 days (48 hours) from receipt of request. 13. Management of the Project – Roles and Responsibilities 13.1 Project Authority: (To be entered at contract award) The Project Authority is responsible for the planning of the procurement, providing a clear definition of the requirement; ensuring funding is available and monitoring of the project. The Project Authority provides instructions and interpretations to the Contractor regarding the technical aspects of the work to be done and will recommend payment after acceptance of the work performed. 13.2 Contractor Representative: (To be entered at contract award) The Contractor shall establish and maintain, throughout the duration of the contract, a team capable of effectively delivering the services described in this document and in keeping with the Project Construction Schedule. The Contractor shall deliver the work within the time frame and assigned budget in accordance with the approved plan agreed to by the Project Authority. Upon execution of the contract, the Contractor shall be responsible for producing all work in a conscientious and professional manner. The Contractor shall coordinate project requirements with any and all other base building renovation work that will be underway. The Contractor representative for the contract is: Name: Title: Telephone: E-mail: 13.3. Contracting Authority: The Contracting Authority is the contracting officer and is responsible for authorizing any changes to the Contract in writing. The Contractor is not to perform work in excess of or outside the scope of this Contract based on verbal or written requests or instructions from any government personnel other than the aforementioned officer. The Contracting Authority for the contract is: Funto Oyebolu Procurement and Contracting Officer Contracts & Material Management, Corporate Management Sector Innovation, Science and Economic Development Canada| Government of Canada 235 Queen St. | Ottawa, ON K1A 0H5 | contact@example.gov 14. Coordination with the Spectrum and Telecommunications Sector (STS): Upon contract award, the Contractor shall: Carry out services in accordance with this ITT directions given by the Project Authority. Correspond only with the Project Authority at the times and in the manner dictated by the Project Authority. The Contractor shall not communicate with the client department unless so authorized in writing by the Project Authority. Advise the Project Authority of any changes that may affect schedule or budget or are inconsistent with instructions or written approvals previously given. The Contractor shall detail the extent and reasons for the changes and obtain written approval before proceeding. Investigations and/or site reviews in public areas shall be performed during regular hours. Ensure all activities performed shall provide for the protection of the health and safety of the facility's occupants shall not disturb the facility's security systems and procedures and shall not disturb the operations performed in and around the facility. 15. Project Response Time Requirements: It is a requirement of all projects covered under this ITT that the prime Contractor should be personally available to attend meetings within 48 hours’ notice to the Project Authority’s request (and respond to inquiries by email/phone within 24 hours), in the locality of the place of the work, and respond to inquiries from the date of the award of the Contract until final inspection and turnover. The Contractor must be able to demonstrate the availability of adequate resources within their proposed team(s) to deliver the scope of services outlined in this ITT in a timely fashion. 16. PRIORITY DOCUMENTS FORMING PART OF ANY RESULTING CONTRACT If there is a discrepancy between wordings in any documents that appear on the list, the wording of the document that first appears on the list has priority over the wording of any document that subsequently appears on the list. (a) The Contract for Construction. (b) The Standards Acquisitions Clauses and Conditions. (c) The Invitation to Tender, its Terms of Reference, Specifications, Drawings, any Appendices and Referenced Attachment(s); and (d) The Contractor's bid dated ____________ (insert date of bid) (If the bid was clarified or amended, insert at the time of contract award: “as clarified on ____________” or “as amended on_____________” and insert date(s) of clarification(s) or amendment(s))

More opportunities from Government of Canada → Department of Industry

Same awarding agency

NAICS: 238220
International
Sprinkler Maintenance, Repairs, and Installation Services
Solicitation # ISED216270
Innovation, Science and Economic Development Canada is soliciting bids for sprinkler maintenance, repairs, and installation services at the Shirley's Bay Campus located at 3701 Carling Avenue in Ottawa, Ontario. The contract is awarded on an as and when requested basis and covers an initial period from the award date to March 31, 2027, with three optional one-year extensions extending the total potential duration to 2030. The estimated total expenditure for the contract is not to exceed 139,200.00 dollars plus HST. The selected contractor must provide qualified, licensed technicians to perform quarterly, semi-annual, and annual inspections, replace defective components with new parts, and handle retrofits and network connectivity issues. The contractor is required to maintain 24/7 emergency support capabilities, acknowledging emergency requests within one hour and responding on-site for non-emergencies within 48 hours. All work must adhere to applicable building codes and quality assurance standards, with deficiency reports submitted within 20 days of inspection. Award selection is based on the lowest evaluated price among bidders who meet all mandatory technical criteria. Payment is processed via direct deposit or wire transfer within 30 days of receiving an acceptable invoice supported by time sheets and progress reports. The contract includes specific labor allocations for certified technicians, assistants, and supervisors, along with a theoretical materials value of 20,000 dollars.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

8 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS